Skip the buried handhole and splice this gate feeder in a box on a post, bottom 12 in [300 mm] above grade. Both conduit stub-ups enter through the bottom hubs, the three splices are dual-rated AL9CU/CU connectors listed to UL 486D for wet locations, and the copper side is sized to the house breaker on the wet column: 6 AWG copper THWN carries 65 A at 75 C and covers the example's 60 A breaker. A splice that lives above grade stays dry, opens with a screwdriver in ten minutes, and shrugs off the sprinkler line. A splice set flush at grade asks every connector to hold back standing water for the life of your feeder.
Why the box goes on a post
A handhole set flush in the ground sits in a puddle for most of its life. Rain runs in, the lid traps it, and your connectors work below the water line. Connectors listed to UL 486D are built for that service: sealed insulated connectors tested for wet locations and direct burial. The build is legal. It is also the harder one, because every joint does the sealing and nobody troubleshoots it without a shovel.
A box on a 4x4 post keeps the splice in air. The PVC junction box costs less than a rated handhole, the hubs face down so water drains out of the entries, and the cover comes off in a minute. Keep the post out of the mower's path or guard it. Where a car can reach the spot, a flush polymer-concrete handhole rated for traffic is the enclosure that survives the hit.
Two code points drive the rest. The NEC requires conductors in wet locations to carry a wet rating, so the gate side wire is THWN or THWN-2; a wire marked THHN only is a dry-interior wire. And splices sit inside listed boxes or fittings, with every material in a wet installation rated for wet service. The wiring-side limits for a run like yours are covered in outdoor panel wet location ratings and wiring limits. A splice that truly must stay buried is a different sealing problem, covered in sealing a junction box buried in the ground without leaks. Keeping a box out of wet ground is the same logic as mounting a junction box under a deck above wet ground.
What you need
- Three insulated multi-tap connectors marked AL9CU/CU and listed to UL 486D for wet locations, each sized for 2 AWG aluminum and 6 AWG copper on the example build — two hots and one neutral. Most carry a 600 V rating, like every connector on a 120/240 V feeder.
- Adhesive-lined heat-shrink butt caps or splice kits marked aluminum-to-copper and UL 486D, if you prefer shrink over set-screw taps.
- Antioxidant joint compound for aluminum terminations.
- 6 AWG copper THWN for the continuation and 10 AWG green equipment grounding conductor, on the example breaker.
- A PVC junction box big enough for three connectors and a ground bar, with two hubs matched to your stubbed conduit — 3/4 in [21 mm] trade size covers most gate circuits.
- A torque tool; the connector label prints the value in lb-in, and those marks matter more than feel.
Read the package before it leaves your truck. UL 486D on the label means wet locations and direct burial; a plain dry-interior twist-on is the joint that gets dug up twice. The terminal and gland side of a build like this is covered in motor lead splices outdoors: box, glands and terminals.
Sizing the splice: 2-2-4 URD to copper THWN
Inputs. The feeder is 2-2-4 URD aluminum: two 2 AWG hots and a 4 AWG neutral, the run already in the ground. The house breaker is 60 A two-pole — an assumption, and a typical one for 2 AWG aluminum URD; read yours at the panel before you buy wire. Copper ampacities come from the NEC ampacity table at 75 C: 10 AWG 35 A, 8 AWG 50 A, 6 AWG 65 A, 4 AWG 85 A, 3 AWG 100 A. The same table gives 2 AWG aluminum 90 A. EGC sizes come from NEC Table 250.122, keyed to the breaker ahead of them.
The rule. No breaker sits between the house and your splice, so the copper continuation carries the house breaker's full rating. Outdoors you size on the 75 C column, because THWN's wet rating is 75 C; the 90 C THHN figure applies only to dry interiors.
The arithmetic. The example breaker needs copper rated at its full 60 A or more at 75 C. 8 AWG carries 50 A and comes up 10 A short. 6 AWG carries 65 A and passes with 5 A of margin. The URD side is not close to limiting: 2 AWG aluminum at 90 A carries the load with 30 A to spare. NEC Table 250.122 sizes the EGC from the breaker ahead of it, which is 10 AWG copper at this size. Three conductors get spliced — two hots and one neutral — so three AL/Cu connectors.
The result. 6 AWG copper THWN hots, 6 AWG white neutral, 10 AWG green EGC, three sealed Al/Cu connectors.
The decision, by breaker size:
| House breaker | Copper THWN at 75 C | Ampacity | Green EGC (NEC Table 250.122) |
|---|---|---|---|
| 30 A | 10 AWG | 35 A | 10 AWG |
| 60 A | 6 AWG | 65 A | 10 AWG |
| 100 A | 3 AWG | 100 A | 8 AWG |
Read it with the URD in mind: 2 AWG aluminum covers every row at 90 A, so aluminum needs no change. A gate operator rarely needs more than the 30 A row; the middle row fits when the feeder continues to a sub-panel at the gate.
Cutting in the splice box
- Switch off the URD breaker at the house panel, lock it, and verify absence of voltage at both stub-ups before any conductor is cut.
- Set the post so the box bottom sits 12 in [300 mm] above grade — above splash height and above the sprinkler arc.
- Cut both stub-ups into the box with 6-8 in [150-200 mm] of free conductor past each hub, enough to remake any connector later.
- Fit the two hubs in the bottom of the box and seal every spare opening with a listed plug; the fitting at the hub is covered in wet location flex conduit connector for an outdoor box.
- Brush antioxidant onto every stripped aluminum strand, then make the three splices; torque each set screw to the label value and mark it with a paint pen.
- On heat-shrink caps, shrink until sealant weeps from both ends of every cap. That weep is the made seal.
- Land the green conductors on a ground bar. PVC needs no bond; a metal box bonds to the bar, and NEC 250.96(A) requires metal parts serving as grounding conductors to be bonded together so they can safely carry fault current.
- Close the cover and label it with the feeder it continues: "gate feeder — house panel".
Checks when the cover goes on
- Pull test: tug each conductor firmly; nothing moves at a connector.
- Insulation: with a 500 V insulation tester, each conductor to ground reads in the megohms on a dry day; a reading near zero means a nicked conductor.
- Seals: adhesive shows at both ends of every shrink cap, and every paint-pen mark sits where you left it.
- Heat: run the gate through ten full cycles, then point an IR thermometer at each connector. Thermography practice puts the alarm line about 10 C above the neighboring conductor; a hotter joint gets a re-torque.
- Water: open the box after the first good rain. A dry interior and a clean cover underside mean the hubs and plugs are seated.
- Creep: aluminum cold-flow relaxes Al/Cu joints slightly, so re-torque them at the first year's service visit.
Mistakes that sink a gate splice
- Rubber splice tape as the only seal. It is not a listed wet-location system, and the oxide film under it keeps growing; tape is armor over a capped splice, nothing more.
- THHN-only wire outdoors. The wet rating is what the job needs; dual-marked THHN/THWN is the same conductor used correctly, sized on the 75 C column.
- A copper-only twist-on on aluminum strands. Oxide builds, resistance climbs, and the joint runs hot enough to burn its insulation. Connectors marked AL9CU/CU only.
- Antioxidant skipped. Stripped aluminum re-oxidizes within minutes, and the compound is what keeps contact resistance low for decades.
- Connectors set below grade without a wet listing. Those are the splices that get dug up twice.
What to put on the order
- A PVC junction box and a 4x4 post suit most gates. Order the box by connector count and hub trade sizes, not by wire count.
- Near a pool line, irrigation heads or salt air, 304 or 316L stainless is the longer-lived shell: we cut the two hub openings you mark, build from one piece, and deliver in 10 business days from your drawing approval; the dimensions go in at custom enclosures.
- Pick the rating by water, not by habit. Type 3R keeps rain and sleet off the splice; Type 4X adds corrosion resistance for washdown or coastal spray. Both are manufacturer ratings for the specified design and not UL listed. In US installations NEC 110.28 keeps the enclosure type on the drawing: the IP code printed alongside it does not replace the Type rating. What each type survives is laid out in the NEMA 3R vs NEMA 4 guide.
- The grounding hardware, the bar and the rod rules at the post are in the enclosure grounding and bonding guide.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 6 × 6 × 4 in | 304 stainless | 6 x 6 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 8 × 6 × 4 in | 304 stainless | 8 x 6 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 10 × 8 × 4 in | 304 stainless | 10 x 8 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Can I splice a URD feeder inside a buried handhole enclosure?
Yes, when the handhole sits flush at grade and every connector inside carries a UL 486D listing for wet locations. Expect standing water in a flush box after any rain, so the connectors do the sealing, not the box. Where a mower or a car can reach the spot, a polymer-concrete handhole rated for the load is the box that survives. A box on a post 12 in above grade keeps the splice in air and is the easier build.
Is rubber splice tape watertight enough on aluminum conductors?
Alone, rubber tape is not a listed wet-location splice system, and aluminum makes it worse: the oxide film keeps growing under the wrap. Use adhesive-lined heat-shrink caps or butt connectors marked for aluminum-to-copper and UL 486D, most rated 600 V. Their sealant weeps out of both ends when fully shrunk, and that weep is the made seal. Tape still helps as abrasion armor over a finished cap.
What copper size continues a 2-2-4 URD feeder at the splice?
Set the copper by the house breaker, on the 75 C wet column. For the example breaker, 6 AWG copper THWN carries 65 A and covers it; 8 AWG carries 50 A and falls 10 A short. A 30 A breaker takes 10 AWG copper at 35 A. The URD is not the limiting side: its 2 AWG aluminum phases carry 90 A at 75 C.
How do the grounds land at a posted splice box?
Land the gate side equipment grounding conductors on a ground bar and bond the metal box to it; NEC 250.96(A) requires metal parts serving as grounding conductors to be bonded so they can carry the fault current. Size the EGC from the breaker ahead of it per NEC Table 250.122 — 10 AWG copper at the example breaker. Keep the URD's 4 AWG neutral on its own insulated terminal, and a ground rod at the post is only an auxiliary electrode under NEC 250.54.