Ground an unused CT secondary in your control panel

Yes. Short S1 to S2 at the CT terminals, then land one earth link from that shorted point to the panel earth bar — one earth per secondary circuit, never one at each end. A floating 5 A secondary can sit at 231 V from capacitive coupling alone.

NEMA4 Enclosure engineering team · Published November 13, 2026 · 6 min read

Yes, ground it — short the unused secondary first, then earth that shorted point, one earth link per secondary circuit. The two actions answer two different hazards. The short removes the open-circuit voltage, whose peaks run into kilovolts while the primary carries current; the single earth stops the winding drifting toward primary potential through capacitance, which on a 480 V bus leaves about 231 V on a floating 5 A winding in the worst case worked out below. Put the short and the earth at the same CT terminal block, label the link, and count as you go: three CT pairs into a governor means three earth links — not one, and not one at each end.

Why the short and the earth are two different jobs

A current transformer pushes its secondary current through whatever you connect across it. Leave the circuit open with the primary energized and the terminal voltage climbs until the core saturates; on a large feeder the peaks reach the kilovolt range, enough to arc across a terminal block and puncture the winding insulation. That is why every unused core gets a permanent S1-to-S2 short.

The short only answers that one hazard. A shorted winding with no earth reference still floats, because the insulation between primary and secondary is a small capacitor, and so is the wiring to earth. The two form a divider:

Put numbers on it. A metering CT on a 480 V bus sits at 277 V phase-to-earth; take 300 pF between windings. With 40 m [130 ft] of shielded pair landed in your panel, the circuit adds roughly 900 pF to earth, so the winding floats at 277 × 300 / 1200 = 69 V. Lift that cable and leave 60 pF of stray capacitance, and the same sum gives 277 × 300 / 360 = 231 V on a circuit everyone calls "only 5 A". Both figures sit above the 50 V AC touch limit IEC 60364 uses for accessible parts.

The earth link also decides what an insulation failure does. If primary-to-secondary insulation breaks down, the fault current reaches the earth bar and the upstream protection instead of sitting on your terminal wiring. NEC 250.4(A)(5) names the effective ground-fault current path and counts the earth itself out of it, so the link lands on the panel earth bar with its equipment grounding conductor back to the source. How that bar is built and bonded is in the grounding and bonding guide.

Standards line up behind one earth per circuit. The IEEE guide for grounding instrument transformer secondary circuits (2015) recommends an earth reference for every CT and VT secondary and for the case of the connected equipment; IEC 61869 governs the instrument transformers themselves. On high-voltage CTs, from about 66 kV up, the primary carries an earthed shield that intercepts most of the coupling, so the transferred voltage is small. Keep the link anyway: the shield does nothing for the insulation-failure case, and every lower-voltage CT has no shield at all.

How you leave the secondary Open-circuit hazard Coupled or fault voltage Verdict
Open, no earth Kilovolt peaks while the primary is loaded Present Never use
Shorted, no earth Removed Winding floats, up toward primary potential Incomplete
Shorted, one earth point Removed Pinned near 0 V Build it this way
Shorted, earths at both ends Removed Pinned, but the two earths close a loop One point per circuit instead

What you need at the panel

  • CT test terminal blocks with shorting links, one block group per circuit, at the end where you test.
  • Earth-link wire in green or green with a yellow stripe, the same cross-section as the secondary conductors; 2.5 mm² [14 AWG] is the common CT secondary size, and NEC 250.119 sets the colour for insulated grounding conductors 6 AWG and smaller.
  • An earth bar with a spare way per circuit — one earth bar or a single stud settles that choice for the whole panel.
  • Labels for the link and the drawing.
  • A low-ohms meter with nulled leads, and a 500 V DC insulation tester.

Wiring the short and the single earth

Safety note: work with the primary de-energized, or through the shorting links with the links closed. An opened secondary on a live CT is the exact hazard you are there to remove.

  1. Count the circuits. Each CT winding is its own circuit. A governor fed by three single-phase CTs is three circuits — 2 + 2 + 2 = 6 conductors with no shared neutral — and spare cores count as circuits too.
  2. Short every unused core S1 to S2 at its own terminal block, as close to the CT as the terminals allow, and make the short permanent.
  3. Fit one earth link per circuit, from the shorted point to the earth bar, on the same polarity side of every circuit — S1 everywhere, or S2 everywhere — so drawings and future tests read the same way. Three circuits, three links; the count is the rule.
  4. Land each cable shield at one end only, on the panel earth, away from the CT earth point. VFD control cable shield grounding follows the same one-end logic: bond it once and let the screen be a screen.
  5. Label the link at the block and on the drawing: "CT earth — one link per circuit". The label is what stops commissioning from adding a second earth a week later.
  6. Read the isolation spec of the current inputs. If the three channels are isolated from each other and from logic ground, the three separate links stand. If they share an internal common, earth that common at one point instead, or your three links close a loop through the input card.

Worked example: three CT pairs into a governor

Three metering cores, 1000:5 A, class 0.5, each on its own shielded 2.5 mm² pair running 40 m [130 ft] to the panel. The ratio is 1000 / 5 = 200:1. With the feeder at 720 A, each channel should carry 720 / 200 = 3.60 A. A class 0.5 core allows ±0.5 % current error at rated current (±0.75 % at 20 % of rating), so accept 3.58 A to 3.62 A at this loading. Three circuits take three earth links, all on the S2 side in this panel, each on its own way of the bar. The 0 V of a 24 V DC supply sharing the box follows the same one-point logic — grounding the 0 V of a 24 VDC supply covers that side.

Checks that prove the job

  • De-energize the primary and disconnect the governor inputs, because 500 V DC damages electronics; lift the single earth link and insulation-test the circuit to earth. Secondary-circuit commissioning practice tests at 500 V DC and passes above 1 MΩ; a low reading means a second earth somewhere, usually the shield or a pinched conductor.
  • Re-fit the link and measure from the shorted point to the earth bar with the leads nulled: under 0.5 Ω.
  • At the far end of each cable, shield-to-earth reads open, proving the screen lands at one end only.
  • Energize and clamp each secondary against the feeder: 720 A on the primary is 3.60 A per pair, inside the 3.58 A to 3.62 A band.
  • Count once more: circuits = links. Any other number means a link is missing or doubled.

Three ways this goes wrong

  • Earths at both ends of one circuit. Earth-potential differences between the CT cubicle and your panel drive current around the loop. Around 100 m [330 ft] of 2.5 mm² copper — about 0.7 Ω — a 0.2 V difference pushes 0.29 A into a 5 A metering circuit: a 6 % error at full load, near 12 % at half load. One point per circuit keeps it out.
  • Shield and secondary sharing an earth terminal. Shield noise current then develops its voltage inside the metering loop. Give the screen its own terminal on the panel earth.
  • Forgotten spare cores. A metering CT with one core in use and two spare still has two circuits to short and earth. They are the ones nobody labels, and the ones a technician meets first at the terminal block.

Where the blocks and the earth bar live

CT shorting blocks, the earth bar and the labels go on the backplate of the box closest to the CTs, with rail, duct and bending space set out in the backplate and DIN rail layout guide. A small stainless box carries the pairs and the spare cores well: the stainless steel junction boxes come in 9 wall-mount sizes with panel and DIN capacity listed per size, rated NEMA 4X / IP66 by the manufacturer and not UL listed. If you are sizing the box rather than filling it, the enclosure selector takes the inside height, width and module count and carries your cutouts to a quote.

Catalog dimensions to compare

Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.

EnclosureMaterialOutside H x W x D / displayRating
6 × 6 × 4 in304 stainless6 x 6 x 4 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
8 × 6 × 4 in304 stainless8 x 6 x 4 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
10 × 8 × 4 in304 stainless10 x 8 x 4 inRated NEMA 4X / IP66 by the manufacturer; not UL listed

Questions

Does a spare CT core that is shorted still need an earth link?

Yes. The short kills the open-circuit hazard, whose peaks run into kilovolts while the primary is loaded, but a shorted winding still floats. Coupling through the winding capacitance can leave it at tens to hundreds of volts, and 231 V appears in the worked case above. The single earth link pins it near 0 V and gives an insulation fault a path to the earth bar.

What happens if I earth one CT circuit at both ends?

The two earths form a loop, and any earth-potential difference between them drives circulating current through your metering circuit. Around a 0.7 Ω loop of 100 m of 2.5 mm² copper, a 0.2 V difference pushes 0.29 A, which is a 6 % error on a 5 A circuit at full load and near 12 % at half load. Keep one earth point per circuit.

Can the cable shield land on the same terminal as the CT earth link?

Keep them on separate terminals. The shield drains noise current to the panel earth; if it shares the secondary earth point, that current develops its voltage inside the metering loop. Land the screen at one end only, on the panel earth bar, and give the CT link its own single point on the same bar.

How do I check for a second, accidental earth on a CT circuit?

Lift the one intended earth link with the circuit de-energized, then insulation-test the conductors to earth at 500 V DC. A healthy circuit reads well above 1 MΩ. A low reading means a second earth exists somewhere, usually the shield or a pinched conductor. Re-fit the single link and confirm near-0 Ω continuity to the bar.

Checklist before you order

Specify it once, built to your drawing

  • Environment and NEMA type: Type 1, Type 3R, Type 4, Type 4X, Type 6P, Type 12, Type 13 (manufacturer ratings, not UL listed)
  • Material: 304 stainless steel, 316L stainless steel, Powder-coated carbon steel, Aluminum, Polycarbonate, Fiberglass (FRP)
  • Size: inside or outside height, width and depth, with the depth your deepest component needs
  • Cutouts, glands and windows, dimensioned from one datum on each face
  • Mounting and access: wall, pole or stand, hinge side, mounting panel
  • Quantity: from one piece

Delivered in 10 business days, anywhere in the world. Counted from your order; for custom work, from your approval of the drawing.

Start a junction box from 6 × 6 × 4 inRequest a custom quote

Stainless junction boxes: sizes for this job

Keep reading

Related engineering answers

All articles

Buying guides

The guides behind this answer

All guides