Put a #6-to-#10 motor splice in a stainless box the maker rates NEMA 4X / IP66 (not UL listed), about 12 x 10 x 6 in for a three-phase joint. Enter through two bottom glands, splice with split bolts or a 65 A power block, wrap three half-lapped tape layers, bond the ground per NEC Table 250.122, then megger at 500 V DC.

NEMA4 Enclosure engineering team · Published November 4, 2026 · 10 min read

Short answer: make the #6-to-#10 motor splice inside a small stainless junction box rated NEMA 4X / IP66 by the manufacturer; not UL listed. Bring both cables in through glands on the bottom wall. Close each joint with a split bolt or a power block under three half-lapped tape layers. Ring lugs on a bolt, taped and left loose in a corner, have no strain relief, no way to shed water and no way to inspect. That is how those joints corrode loose. For a three-phase job, a 12 x 10 x 6 in 304 stainless box holds four splices, two glands and their drip loops with room to work, and it is delivered in 10 business days anywhere in the world. The sections below give the box size, the tape count, the gland ranges and the tests.

Where does a motor lead splice have to live?

Splice inside an accessible box rather than on taped lugs in a corner. The NEC requires a box at each conductor splice connection point. Outdoors you want that box rated NEMA 4X / IP66 by the manufacturer, so rain, rinse water and hose spray stay off the copper. The rule buys you two things: the joint gets physical protection, and you can open the box a year later and inspect it without unwrapping a bundle in the dark.

The corner bundle fails three ways. Water wicks under a single tape layer and sits on the copper. Night cooling condenses moisture on the wrap. Motor vibration works a bolted lug loose over a season. A gasketed stainless box answers all three: the gasket keeps bulk water off the joints, the glands clamp the sheath so the splice is not the strain point, and the door gives inspection access.

Mount the box within reach of the motor's lead exit. Keep the bottom wall at least 6 in [150 mm] above the slab, so splash and washdown rebound pass under it. Keep it at that height when you bolt it up. 304 stainless covers most outdoor sites. Choose 316L where salt spray or brine reaches the box. The NEMA 4 vs 4X vs IP66 guide lays out what a Type 4X rating actually tests: hose-directed water plus another 200 hours of salt spray.

What do you need for a #6 to #10 motor splice?

For a three-phase splice you need the stainless box from the table below. Add four split bolts selected from the maker's combination chart for a #6-to-#10 pair (or a power block rated 65 A). You also need rubber-mastic, cambric and vinyl tape in 600 V class, and two cable glands sized to each cable's published outside diameter.

Part What to order
Enclosure 304 stainless wall-mount box, 12 x 10 x 6 in outside — this box
Cutouts Two bottom-wall gland holes, threaded for the gland bodies, drawn at order time in the custom enclosure builder
Joints Four split bolts sized per the package chart for #6 with one #10, or power blocks rated 65 A at 600 V
Insulation Rubber-mastic, cambric and vinyl electrical tape, all 600 V class, 1 in [25 mm] wide
Entries One M25 gland for the motor cord, one M32 for the feeder cord
Bonding Green insulated conductor and the box's ground boss

The joint carries the motor side of the circuit, not the feeder's ampacity. The example here is a 10 hp, 230 V three-phase motor at 28 A full load, the NEC motor-table value. Conductors get sized at 1.25 × 28 = 35 A, which is exactly 10 AWG copper at 75 °C under the NEC ampacity table for copper conductors. The #6 feeder at 65 A is voltage-drop margin. Every split bolt, block and lug in the box therefore carries a 35 A minimum rating, and a block that clamps #6 copper is typically rated 65 A at 600 V.

Check the fit before you order. Four taped splices run about 6 in [150 mm] long and 1.1 in [28 mm] across. Stacked with 1 in air gaps they occupy 4 × 1.1 + 3 × 1 = 7.4 in of the 12 x 10 x 6 in box's usable plate height and just over half its width. The 6 in depth leaves room in front of the plate for cable tails. If you would rather build on power blocks, four joints need about 150 mm of DIN rail, and the 10 x 8 x 6 in box starts to work; the larger box is the safer fit for split bolts on #6 copper.

How do you make the splice step by step?

Work in this order: land both cables in their glands after lockout, splice L1, L2 and L3 plus the ground, insulate each joint, bond the box and close it. Keep the spare length below inside, so any joint can be redone without new cable.

  1. Lock out the feeder circuit and verify absence of voltage at the splice point before touching a conductor.
  2. Bolt the box to the wall or post with the bottom wall 150 mm [6 in] or more above the slab.
  3. Install both glands in the bottom cutouts, then feed each cable through and form a 3 in [75 mm] drip loop outside.
  4. Cut each conductor with about 150 mm [6 in] of spare and strip around 1.5 in [38 mm] on the #6 ends, enough to seat full depth in the split-bolt barrel.
  5. Make the three phase splices: seat both conductors full depth in each split bolt and tighten until the strands bind solid, with no bare strand past the barrel.
  6. Splice the grounding conductor with its own split bolt, green to green.
  7. Wrap each joint with the three tape layers described below.
  8. Bond the box to the ground splice as the bonding section below details.
  9. Dress the joints at least 1/2 in [13 mm] off the walls and off each other, then seat the gasket dry and pull the cover screws evenly.

Skip solder on a motor circuit. Vibration fatigues a soldered joint right where the solder stops, while a compression joint keeps its clamp. The two wires on one terminal article covers the joint types and their failure modes in detail.

How do you insulate a split-bolt splice against rain and washdown?

Wrap three half-lapped layers — rubber-mastic tape on the bare conductor, cambric for mechanical wear, vinyl electrical tape as the outer weather skin. Start and finish 1 in [25 mm] onto the sound insulation. Expect the finished 6 AWG joint to measure about 1.1 in [28 mm] across.

  • Rubber-mastic tape, stretched and half-lapped over the whole bare span: it is the moisture seal, and it fills the split bolt's flared ends.
  • Cambric tape half-lapped over that: the varnished cloth is the abrasion skin, so the wrap survives a rub against the wall.
  • Vinyl electrical tape as the outer layer, half-lapped under steady tension: it takes the sun and the hose.

The tape arithmetic: a wrap the length of one splice, at half-lap with 1 in tape, advances 0.5 in per turn, so 12 turns per layer. At a 1.1 in bundle each turn consumes about 3.5 in (π × 1.1), so one layer takes about 42 in and three layers about 10 ft [3 m] per joint. Four joints means 40 ft of each grade — one full roll covers the box.

A single vinyl layer is the wrap that fails in a year. Water wicks along it, and the first rub wears it through. The three-layer build is the accepted field practice for motor leads in wet, vibrating service. On smaller leads you can crimp butt splices and shrink an adhesive-lined sleeve over each one — same three jobs, one part.

How do the cables enter the box without leaking?

Bring both cables in through the bottom wall. Each goes through its own gland whose clamping range covers the cable OD. An M25 gland (typical range 12-18 mm [0.47-0.71 in]) suits a 10/4 portable cord near 15 mm. An M32 (18-25 mm [0.71-0.98 in]) suits a 6/4 cord near 21 mm.

Entry Cable Cable OD (cord tables) Gland and range
Motor side 10/4 portable cord about 15 mm [0.59 in] M25, clamps 12-18 mm [0.47-0.71 in]
Feeder side 6/4 portable cord about 21 mm [0.83 in] M32, clamps 18-25 mm [0.71-0.98 in]
Raceway three 6 AWG THHN in conduit the conduit governs a conduit hub matched to the raceway

The 15 mm cord sits mid-range in the M25 window, and the 21 mm cord mid-range in the M32 window, which is where a clamp seals. A cable at the edge of its range walks loose with temperature swings. Catalog ranges vary between gland makers, so the datasheet range decides. Cord tables put 10/4 near 15 mm and 6/4 near 21 mm.

Form the drip loop before the sheath rises into the gland. Drop it at least 3 in [75 mm] below the entry, so water sheds off the cable instead of running into the seal. The full outdoor routine — loop shape, thread sealing, gland tightness — is in the seal an outdoor junction box walkthrough. The why glands face down outdoors article shows what a face-up entry collects. The sealing a gland on a smaller cable methods hold the seal when the gland range runs larger than the cable.

How do you bond the box and splice the ground?

Splice the equipment grounding conductor like any other joint and bond it to the box. NEC Table 250.122 sizes that conductor from the overcurrent device ahead of it: a 60 A breaker calls for 10 AWG copper, and a 100 A breaker for 8 AWG.

Give the ground its own split bolt; sharing a barrel with a phase conductor makes the joint impossible to inspect. Insulated grounding conductors of 6 AWG and smaller are green or green with yellow stripes (NEC 250.119), so the joint reads at a glance inside the box.

Bond the box itself with a short green conductor from the ground splice to the ground boss, torqued to clean bare metal. Stainless needs no coating stripped off. Wherever a paint or enamel film exists on a bonding surface, NEC 250.12 requires it removed from threads and contact points. A ground rod driven at the motor pad may stay connected as an auxiliary electrode under NEC 250.54, yet it never replaces the equipment grounding conductor. The earth is not part of the fault-current path.

The bonding fundamentals sit in the grounding and bonding guide. The motor junction box ground wire article walks the motor-side connection step by step.

How do you check the finished splice?

Check each joint mechanically and the whole circuit electrically before energizing. Give every taped splice a firm hand pull. Then megger the motor circuit at 500 V DC and hold it to the IEEE 43 minimum for low-voltage windings, (kV + 1) MΩ — about 1.2 MΩ at 230 V.

IEEE 43 sets 500 V DC as the test voltage for windings rated below 1 kV, which covers this circuit. A dry, healthy splice reads tens of megohms. A reading near the 1.2 MΩ floor means moisture is inside a wrap — dry the box, rewrap the suspect joint and retest. Push each cable at the gland to confirm the clamp holds, and look at the gasket line for a flat, even seat.

Run one megger check after the first hose-down or storm as well. That second reading is what proves the wrap and the glands, not just the bench work. When a value looks low, the troubleshooting insulation resistance at taped splices page walks the fault patterns a taped joint produces.

What mistakes cost the box its rating?

Four field habits turn a manufacturer-rated NEMA 4X / IP66 assembly into a wet box: a gland face up, a gland clamping outside the cable OD, an extra drain or vent hole, and a gasket pinched or seated dry. Each one hands water a path.

  • Entry above the water line. Face-up or high side entries pool water on the seal. Enter through the bottom wall and let the drip loop do its 3 in [75 mm] of work.
  • Gland range mismatch. A clamp that bottoms out on a small cable, or grips a fat one at the edge of its range, seals on day one and weeps in month six. Size to the OD mid-range.
  • A drain or vent drilled later. A 6 mm [1/4 in] hole drops the assembly to the drain's rating. NEC 314.15's approved 1/8-1/4 in openings belong to boxes listed for damp locations. On a splice box you keep water out rather than letting it out — the vent or sealed box comparison runs the dew-point numbers.
  • Gasket abuse. A gasket seated wet, twisted by uneven screws or taken a permanent set, leaks at the corners. Seat it dry and pull the screws evenly.
  • Wrap against an edge. A taped bundle rubbing a sharp wall wears through. Keep 1/2 in [13 mm] of air around every joint.

Decide by site. A dry, covered corner with little vibration takes crimp butt splices under adhesive-lined heat-shrink in the same sealed box — the fastest joint that still passes the megger. Rain, washdown or humid heat calls for the build in this article: split bolts, three tape layers, that 304 stainless box with bottom glands. Salt air or brine keeps every detail and moves the box to 316L, because chloride deposits pit 304 even at room temperature.

Catalog dimensions to compare

Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.

EnclosureMaterialOutside H x W x D / displayRating
12 × 10 × 6 in304 stainless12 x 10 x 6 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
10 × 8 × 6 in304 stainless10 x 8 x 6 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
6 × 6 × 4 in304 stainless6 x 6 x 4 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
8 × 6 × 4 in304 stainless8 x 6 x 4 inRated NEMA 4X / IP66 by the manufacturer; not UL listed

Questions

Can I splice #6 to #10 with a twist-on wire connector?

Yes, when the connector is listed for both sizes and the joint sits dry inside the rated box; a #6 twist-on connector runs about 1 in [25 mm] long and needs a firm pull test. On a vibrating motor in rain or washdown, a split bolt with three tape layers or a covered power block holds up longer, because the connector's steel spring is the first part to corrode.

What gland size fits the cables?

Match the clamping range to the cable's published OD. A 10/4 portable cord reads about 15 mm [0.59 in] and suits an M25 gland (12-18 mm typical range); a 6/4 cord near 21 mm [0.83 in] suits an M32 (18-25 mm). The gland's datasheet range governs, and the cable should sit mid-range where the clamp seals best.

Does the splice box need a drain hole?

Keep it sealed. A field-drilled 6 mm [1/4 in] drain drops a manufacturer-rated NEMA 4X / IP66 assembly to the drain's own rating, and NEC 314.15's approved drainage openings belong to boxes listed for damp locations. Bottom entry, 3 in [75 mm] drip loops and a dry-seated gasket keep the inside dry without a hole in the floor.

How often should a motor splice box be inspected?

Open it once a year, before the wet season: look for water tracks below the glands, re-tape any joint whose wrap has rubbed shiny, and megger at 500 V DC. A dry splice reads tens of megohms, and under about 1.2 MΩ (the kV + 1 rule) means moisture is inside. A washdown site wants a look every six months.

Checklist before you order

Specify it once, built to your drawing

  • Environment and NEMA type: Type 1, Type 3R, Type 4, Type 4X, Type 6P, Type 12, Type 13 (manufacturer ratings, not UL listed)
  • Material: 304 stainless steel, 316L stainless steel, Powder-coated carbon steel, Aluminum, Polycarbonate, Fiberglass (FRP)
  • Size: inside or outside height, width and depth, with the depth your deepest component needs
  • Cutouts, glands and windows, dimensioned from one datum on each face
  • Mounting and access: wall, pole or stand, hinge side, mounting panel
  • Quantity: from one piece

Delivered in 10 business days, anywhere in the world. Counted from your order; for custom work, from your approval of the drawing.

Start a junction box from 12 × 10 × 6 inRequest a custom quote

Stainless junction boxes: sizes for this job

Keep reading

More on layout and installation

All articles

Buying guides

The guides behind this answer

All guides