Short answer: keep the shield bonded and fix what it bonds to. A ±0.25 °C wander on a 7 m PT100 cable is usually a floating 24 VDC reference or a resistive PE termination. The shield is only the antenna that makes the fault visible. Tie the supply's M terminal to PE once, clean and tighten the PE path, land the braid at the cabinet end only, and your reading settles to within one count of the module's 0.25 °C minimum resolution. Lifting the shield hides the symptom and leaves the fault waiting for the next channel you wire.
What the reading tells you
Six details from the bench narrow this down before you open a meter:
- The value wanders about ±0.25 °C only while the shield sits on PE. The braid is coupling something into the signal wires, or dragging a reference with no solid earth of its own.
- Lifting the shield makes it steady. The noise rides the braid; your reference or your PE path is the fault, and the sensor is healthy.
- The wander is one display count. The module's stated minimum resolution is 0.25 °C with no hardware filter, so the last count always breathes a little.
- Both PT100 channels move together. That points to common-mode on the shared reference, a floating supply M, rather than either sensor.
- One channel moves alone. Start with that channel's terminations and its own cable run.
- The value steps between two numbers instead of drifting. A contact opening and closing; every 0.1 Ω of it reads as 0.26 °C.
One count, in ohms and microvolts
A PT100 is 100.0 Ω at 0 °C and climbs about 0.385 Ω per °C, the slope of the IEC 60751 curve for 0.00385 sensors. One display count is 0.25 °C × 0.385 Ω/°C = 0.096 Ω, a tenth of an ohm. RTD cards excite with roughly 1 mA — your module's datasheet prints the exact figure — so the element sits near 100 mV, and one count is 0.096 Ω × 1 mA = 96 µV. You are chasing a signal the size of one terminal's thermal EMF, which is why small grounding sins show up here and nowhere else.
Length is not your problem at 7 m: the wiring guidance for this class of module draws the line at 10 m [30 ft]. What length adds is resistance you must keep balanced. At about 84 mΩ/m for 24 AWG (0.22 mm²) copper, each conductor runs 7 m × 0.084 Ω/m = 0.59 Ω. A three-wire input cancels that only while all three leads match. One lug that flickers by 0.1 Ω flickers your display by 0.1 / 0.385 = 0.26 °C; the whole symptom fits inside one loose screw.
Check the supply reference first
Most 24 VDC supplies ship floating: M has no connection to PE inside the unit. The module measures your PT100 against M, so a floating M rides on mains coupling. The three conductors turn that common-mode movement into a real reading through their small capacitance differences to the braid. Bonding the shield at the cabinet then makes matters worse, because you have earthed the braid while the circuit it guards still floats.
Prove it with a DMM on AC volts, 10 MΩ input, from M to PE. A floating output commonly shows tens of volts AC to PE, often near half the mains voltage, leaking through the supply's internal filter capacitors. Land M on the cabinet PE bus through one conductor and that reading collapses below 1 V. The piece on grounding the 0 V of a 24 V supply walks through where the single bond belongs.
The bond goes in once, at the cabinet, on a labelled terminal. A second M-to-PE tie in another panel fed from the same supply rebuilds the loop you just cut.
Then measure the PE path
A shield tied to a resistive PE point stops draining and starts radiating. It collects ambient noise and holds it on the braid, millimetres from your signal wires. The old shop-floor line — check the wall socket first — is the right instinct. Measure from the cabinet PE bus to the ground bar that feeds it: a sound path in one cabinet reads tenths of an ohm, and near 1 Ω you hunt the joint.
Three places hide that resistance. Paint under a lug: NEC 250.12 requires paint, lacquer and enamel removed from threads and contact surfaces at grounding and bonding connections. A hinge or mounting foot asked to carry PE: bond the mounting panel with a real conductor, the way NEC 250.96(A) states for metal parts meant to carry fault current. A drive daisy-chained onto the same PE run: give power and signal their own paths back to the bus — panel earth and shield earth on separate bars shows the star layout, and the enclosure grounding and bonding guide covers the conductor sizing behind it.
De-energize the feeder before re-terminating anything on PE; if you must measure live, treat every conductor in the box as energized.
The braid earthed at both ends
When the sensor sheath or its connector shell touches grounded machine metal, the braid may already be earthed at the far end. Your cabinet bond then closes a loop through building steel, and the current on that loop couples into the signal wires. Lift the cabinet end and put the meter in series on the mA AC range: more than a few milliamps on a shield meant to land once means the far end is grounded.
Keep exactly one bond. The module's wiring figure lands the shield on the cabinet's PE terminal, so shrink-wrap the braid pigtail at the sensor end and keep it clear of the connector shell. The article on which end of an RTD shield to bond covers the cases where the sensor end wins, and shield termination at the enclosure entry covers the clamps and glands that hold the bond.
Terminations that wander
A stepped reading that survives the reference and PE fixes is a contact opening and closing. Lift the sensor end and measure each of the three conductors: at 7 m expect about 0.59 Ω each, and treat more than 0.05 Ω of spread between them as imbalance your input will read as temperature. Torque the screws to the block maker's figure and replace oxidized lugs. Use blocks meant for small signals — the thermal-EMF check for PT100 terminal blocks measures the microvolts a mismatched pair adds. When the reading still moves as you touch the shield wire, the piece on an RTD reading that moves with its shield finds the bad bond.
The fix, in order
- Bond supply M to the cabinet PE bus, one point, labelled.
- Reconnect your shield at the cabinet PE terminal and compare raw inputs against the shield-lifted reading: within one count, 0.25 °C, the wiring is fixed.
- Still moving? Measure M to PE (want under 1 V AC), PE bus to ground bar (tenths of an ohm), and shield current at the bond (a few mA at most). The reading that is out names the cause.
- Torque and clean every termination in that channel; strip paint under the PE lugs.
- Set the message-text deadband to 0.5 °C — two counts — and keep the raw value reachable for commissioning.
Keep it from coming back
- One bond for supply M, one end per shield, both on labelled terminals; write it on the door card.
- Route PT100 cable out of the duct that carries drive output wiring: 12 in [300 mm] of separation is the usual field rule, crossing at right angles where you cannot keep it.
- Recheck the shield current after any drive retrofit nearby. A new loop appears the day someone earths the far end, and the control signal ground loop checks for a cabinet make a good yearly pass.
When the enclosure is the problem
Two enclosure faults reproduce this exact symptom. A plastic box gives the shield no bonded metal, so the drain lands on a terminal strip held by one screw. A stainless box gives you a mounting panel to bond: land the PE conductor on it, bolt the shield bar beside the signal terminals, and your shield reference sits centimetres from the input instead of metres.
With a drive sharing the cabinet, decide the layout on the drawing: signal glands one side, power glands the other, cutouts placed so the PT100 duct never meets the motor cable. The stainless size finder filters our wall-mount enclosures by grade and inside size, from 6 x 4 x 4 in to 60 x 36 x 16 in. They are rated NEMA 4X / IP66 by the manufacturer, not UL listed. For cutouts drawn to your gland plan, custom stainless enclosures are delivered in 10 business days, counted from your approval of the drawing.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 12" HMI enclosure | 304 stainless | 11.22 x 13.66 x 3.6 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
| 10.1" HMI enclosure | 304 stainless | 8.72 x 12.66 x 3.48 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
| 15.6" HMI enclosure | 304 stainless | 11.69 x 17.64 x 4.13 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
Questions
Do you connect the 24 VDC supply M terminal to PE?
Yes, once, at the cabinet: land M on the same PE bus as the module ground, with one labelled conductor. On a 10 MΩ meter a floating 24 V output commonly shows tens of volts AC to PE, leaking through the supply's filter capacitors; after the single bond that drops below 1 V. Add a second bond in another panel and you have rebuilt the loop, so one label, one lug.
Is a 7 m PT100 cable too long for the module?
No. The wiring guidance for this class of PT100 input draws the line at 10 m [30 ft], so 7 m sits inside it. At 7 m each 24 AWG conductor adds about 0.59 Ω, which a three-wire input cancels only while all three leads match; past 10 m, or beside drive output cable, length starts to matter on its own.
How do I stop the message text flickering by one count?
Set the display deadband to 0.5 °C, two counts of the module's 0.25 °C minimum resolution, and keep the raw input reachable for commissioning. A rolling average of four samples works too, but it adds about four scan times of lag and hides real steps. Deadband first: the number reads steady while genuine trends still move it.
Where does the shield land in a plastic enclosure?
On the PE terminal strip, tied to the incoming PE conductor, because a plastic box offers no bonded metal of its own. Keep that joint tight and corrosion-free; it is the whole shield reference. A stainless box gives you a bonding surface instead: earth the mounting panel with a conductor and bolt the shield bar beside the signal terminals, centimetres from the input.