Bond the two rings. When a pad-mounted transformer's ground ring and the building's ground ring lie within about 6 ft [1.8 m] of each other, run a direct bare-copper bond between them, with 1/0 copper as the working size. The service neutral already ties the two electrode systems together through a few milliohms of copper, so the new link carries only the share its own resistance attracts. The worked example below shows the payoff: a bolted ground fault lifts the ring-to-ring difference to about 65 V unbonded, and the bond holds it near 25 V, under the 50 V touch limit IEC 60364 uses. At load the bond takes about 12 A of a 20 A neutral unbalance and barely warms. The job is one trench, irreversible connections and a phone call to the utility. The grounding and bonding guide covers the fundamentals behind every number here.
Why the rings are already one system
The two rings look separate on the drawings and are not separate in the ground. The utility bonds the transformer's secondary neutral to its ground ring at the pad. The service neutral bonds to the ground bus at the switchboard, and the building ring lands on that same bus. One continuous copper conductor, the feeder neutral, joins the two electrodes through a resistance of a few milliohms. NEC 250.4(A)(5) states the principle for faults: the effective ground-fault current path is the metal, and the earth is not considered part of it.
The building-side rule points the same direction. The NEC's grounding-electrode-system rule requires every electrode at the building — ring, rods, water pipe — to be bonded into one system. The pad sits on the utility's side of the boundary, where the NESC and the utility's multi-grounded primary neutral govern, so the NEC does not order this particular bond. Bond it anyway. The copper logic is identical, the cost is a short trench, and the reward is a smaller fault-time voltage difference between two areas people walk across.
The common objection, that the bond runs in parallel with the neutral, describes what already exists. Current division between parallel copper paths is ordinary physics, the same arithmetic that governs parallel neutral paths between panels. A direct bond changes the split; it does not change the principle. Treat the neutral as the working link it is: it carries unbalance every day, and what a lost service neutral does to the return path shows what hangs on it. For a customer-side cabinet at the pad itself, the same siting and bonding logic appears in a pad-mounted electrical enclosure for an off-grid solar system.
The numbers: 65 V or 25 V
The example runs on stated assumptions, so replace them with your own service numbers before selecting conductors: a 1,000 kVA oil-filled pad-mount, 480Y/277 V secondary, 5.75% impedance (the standard value IEEE C57 lists for liquid-filled transformers of this size), a 40 ft [12 m] feeder of 4/0 copper, a 20 ft [6 m] bond of 1/0 bare copper, 20 A of neutral unbalance, and 5 Ω between the rings through average soil. Copper resistance at 75 °C runs about 0.077 Ω per 1,000 ft for 4/0 and 0.098 Ω per 1,000 ft for 1/0.
- Full-load secondary current: 1,000,000 VA ÷ (1.732 × 480 V) = 1,203 A.
- Bolted ground fault on the solidly grounded wye: 1,203 A ÷ 0.0575 ≈ 21,000 A.
- Neutral resistance: 0.077 Ω/1,000 ft × 40 ft = 3.1 mΩ. Bond resistance: 0.098 Ω/1,000 ft × 20 ft = 2.0 mΩ.
- Unbonded: 21,000 A × 3.1 mΩ = 65 V between the rings. The same 65 V across 5 Ω of soil drives only about 13 A through the earth.
- Bonded: the parallel resistance is (3.1 × 2.0) ÷ (3.1 + 2.0) = 1.2 mΩ, so the difference falls to 21,000 A × 1.2 mΩ = 25 V. The bond carries 21,000 × 3.1 ÷ 5.1 ≈ 13 kA, the neutral keeps about 8 kA, and the two add back to 21 kA.
- At load: 20 A × 3.1 ÷ 5.1 ≈ 12 A in the bond, 12² × 2.0 mΩ = 0.29 W of heat, and a ring-to-ring difference of 62 mV unbonded or 24 mV bonded.
| Quantity | Rings unbonded | Rings bonded |
|---|---|---|
| Ring-to-ring voltage during the fault | about 65 V | about 25 V |
| Fault return in the feeder neutral | about 21 kA | about 8 kA |
| Fault return in the new bond | 0 A | about 13 kA |
| Continuous bond current at 20 A unbalance | 0 A | about 12 A |
The 50 V touch limit is the decision line, and the bond moves the design under it. Both figures last only for the cycles a bolted fault takes to clear; arcing faults carry less current and produce less difference. What moves the numbers:
- Transformer size and impedance. A 2,500 kVA unit at 5.5% reaches about 55,000 A and lifts the unbonded difference to about 170 V. Two parallel 1/0 bonds, about 1.0 mΩ over the same 20 ft, bring it back near 41 V.
- Feeder length. At 120 ft [37 m] the neutral is 9.2 mΩ and the unbonded difference about 194 V; the same 20 ft bond still holds it near 35 V.
- Load unbalance. Sixty amperes of unbalance puts about 37 A in the bond, well under the 150 A of continuous capacity the NEC's copper ampacity table gives 1/0 at 75 °C.
- Soil. A 5 Ω earth path takes about 5 mA at load and about 5 A even at the fault. Copper does the work.
Coordinate with the utility first
The pad, its ring and the transformer's neutral bond belong to the utility, under the NESC. Call before the trench: describe the route, the endpoints and the conductor, and leave every connection inside the pad to their crews. If stray current on your service neutral climbs after the bond goes in, the utility can rearrange its own ring-to-neutral bond to fix it. That adjustment is theirs to make. Opening the transformer's neutral bond yourself strips the ground their crews rely on and pushes the hazard onto the whole property.
One safety note: verify absence of voltage on your own switchboard before opening it, and let the utility isolate its pad.
Run the bond in eight steps
- Pull the project one-line diagram and mark every grounding point: the transformer neutral bond, the service neutral bond, the building ring, the rods and the water pipe. Walk the drawing against the field and reconcile any conductor that lands somewhere else.
- Baseline the currents with a clamp meter under normal load: the service neutral and any visible bonding jumpers. Write the amps down; the worked example starts from 20 A of unbalance.
- Call the utility and agree the route and the endpoints. Their pad stays untouched.
- Route the bond along the shortest clean path, about 20 ft [6 m] in the example. Use bare 1/0 copper or larger, buried at the NEC's 24 in [600 mm] direct-burial cover depth.
- Make every below-grade joint irreversible: exothermic weld or irreversible compression. Connector and termination choices at the box are covered in the grounding conductor entry article.
- Land the building end on the service ground bus or a dedicated lug, and remove paint, lacquer and enamel from the contact surfaces, as NEC 250.12 requires at grounding and bonding connections. Bonding a grounding electrode conductor to the service enclosure shows the landing itself. If the bond rises into a metering or test cabinet at the yard boundary, stainless wall-mount junction boxes — rated NEMA 4X / IP66 by the manufacturer; not UL listed — take a copper ground bar and glanded entries.
- Keep every ground-fault CT window empty except the feeder's own phase and neutral conductors. Residual protection reads imbalance through that window, and a bond wrapped through it corrupts the reading at load and at fault.
- Backfill, mark the route where it rises, and record the bond's size, route and endpoints on the as-built.
Checks when the trench is closed
- Re-clamp the bond under the same load: expect its share, about 12 A in the example, with the neutral reading down by the same amount. Both sit far below any ground-fault pickup, which the NEC caps at 1,200 A for services of 1,000 A or more at 480Y/277.
- Measure between the two ring risers with a four-wire low-resistance ohmmeter. The example network reads about 1.2 mΩ, the bond and the neutral in parallel.
- Confirm the protection logic: during a real ground fault the bond's share bypasses the window CT, so the CT sees about 8 kA of the neutral's return instead of the full 21 kA. Both are far above pickup, so the device trips exactly as before.
- Photograph the endpoints and file the numbers with the as-built.
Five mistakes that undo the bond
- Sizing for the load share alone. The bond is also a fault path, and its 13 kA share lasts only cycles: size it as a grounding electrode conductor, for which the NEC's table starts at 8 AWG copper, and let a 1,000 kVA service take the 1/0 from the example.
- Wrapping the bond through a ground-fault CT window. Step 7 exists because this single mistake turns a tidy bond into mystery trips.
- Opening the utility's transformer neutral bond to stop circulating current. It removes the utility's ground and spreads the hazard across the property; mitigation on their side is the working fix.
- Landing the bond on an isolated neutral terminal or a downstream subpanel neutral. Neutrals land on the neutral terminal and grounds on the ground bus — the separation NEC 250.6 protects — and a ground-ring bond is a grounding conductor, so it lands with the grounds. The same boundary governs when you remove a neutral ground bond in an outdoor subpanel.
- Treating the bond as an equipotential guarantee. It cut the example's fault-time difference from about 65 V to about 25 V on stated assumptions; a longer feeder or a bigger transformer lifts both numbers, so rerun the two calculations before you backfill.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 60 × 36 × 16 in | 304 stainless | 60 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 48 × 36 × 16 in | 304 stainless | 48 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 60 × 36 × 12 in | 304 stainless | 60 x 36 x 12 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Does the ring-to-ring bond put neutral current through the earth?
Barely any. At load the two rings differ by about 24 mV with the bond in place, so a 5 Ω soil path carries roughly 5 mA. Even at the example's 21,000 A bolted fault, 25 V across the same soil moves only about 5 A; the 1/0 bond takes about 13 kA and the neutral about 8 kA. That is the point behind NEC 250.4(A)(5): the earth is not considered part of the effective ground-fault current path.
Will bonding the rings trip the service's ground-fault protection?
Not at load and not any differently during a fault. The bond carries about 12 A of the example's 20 A unbalance, far under a pickup the NEC caps at 1,200 A for services of 1,000 A or more at 480Y/277. During a ground fault the bond's share bypasses the window CT, so the CT reads about 8 kA instead of the full 21 kA — still above pickup, so the device trips exactly as it did before.
What size conductor bonds the two ground rings?
Size it as a grounding electrode conductor from the NEC's GEC table, which starts at 8 AWG copper. The worked example uses 1/0 bare copper over 20 ft [6 m]: 150 A of continuous capacity at 75 °C from the NEC's copper ampacity table, and headroom for its 13 kA fault share. A 2,500 kVA pad pushing about 55 kA takes two parallel 1/0 bonds to hold the fault-time difference near 41 V.
Do the rings still need bonding when they are 30 ft apart?
The bond turns from standard practice into an option. Past about 6 ft [1.8 m] a person rarely bridges both rings, so the touch-voltage argument fades, and the service neutral still ties the electrodes into one system. Run the bond when the trench is already open or when people cross between the rings; skip it when neither applies, and let the neutral do the job.