Equipment grounding conductor size for a 4160 volt circuit

Size the equipment grounding conductor on a 4160 volt circuit from the rating or setting of the phase overcurrent device ahead of the equipment: a 2000 A phase pickup needs 250 kcmil copper from Table 250.122. The ground-fault pickup is protection tuning, not the overcurrent device, so its 400 A value never selects the row.

NEMA4 Enclosure engineering team · Published November 13, 2026 · 8 min read

Short answer: the phase 50/51 pickup selects the row in NEC Table 250.122, and the 51G never does. On a 4160 V feeder with a 2000 A phase pickup, that means 250 kcmil copper minimum; the #3 AWG copper that the 400 A ground pickup would return is the wrong conductor. The NEC sizes a wire-type equipment grounding conductor from the rating or setting of the automatic overcurrent device in the circuit ahead of the equipment, using Table 250.122. On a medium-voltage feeder, that device is the phase relay element, and a ground pickup is protection tuning, not the rating of the device that clears the fault. The grounding and bonding guide carries the fundamentals. What follows is the table lookup, the CT conversion from secondary amps, the thermal check behind the number, and the record that keeps the size right when someone edits the relay file next year.

Which relay setting selects the row

You read the setting of the automatic overcurrent device in the circuit ahead of the equipment across Table 250.122. On a 4160 V feeder the phase 50/51 element is that overcurrent device, and its pickup stands between the cable and damage. The ground-fault element is a trip tuned to the grounding scheme, so a table built around the overcurrent device takes no interest in it.

You see the same split at low voltage: when a molded-case breaker carries a built-in ground-trip function, its ground setting stays out of the EGC lookup. Medium voltage just makes the split visible, because the trips live in a relay file instead of a trip unit. Above 600 V the NEC also selects feeder overcurrent protection on system and cable withstand rather than on conductor ampacity alone. That is why the governing value sits in the settings file rather than on a breaker handle.

Candidate for the table row Primary amps Table 250.122 result, copper What the element does
Phase 50/51 pickup 2000 A 250 kcmil The overcurrent device ahead of the equipment
Ground-fault pickup 400 A #3 AWG Sensitive ground-fault trip; it protects, it does not size

The phase setting also survives personnel changes better. An engineer can raise the ground pickup during a coordination pass without ever seeing the cable schedule, while the phase pickup follows the source and cable ratings and moves far less often. Size to the value that moves the least and governs the worst case: the phase setting.

What you need on the bench

Gather five items before you commit to a size:

  • the relay settings file, with the 50/51 and ground pickups in secondary amps
  • the phase and ground CT ratios, so secondary amps convert to primary amps
  • the cable schedule, for the phase conductor size that caps the EGC
  • the short-circuit and coordination study, for the maximum ground-fault current and the clearing time of each trip path
  • the landing plan: where the EGC terminates, which junction boxes and pull points it passes, and how each metal enclosure bonds

The first four feed the steps below; the fifth decides terminations and bonding hardware at the box.

Sizing steps from relay file to cable schedule

  1. Read the phase 50/51 pickup in secondary amps and multiply by the phase CT ratio. A 5.00 A pickup on a 2000:5 A CT gives 5.00 × (2000 ÷ 5) = 2000 A primary. How those pickup values get chosen is its own subject; how relay overcurrent pickup settings are configured walks the elements and their coordination.
  2. Take the nearest Table 250.122 row at or above the primary value: 2000 A returns 250 kcmil copper minimum.
  3. Keep the ground pickup out of the lookup. Its 400 A returns #3 AWG, which sizes a trip function, not a conductor.
  4. Compare with the phase conductors, because the EGC never has to be larger than them. With 250 kcmil phases the answer stays 250 kcmil; smaller phases cap it at their own size.
  5. Run the thermal check of the next section against the study, taking the slower of the two clearing paths.
  6. Grow the EGC in proportion when the phases grow for voltage drop: a 1.5-times area increase takes the EGC with it.
  7. Record the basis on the one-line and cable schedule: sized from the phase overcurrent setting per the NEC Table 250.122 rule. Put the EGC size in the relay setting change-control record as well. A pickup change that moves the table row then triggers a conductor review.

Steps 1 and 2 settle the example feeder at 250 kcmil copper; steps 5 and 7 keep it right after the project closes.

The I²t budget behind the table value

NEC 250.4(A)(5) calls the EGC part of the effective ground-fault current path, and the earth is not considered part of it. The wire must carry the fault until the device ahead clears it, and it survives only when the fault energy stays inside its thermal limit. That limit is I²t, and it scales with the square of the cross-section, which is why the table's area steps carry so much weight. The EGC and the plant grounding grid answer different questions; equipment grounding conductor vs plant grid at the enclosure sorts out which conductor handles which job.

Use the standard conductor adiabatic equation, S = I × √t ÷ k, with k = 115 A·√s/mm² for copper rising from 90 C to 250 C, the usual thermosetting-insulation assumption. PVC insulation gives k = 103, about 10 percent less withstand. The fault current and clearing time below are worked-example assumptions, so put your study's numbers in their place before you sign the cable schedule.

  • 250 kcmil copper measures 126.7 mm², so its withstand is 115 × 126.7 = 14,570 A·√s, or 2.12 × 10^8 A²s
  • #3 AWG measures 26.7 mm², so its withstand is 115 × 26.7 = 3070 A·√s, or 9.4 × 10^6 A²s

Divide the withstand by the fault current squared for the survival time, t = I²t ÷ I²:

Fault current through the EGC 250 kcmil survives #3 AWG survives
2000 A 53 s 2.4 s
8000 A 3.3 s 0.15 s

Worked check at 8000 A: 2.12 × 10^8 ÷ (8000)² = 2.12 × 10^8 ÷ 6.4 × 10^7 = 3.3 s. Suppose the study's worst clearing time is 0.30 s, say a 0.20 s relay time plus a 0.10 s breaker time. The duty is then (8000)² × 0.30 = 1.92 × 10^7 A²s, and the margin is 2.12 × 10^8 ÷ 1.92 × 10^7 ≈ 11. A #3 AWG sized from the ground setting survives the same fault for 0.15 s, half the assumed clearing time. That is the failure you invite when the phase element ends up clearing a ground fault while the ground element is out of service.

Resistance-grounded feeders and later changes

A resistor-grounded 4160 V system caps the ground-fault current at the resistor's rating: 400 A on the example system, right at the 51G pickup. A 400 A fault sits below the 2000 A phase pickup, so the phase element never picks up on it, which is exactly why the ground element exists. The sizing rule holds anyway, because the phase element remains the device Table 250.122 points at.

The margin is comfortable. The same math gives 250 kcmil copper a survival time of 2.12 × 10^8 ÷ (400)² = 1327 s, about 22 minutes at the resistor-limited current. The ground trip clears in cycles, so the conductor was never the weak link. Sizing from the 400 A pickup to save copper buys a #3 AWG whose adequacy then hangs on the relay file: a mis-set or disabled ground element, a coordination pass that raises the pickup, a resistor swap to a different rating. One rule for every grounding scheme keeps the cable schedule independent of whichever setting happens to be in the file that week.

Where the EGC lands and what it bonds to

The conductor runs with the feeder and lands on a ground bar in the switchgear or the downstream enclosure; at outdoor pull points it lands in a bonded box. NEC 250.96(A) requires metal parts serving as equipment grounding conductors — raceways, enclosures, fittings — to be bonded together so they can carry the fault current likely to be imposed on them. NEC 250.12 adds that paint, lacquer and enamel come off the contact surfaces at grounding and bonding connections unless the fitting is designed to bite through them.

Three hardware habits keep the path intact at the box:

Landing on aluminum instead of copper changes the hardware list too: terminations rated for aluminum and joint treatment at outdoor connections. Aluminum grounding conductor terminations at outdoor enclosures walks that practice.

Where the splice point sits outdoors, a stainless steel junction box gives the splices a gasketed home, rated NEMA 4X / IP66 by the manufacturer and not UL listed. Match the splice kits and terminations to the cable's voltage class; the box is the weather housing around them. Lock out the feeder and verify absence of voltage before you open anything on a 4160 V circuit.

Mistakes that surface at commissioning

  • Reading secondary amps straight into the table. A 5.00 A pickup is not a row in Table 250.122; multiply by the CT ratio first, then look up.
  • Sizing from the ground pickup because the copper is cheaper. The #3 answer gives up about 4.8 times the area and about 23 times the fault-energy margin that the phase setting calls for.
  • Letting a voltage-drop fix upsize the phases without growing the EGC in proportion.
  • Treating the table value as the whole job on a long run. A long, small EGC adds impedance to the fault loop and can stretch clearing; the study's current and time decide whether the minimum stands.
  • Leaving the EGC size out of the relay change-control record, because the next coordination pass is where an undersized conductor gets born.

Catalog dimensions to compare

Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.

EnclosureMaterialOutside H x W x D / displayRating
12 × 10 × 6 in304 stainless12 x 10 x 6 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
20 × 16 × 8 in304 stainless20 x 16 x 8 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
24 × 20 × 8 in304 stainless24 x 20 x 8 inRated NEMA 4X / IP66 by the manufacturer; not UL listed

Questions

Does a resistance-grounded 4160 V feeder change the EGC size?

It stays the same. The resistor caps the ground-fault current, and MV resistor nameplates commonly read 100 to 1000 A, so a 250 kcmil copper EGC sized from the 2000 A phase setting carries a 400 A fault for about 22 minutes by the adiabatic math, far beyond any realistic trip time. The ground element remains the protective device; the table row comes from the phase overcurrent device either way.

What happens to the EGC when the phase conductors are upsized for voltage drop?

Grow it by the same area factor. If the phases rise from 400 to 600 kcmil, a factor of 1.5, a 250 kcmil EGC needs 250 × 1.5 = 375 kcmil, and the next standard size, 400 kcmil, is the smallest conductor that satisfies it. Note the new row beside the voltage-drop calculation so the cable schedule and the one-line stay in agreement.

Can the EGC be aluminum on a 4160 V feeder?

Yes, from the aluminum column of Table 250.122: the same rows that give #3 AWG copper at 400 A and 250 kcmil copper at 2000 A give 1 AWG aluminum and 400 kcmil aluminum. Terminations must be rated for aluminum with joint treatment at outdoor connections, and the larger conductor needs a deeper box at the splice point.

Can the metal raceway carry the fault path instead of a wire EGC?

A fully bonded metal raceway can serve as the equipment grounding path in its own right, and medium-voltage metal-clad cable brings its own grounding means between terminations. Where you pull a wire EGC anyway, across nonmetallic sections or where the study wants a defined conductor, it takes the phase overcurrent setting exactly as in this article, and the raceway joints carry the same fault duty.

Checklist before you order

Specify it once, built to your drawing

  • Environment and NEMA type: Type 1, Type 3R, Type 4, Type 4X, Type 6P, Type 12, Type 13 (manufacturer ratings, not UL listed)
  • Material: 304 stainless steel, 316L stainless steel, Powder-coated carbon steel, Aluminum, Polycarbonate, Fiberglass (FRP)
  • Size: inside or outside height, width and depth, with the depth your deepest component needs
  • Cutouts, glands and windows, dimensioned from one datum on each face
  • Mounting and access: wall, pole or stand, hinge side, mounting panel
  • Quantity: from one piece

Delivered in 10 business days, anywhere in the world. Counted from your order; for custom work, from your approval of the drawing.

Build it from 12 × 10 × 6 inRequest a custom quote