Yes, bond every one of them. IEC 60079-14 ties all exposed conductive parts in a hazardous area into one equipotential bonding system, and your insulating sleeves take the mounting hardware out of that path. Land the supply cable's protective earth on the luminaire's internal earth point. Then run a separate bonding conductor from the external earth point of each luminaire to the structure's bonding grid. The manual's two points per end exist for exactly this split. Your concern about the chain is the right one: with the earth conductor looping fixture to fixture, one loose terminal strands every luminaire downstream. Six luminaires on a string lose earth five at a time from one 5 mm² lug.
What the standard calls for
IEC 60079-14 asks for every exposed conductive part, and any other conductive part that could become live, to be connected to the installation's equipotential bonding system. It also expects the connections arranged so that removing any single connection leaves equipotential intact. That sentence ends a daisy chain built on one earth conductor. The bonding system may include protective conductors, metal conduit, cable sheaths and steel-wire armouring as well as dedicated bond wire, so you have several honest ways to build it.
The physics behind it is plain. Potential difference between two parts is what drives a spark across a gap, and in Zone 1 or Zone 2 a spark from a luminaire body to its bracket is an ignition source. A bond that reads single-digit milliohms keeps every body at structure potential, and the fault path back to the breaker rides in the supply cable. The fundamentals are in the enclosure grounding and bonding guide; this page is the Ex case.
Why the sleeve makes the bond a wire
You mount these luminaires on insulating sleeves to break the galvanic couple between the stainless body and the steel structure, and the sleeve does its job completely. No bolt, bracket or mounting foot carries earth. The body reaches the bonding system only through a conductor you land yourself. That is the same logic as why DIN rail is never a grounding conductor for a supply. It is also why enclosure doors and covers get their own bond instead of trusting hinge pins.
The luminaire manual states it in one line: “Installer should earth the unit separately – an internal and external earth point are provided as standard at each end of the luminaire.” One point serves the cable's protective earth. The other serves the structure bond. Using both is what keeps those two jobs separate.
What to land at each end
Two points, two jobs, one luminaire:
| Point on the luminaire | What lands there | What it does |
|---|---|---|
| Internal earth point | The supply cable's protective earth, in and out where the chain continues | Carries fault current back so the breaker opens |
| External earth point | One dedicated bonding conductor per luminaire | Holds the body at the structure's potential |
Size that bonding conductor like a protective conductor for the largest circuit it serves, on the IEC 60364-5-54 scale:
| Phase conductor | Protective or bonding conductor |
|---|---|
| Up to 16 mm² | Same size as the phase |
| Over 16 up to 35 mm² | 16 mm² |
| Over 35 mm² | Half the phase size |
A 2.5 mm² lighting final circuit sets your minimum at 2.5 mm². A 25 mm² feeder steps the bond down to 16 mm² under the middle row. The worked example below uses 16 mm² copper, the size offshore runs step up to for mechanical life. Fit ring lugs on the marked studs and strip the coating under them first: NEC 250.12 requires paint, lacquer and enamel removed from threads and contact surfaces at grounding and bonding connections. For how the conductor gets into a box and which fitting carries the bond, read the earth conductor's entry and bond at the enclosure.
Bond each luminaire, step by step
- Isolate the lighting circuit under the site's electrical permit and prove it dead at the first luminaire you open. This is dead work, and the Ex zone deserves the paperwork.
- At the internal earth point, land the incoming protective earth, and beside it the outgoing one where the chain continues: two lugs, one stud, both torqued.
- At the external earth point, land one bonding conductor running to the structure's bonding grid or the nearest bonding rail. Give each luminaire its own conductor, and keep that point a dead end rather than a pass-through.
- Rebuild the mounting with the insulating sleeves and washers in place, so the corrosion isolation survives the earth job.
- Repeat at every luminaire in the string, including the last of six, and label each bond at the structure end with the tag the drawings use.
- Torque each lug to the value printed in the luminaire manual with a calibrated wrench, and note the figures on the record sheet.
Checks that prove the bond
Measure the path; a working lamp proves nothing. A luminaire lights with its earth fully open, because the protective conductor only carries current under fault. Use a bonding tester that drives at least 0.2 A — the IEC 61557-4 class of instrument — and log each fixture separately.
Run the arithmetic for your own cable before you judge the reading. Copper sits at 0.0178 Ω·mm² per metre at 20 °C, so a 5 m [16 ft] one-way run of 16 mm² copper is 0.0178 × 5 ÷ 16 = 0.0056 Ω, about 5.6 mΩ of metal. A 10 m [33 ft] run doubles that to 11.2 mΩ, still far inside the limit. Copper resistance rises about 0.39 % per K, so at 35 °C the 5 m run is nearer 5.9 mΩ — a rounding error next to the joint resistance. Add a few milliohms per lug and the whole path should still read under 50 mΩ. At roughly nine times the calculated copper you are measuring a loose or painted joint, so chase it before signing that fixture off.
Read every fixture, including the last. A good reading at luminaire 1 says nothing about luminaire 6, and the per-fixture bond is what gives a fault at the far end a milliohm path home. File the readings with the Ex dossier: IEC 60079-17 governs inspection and maintenance of Ex installations, and bonding connections come round again at inspection.
Mistakes that cost the bond
Four habits strand a fixture or a whole string:
- Counting on the mounting: with the sleeve in place, bolts and brackets are insulators, so the external bond is the only structure path the body has.
- Threading one bond through the chain: a conductor passed through every fixture's external point puts the whole string behind each terminal, which is the failure you set out to remove.
- Leaving paint or sealant under the lug: the joint reads tens of ohms and hides it until the 0.2 A tester finds it.
- Trusting the lamp test: light proves the phase and neutral circuit, and an open earth shines just as brightly.
What we build, and the decision
Inside Zone 1 and Zone 2, every enclosure and box needs certification under the ATEX or IECEx scheme, and we do not build those. On the safe side of the boundary, your splices, terminal blocks and feeds live in ordinary boxes, and offshore that means 316L stainless. Near salt, 316L holds where 304 pits under chloride deposits even at room temperature, and about 60 °C is the chloride stress-corrosion threshold for both grades anyway. Our stainless junction boxes and outdoor stainless enclosures come rated NEMA 4X / IP66 by the manufacturer; not UL listed. You set the material, the width, height and depth and every cutout, and delivery is 10 business days anywhere in the world, counted from your order or, for custom work, from your approval of the drawing.
The decision by case:
- Sleeve-mounted Ex luminaire: cable earth on the internal point, one separate bond from the external point, at every fixture.
- Chained luminaires: the same, so one loose internal earth strands one luminaire instead of the rest of the string.
- Armoured supply cable: land the armour in bonding glands at both ends and it carries its share; keep the external 16 mm² bond wire for the sleeve.
For bonding across the wider steelwork, read offshore metallic structure equipotential bonding under IEC 60079-14.
Questions
Does the separate bond replace the protective earth in the supply cable?
Run both, because they do two jobs. The cable earth, on the internal point, carries fault current back so the breaker opens. The external bond holds the body at structure potential. On a chain of six luminaires there is a bonus: with every fixture separately bonded, one loose internal earth strands only that one luminaire, and it still reaches the bonding grid through its own 16 mm² bond.
Can the steel wire armour of the supply cable count as the bond?
Partly. IEC 60079-14 counts protective conductors, metal conduit, cable sheaths and steel-wire armouring as parts of the bonding system, so armour landed in bonding glands at both ends does carry its share. Keep the separate external bond as well. The armour belongs to the cable side, and the sleeve still isolates the luminaire body from the structure.
What resistance should a finished bond read?
A 5 m [16 ft] run of 16 mm² copper is 5.6 mΩ of metal at 20 °C, so with sound lugs the whole path reads well under 50 mΩ. A 10 m run of the same wire doubles to 11.2 mΩ and still passes. Log each luminaire separately with a 0.2 A bonding tester. A reading near ten times the calculated copper points at a loose or painted joint.
Do you sell Ex-certified enclosures for inside the zone?
No. Hazardous-area enclosures need certification under the ATEX or IECEx scheme, and we do not build them. On the safe side of the boundary, our 316L stainless junction boxes carry a manufacturer rating of NEMA 4X / IP66 — not UL listed — and are delivered in 10 business days, counted from your order or from approval of the drawing for custom work.