Short answer: put the disconnect in the wall. Mount the mating halves of MC4-style solar connectors as bulkhead feedthroughs in the enclosure's bottom wall: one 16 mm [0.63 in] hole per conductor. The plug and unplug then happen outside the box, and the wall behind them stays sealed. For two 22 V, 10 A panels in parallel, that is two feedthroughs carrying a combined 20 A, sized around a 25 A design current. Add a drip loop under each plug and caps for the days the panels come off. A connector on the cable will never pass a cable gland; the plug body dwarfs the jacket the gland seals on, and why connectors jam at a gland walks through it. A bare cable through a bead of sealant is the other dead end. The steps below take you from hole layout to the first wet-weather check.
What you need
Start with a hinged, gasketed wall-mount box with a removable panel; the wall-mount range starts at 6 x 4 x 4 in. The 10 x 8 x 6 in 304 stainless model has a 10 x 8 x 6 in outside footprint, with a nominal 9.91 x 7.91 x 5.91 in inside, enough for two bulkhead tails, a terminal strip and slack. Take the 316L twin where your wall meets salt spray or road salt. Both are manufacturer-rated NEMA 4X / IP66; not UL listed.
The rest of the kit:
- Two MC4-style bulkhead connector pairs: mounting hole per the maker's drilling template, 10-14 AWG solar cable range, sealing caps in the box, one connector family throughout.
- 10 AWG PV wire and the crimp tool that contact family calls for.
- A sealed sleeve for the building-wall penetration behind the box, chosen for the measured jacket — about 7 mm [0.28 in] OD on 10 AWG PV wire.
- A DC-rated disconnect, a 30 A breaker or switch.
- UV-stabilized cable ties.
The box arrives rated as supplied; each feedthrough then adds its own seal, and the connector datasheet sets what that seal is worth. Buy pairs whose sheet states an ingress figure for the mated connection — IP66 or better if the wall can ever meet a hose — and fit them at the stated hole size with the O-ring seated on a smooth face. The lowest figure in the chain is the one the wall delivers, and waterproof panel-mount connectors on a sealed enclosure gives the general rules. What the NEMA 4X and IP66 tests actually throw at a box is in the NEMA 4X vs IP66 guide. In US installations, NEC 110.28 keeps the enclosure type rating as the figure the code works from, so the Type 4X marking is the one that governs even with an IP code alongside.
The wiring plan and the worked example
Parallel wiring keeps the voltage and adds the currents: 22 V across the array, 20 A through the feedthrough pair, 440 W at rated output. PV wiring is sized at 125% of rated current, so the design current is 20 A x 1.25 = 25 A. Join the two panels outside on MC4 branch connectors and bring one cable pair to the wall. Four feedthroughs, one per panel per polarity, earn their holes only when each panel must disconnect alone at the wall; for panels that travel a few times a year, the outside branch is the lighter build. The feedthrough is the same idea as the bulkhead entry for outdoor cables you unplug regularly: the break happens at a sealed fitting, not at a gland struggling over hardware it was never sized for.
| Figure | Value | Basis |
|---|---|---|
| Array voltage | 22 V | parallel wiring, voltage unchanged |
| Array current | 20 A | 10 A + 10 A per panel |
| Array power | 440 W | 22 V x 20 A |
| Design current | 25 A | 20 A x 1.25, the PV sizing rule |
| Feedthroughs | 2 bulkhead pairs | one per polarity, panels joined outside |
| Hole per pair | per the maker's template | stated on the connector datasheet |
| Cable | 10 AWG PV wire | largest size the pair accepts, covers 25 A |
| Disconnect | 30 A DC-rated | above the 25 A design current, inside what 10 AWG carries |
| Voltage drop | 0.6 V = 2.7% | 30 ft round trip of 10 AWG at 20 A |
Check the drop against your own run before you buy the reel. 10 AWG copper is about 1.0 Ω per 1000 ft [3.3 mΩ per m], so a controller 15 ft [4.6 m] from the box makes a 30 ft [9.1 m] round trip of 0.03 Ω. At 20 A that is 0.6 V, or 2.7% of 22 V — inside the 3% loss PV designers usually target. Double the run and the loss doubles; past about 3%, step up to 8 AWG.
Cut, mount and wire, step by step
- Lay the two holes out on the bottom wall, centered left to right, 40 mm [1.6 in] apart, on flat material away from the corner welds. Send your layout through the cutout designer and have the holes factory-cut — delivered in 10 business days, counted from your approval of the drawing for custom work — or drill the template hole with a hole saw and deburr both faces.
- Mount each bulkhead from the outside with its O-ring seated on a smooth, clean face, and tighten the lock nut inside to the maker's figure. Leave the receptacles pointing down. Two small feedthrough holes sit far below what a stainless wall of this size carries; the penetration-count guide explains the spacing that matters on busier walls.
- Crimp MC4 contacts onto the panel leads with the tool that contact family calls for. Socket and plug gender keep positive on positive and negative on negative, so a swapped pair cannot hide.
- Land the feedthrough tails on a terminal strip with 4 in [100 mm] of slack at each, and bond the enclosure to the equipment grounding conductor at the same strip; the grounding and bonding guide covers what has to be bonded and how.
- Pass the indoor pair out through a sealed sleeve in the building wall behind the box. Covering a cable-entry hole with a weatherproof box walks through that penetration, sealant and all.
- Fit the 30 A DC disconnect on the indoor run, where you can reach it before the charge controller or inverter.
- Outside, form each cable into a drip loop hanging 2-3 in [50-75 mm] below its plug and tie it with UV-rated ties. Make the final joins panel to branch to plug.
Checks when done
- Voltage and polarity: with the disconnect open, the indoor terminals read close to the 22 V operating figure, positive on positive; the label's open-circuit value sits a step higher than 22 V.
- The seal: after the first good rain, or a hose spray from arm's length with the plugs mated, open the door and look for droplets at the bulkhead nuts. A dry floor passes.
- Heat: on a sunny afternoon, hold each mated pair. A connector too hot to keep hold of means a bad crimp; re-terminate it before the contact cooks.
- Hardware: after the first week of sun, re-check the lock nuts and the drip loops. The first thermal cycles find a loose nut better than any torque sheet.
Mistakes that cost the rating
- A hole drilled oversize or left burred. The template size is the O-ring's seat; ream to size, deburr, and keep the mounting face flat.
- Receptacles facing up and uncapped. Rain pools on an unmated face, so point them down and cap them whenever you take the panels down.
- Mixed connector families. Contacts from different generations mate loose and run hot; stay in one family across plugs, branches and bulkheads.
- No drip loop. The jacket wicks water straight into the connection; the 2-3 in [50-75 mm] hang lets it drip off first.
- Forcing the connector through a gland anyway. The plug body crushes the sealing insert, and the entry leaks from the first hose.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 10 × 8 × 6 in | 304 stainless | 10 x 8 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 10 × 8 × 6 in | 316L stainless | 10 x 8 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 6 × 4 × 4 in | 304 stainless | 6 x 4 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 12 × 10 × 6 in | 304 stainless | 12 x 10 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Can a connector on the cable pass through a cable gland?
A gland seals on the cable jacket — about 7 mm [0.28 in] on 10 AWG PV wire — and an MC4-style plug body is several times that diameter, so it never pulls through and never seals. Put the connector in the wall instead: a bulkhead receptacle mounts in its maker's template hole with its own O-ring, and the mated plug stays outside where you can reach it.
Will a few disconnects a year wear the solar connectors out?
Mating wear is a datasheet figure, and a typical solar connector pair rates 100 or more mating cycles, so four unplug cycles a year barely dents it. The wear points are grit on the contacts and a cracked or missing cap; keep the caps on between uses and give the O-rings a look each spring.
Is the enclosure still sealed when the panels are unplugged?
The wall is. Each feedthrough's O-ring seals its hole with the plug on or off. The unmated connector face is the weaker point, because solar pairs state their ingress rating mated, so cap every receptacle left open more than a day and keep them facing downward so nothing pools on the seal.
Why open the disconnect before unplugging?
A DC arc does not self-extinguish the way an AC arc does — the current never passes through zero — so pulling a connector under the full 20 A draws a sustained arc that pits the contacts. Open the 30 A DC disconnect first; with no current flowing, the pair separates clean and the 22 V resting on the contacts is harmless to handle.