Short answer: split the build in two and let only cables cross. The wet chamber holds the water, with a floor sloped 3 degrees, a 10-15 mm drain and its own breather. Beside it, the dry box holds every circuit that must stay dry, sealed and rated NEMA 4X / IP66 by the manufacturer - not UL listed. Cables cross through IP68 glands, one cable per gland, clamped on an uncut sheath. Give the return path five times the capacity of the rain feed and the display runs for years; share one volume and the connectors corrode in weeks.
One wet chamber, one dry box
Water sitting in a closed volume keeps the air above it at 100 % relative humidity. At 25 C that air carries about 23 g of water per cubic metre, and the mist disc adds a fog of droplets a few micrometres across that follows any draught. Every warm-to-cold cycle lays that moisture on the boards, and the corrosion starts at the connectors. Splitting the build deletes the physics: the wet chamber is allowed to be wet, and the dry box is allowed to stay sealed.
The wet chamber carries no enclosure type at all, because it has a hole in its floor on purpose. The dry box carries the whole rating, and any assembly holds the rating of its lowest part. IEC 60529 earns the second digit 5 with a 6.3 mm nozzle at 12.5 L/min and the digit 6 with a 12.5 mm nozzle at 100 L/min; one careless opening in the dry box gives that up. So every hole in the dry box is a gland or a rated plug, and nothing else.
Make the wet chamber 316L and the dry box 304 for an indoor build. Tap water carries roughly 100-300 mg of dissolved solids per litre, and mist leaves as pure water, so every top-up concentrates chlorides in what stays behind. The wet-dry zone just above the waterline is where stainless pits first, which is exactly the failure mode behind why wet-dry cycling rusts 316L; top up with distilled water and it slows to a crawl. UL 50E's Type 4X test adds 200 hours of salt spray against a 304 specimen, and your wet chamber lives in that world daily, so spend the molybdenum grade where the water is. Outdoors, sun becomes the largest heat load and salt air adds chlorides - start that version from the outdoor enclosures page.
What goes in each chamber
| Part | Spec in this example | Chamber |
|---|---|---|
| Display chamber | 316L, custom 300 x 250 mm floor, 200 mm tall, 3 degree slope | Wet |
| Standing water | 30 mm deep over the disc, 2.3 L | Wet |
| Drain and return | 12 mm drain, 30 mm standpipe, gravity to a 5 L sump 200 mm below | Wet |
| Mist disc | 24 V DC, 12 W, at the depth its instructions call for (commonly 30-50 mm) | Wet |
| Rain feed pump | 300 mL/min, 6 W, in the sump | Wet |
| Float switch | Reed contact rated 0.5 A, sump low level | Wet |
| Dry box | 304 stainless, custom 12 x 10 x 6 in [305 x 255 x 150 mm], Type 4X / IP66 | Dry |
| Crossings | 3 x IP68 glands plus 2 rated plugs | Dry box wall |
| Control | 24 V supply, controller, relays, desiccant | Dry |
Step by step
- Set the sump 200 mm below the drain and give it 5 L. The chamber holds 2.3 L standing, a 5-minute storm at 300 mL/min adds 1.5 L, and the standpipe returns everything by gravity. With gravity doing the return, no pump ever has to match another pump.
- Slope the wet floor 3 degrees to the drain. That is about 16 mm of fall across a 300 mm floor, so the last film leaves on its own and a rinse takes one jug. In a US installation, field-drilled weep holes in a listed wet-location box top out at 3-6 mm under NEC 314.15; your wet chamber is a display tank rather than that box, which is why its drain is 12 mm and it carries no type.
- Put the breather at the top of the wet chamber. Mist forms and water drains, so the air volume above the waterline needs a pressure path, or it will push vapour past your gland seals instead. The trade-offs are laid out in breather vent vs drain for a sealed enclosure; here the wet chamber takes both fittings.
- Order both boxes with every hole already cut. Lay the gland holes, two spares, the drain, the breather port and the window in the cutout designer and have them cut when the boxes are made. Custom enclosures are delivered in 10 business days, counted from your approval of the drawing. Cutting holes into a box that already carries a rating is a different job - if that is your path, read whether an ex-proof junction box can be drilled for glands first - but on a custom order the rating starts intact.
- Mount the dry box where you can reach both sides of every gland. Keep the gland face out of the splash path, and bring the wet-side cables out 80 mm above the chamber floor, well above the 30 mm waterline. Only humid air, never liquid, travels that gap; the gland is what seals the dry box against the accidental splash and the wash cloth.
- Wire one cable per gland. Seat each seal on the uncut sheath, form a 50 mm drip loop below every gland on the wet side, and land the conductors on terminals inside the dry box. Water also climbs stranded conductors by capillary action; spend two minutes on stopping water wicking through cable before you strip anything.
- Keep mains power out of the water. Run the disc, the pumps and the lights at 24 V DC, with the supply and any switching inside the dry box, and feed the mains side through a 30 mA RCD (a North American Class A GFCI trips at 4-6 mA). Before you open either chamber on a mains-fed build, lock the feeder off and verify absence of voltage.
- Commission the dry side dry. Load the desiccant and close the box on a dry day, following desiccant sizing and dry assembly. The condensation battle is won or lost at this step, before the first fill.
Glands at the crossing
Buy glands whose datasheet rates them IP68 for the clamped cable. IP67, tested at 1 m for 30 min, already covers a splash or a standing film here, because 50 mm of water is only 490 Pa, about 0.005 bar; the first digit's dust-tight claim matters less than the second digit's water column. Cut the hole the datasheet names - about 20.5 mm for an M20 gland, 22.5 mm for a 1/2 in NPT - and set the torque it names. The clamping range must bracket the cable: a 7.5 mm OD pump cable belongs in a gland sealing 5-10 mm, with the insert untouched.
An immersion-rated gland still sets the assembly's water performance at that point, so the dry box keeps its 100 L/min jet rating only where cable, hole and torque follow the gland maker's sheet. Plug the spare holes with plugs rated to the same number, and fit the locknut and seal the maker lists. Two cables through one cable gland can be made to work in dry settings, but with water on one side the seal seats on neither sheath, so give the disc and the pump their own holes. The float's reed contact carries 0.5 A at best, while the feed pump pulls 0.25 A running and several times that at start, so the float drives a relay and the relay carries the pump. Hole sizes and spacing rules are collected in the cutouts, glands and windows guide.
Heat, mist and the cold night
Work the dry side as a sealed box. The 24 V rail carries 22 W: 12 W disc, 6 W pump, 4 W lights. A supply at 85 % efficiency turns 22 x (1/0.85 - 1) = 3.9 W of that into heat inside the box; the controller adds 3 W, the disc driver 2 W and standby 1 W, so call it 10 W. For a 12 x 10 x 6 in box the wall area is 2 x (120 + 72 + 60) = 504 sq in = 0.325 m2, and stainless walls pass about 3.7 W per square metre per kelvin. Rise = 10 W / (3.7 x 0.325) = 8 K, so in a 22 C room the dry interior sits near 30 C while powered, with every wall warmer than anything that could condense on it. Double the watts and you double the rise; the full method, hot side and cold side, is in the sealed enclosure heat load calculation.
On the wet side, the 12 W disc warms 2.3 L of water about 4.5 K per hour with no circulation: 12 W / (2.3 kg x 4.186 kJ/kg K) = 0.00125 K per second. The return loop is also the cooling loop, so keep it moving; the sump settles 1-2 K above the room and the glass stays clear. Now the failure case: power off on Friday, room down to 17 C overnight. Condensation needs an interior dew point above the wall temperature, and a dry-assembled box with fresh desiccant holds its dew point in single digits, so 17 C walls stay clear. A humid first assembly is the mistake no heater quietly fixes later.
Prove it before you trust it
- Run the longest storm three times back to back - 5 min at 300 mL/min - and watch the chamber level hold steady at the standpipe.
- Tape paper towel under every gland and along the dry-box floor for 24 h of operation; a damp edge marks that gland for a re-seat.
- Log a max/min thermometer inside the dry box: in this build it should read about 30 C against a 22 C room. Above 40 C you have passed the ambient most electronics are rated for, so cut the load or grow the box.
- After the first weekend powered down, open the dry box on a dry day and look at the coldest corner. A dull film means the assembly was humid; entry points show it first, the same pattern as condensation in an IP67 project box.
- Wipe the window after a month: a white film means your top-ups are leaving minerals behind, so switch to distilled.
Where these builds fail
- A breather or weep hole on the dry box: the assembly now runs at that opening's number, far under the 100 L/min jet level of IP66. The wet chamber takes both fittings.
- Two cables in one gland: the seal seats on neither sheath, and water finds the looser one.
- A stripped-back sheath under the gland: the clamp grips conductors instead of jacket, and capillary film follows them in.
- Mains at the water: 24 V DC keeps the shock path out of the display; any mains-fed variant keeps its supply and contactor in the dry box, behind the RCD.
- Pump-rate matching by software: with the sump below the chamber there is nothing to match, and with a pumped return a float plus 5x capacity beats any timer.
- Sealed while humid: the desiccant does its work at commissioning or never gets the chance.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 12 × 10 × 6 in | 304 stainless | 12 x 10 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 10.1" HMI enclosure | 304 stainless | 8.72 x 12.66 x 3.48 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
| 15.6" HMI enclosure | 304 stainless | 11.69 x 17.64 x 4.13 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
| 21.5" HMI enclosure | 304 stainless | 14.69 x 23.03 x 3.86 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
Questions
Can the electronics live in the same sealed box as the water?
Only for a demo. Standing water holds the air at 100 % relative humidity, and air at 25 C carries about 23 g of water per cubic metre; every warm-to-cold cycle lays that moisture on the boards until connectors corrode, usually within weeks. Two chambers with glands between them is the design that survives.
What gland rating do I need between the wet and dry chambers?
Buy IP68 glands and you are covered with margin. IEC 60529's second digit 7 means 1 m of water for 30 min, while the standing head on a gland here is about 50 mm, or 490 Pa (0.005 bar). The gland keeps the dry box's IP66 only when the cable OD sits inside the gland's clamping range, the hole matches the datasheet diameter and the seal is torqued on an uncut sheath.
How do I keep the return pump matched to the rain feed pump?
Stop matching and over-power. With the sump below the chamber, gravity through a standpipe returns everything and no return pump exists. If the layout forces one, give it five times the feed rate, 1,500 mL/min against a 300 mL/min feed, switched by a high float with 300 mL of hysteresis so each pump-out lasts 12 s, plus a 30 s anti-cycle timer.
Does the dry box need a breather or drain of its own?
Keep the dry box fully sealed: the assembly runs at the rating of its lowest part, and one opening drops it below the 100 L/min jet level of IP66. The wet chamber takes the 10-15 mm drain and the breather, because that is where mist forms and water leaves. On the dry side, fresh desiccant at assembly holds the interior dew point in single digits.