When a drive runs 400 Hz from its own keypad but stops at 327 Hz on the external analog command, the drive and the spindle are healthy: 327 ÷ 400 = 81.75%, so the input terminal never sees the full-scale voltage the drive maps to top speed. On an input documented for 0-10 V, that ratio puts about 8.2 V at the terminal at maximum command, 1.8 V short. Measure the DC voltage between the input terminal and the drive's signal common while the controller commands 100%. Then make the command source reach the documented full scale, or set the drive's input range to the voltage the source actually delivers. Keypad speed proves the drive; the shortfall lives in the command path between the controller and the terminal strip.
Symptoms and what each one points to
Match the symptom before touching a wire; each one sends the diagnosis in a different direction.
- Keypad reaches the target, external command stops short. The drive, motor and frequency ceiling are good; work the analog command path.
- Speed tracks the command but tops out early, smoothly. The shortfall is linear across the range: the terminal voltage stops below full scale, here at 81.75% of it.
- A larger rpm command changes nothing past one speed. The source has saturated, or the controller's spindle scaling caps its own output below 100%.
- Frequency wanders, steps or surges near the top. Noise on the reference: raw PWM reaching the drive, or a shared return conductor carrying drive switching current.
- Stalls or trips only at maximum command. This is load or limits, not scaling: check the spindle load and the drive's acceleration setting before the reference wiring.
The causes, in order of likelihood
1. The command source never reaches full scale. Most shop-floor toolchains build their analog reference from a PWM output. A filtered PWM's average voltage equals its duty cycle times its high level, so a converter fed from a 5 V rail can never deliver more than 5 V, whatever the software requests; a converter on a 12 V rail can stop short of the documented maximum in its output stage. The result is a fixed percentage ceiling, 81.75% in the worked example below.
2. Signal and input range disagree. Small drives name separate ranges on the terminal strip — 5 V in, 10 V in, 20 mA in — and the drive's range and command-source settings decide which one is live. A full-scale input fed by a source that stops at 8.2 V reads 82%, and the drive tops out at 327 Hz of the target. On some drives the terminal labelled as the maximum is the supply for an external speed potentiometer, not a command input; the terminal diagram decides.
3. Voltage lost between source and terminal. A common offset between the controller ground and the drive's signal common adds to or subtracts from the reference, and loose terminals add contact resistance. Resistance in the pair itself costs millivolts; offsets are measurable, so measure rather than guess. A gap of 1.8 V points at the source more often than at the wiring.
4. The frequency ceiling sits below the target. Cleared first in this case: the keypad reached the target, so the maximum-frequency setting already allows it. Re-read it after a parameter change, not before the voltage measurement.
Measuring the shortfall on a 2.2 kW spindle drive
The inputs, with their sources:
| Input | Value | Source |
|---|---|---|
| Target output frequency | 400 Hz | Keypad run; the drive's maximum-frequency setting |
| Observed output at maximum command | 327 Hz | Drive display during external control |
| Input full scale | 10 V = top output | Drive's terminal documentation, 0-10 V input |
| Spindle speed at target | 24000 rpm | 2-pole spindle: n = 120 × f ÷ p |
The rule: a drive maps its documented full-scale input voltage to its top output frequency, so the output frequency equals the target times the ratio of terminal volts to full-scale volts. Run the ratio backwards from the two frequencies to predict the terminal voltage, then put a meter on the terminal and compare.
The arithmetic:
- Ratio: 327 ÷ 400 = 0.8175, so the drive stops at 81.75% of target.
- Predicted terminal voltage: 0.8175 × 10 V = 8.175 V, call it 8.2 V.
- Missing voltage: 10 V − 8.175 V = 1.825 V, call it 1.8 V.
- Spindle cross-check: 120 × 327 ÷ 2 = 19620 rpm, which is 4380 rpm below the 24000 rpm command, the same 81.75%.
The result: at maximum command the terminal should read near 8.2 V, and the drive is converting exactly what it receives. The reference never reaches full scale, so the scaling caps the speed.
The decision: 1% of range is 0.1 V, which is 4 Hz on this drive (400 × 0.01) and 240 rpm on the 2-pole spindle (60 rpm per Hz). If the meter reads more than 0.1 V below full scale at maximum command, fix the source or rescale the input. If it reads within 0.1 V of full scale and the speed still stops short, the input scaling or ceiling parameter inside the drive is the remaining suspect — and the keypad test already cleared the ceiling.
The fix: make the volts match the documented range
- Measure at the terminal. Meter on DC volts across the input terminal and the drive's signal common; command 100% and record the reading. A value near 8 to 9 V against a full scale of 10 V confirms a source-side ceiling.
- Land the signal on the documented input. Connect the converter's analog output to the terminal the drive documents for voltage command, with the drive common as return. The wiring fundamentals — routing, shield and terminal choice inside a stainless box — are in the VFD speed signal wiring guide. Do not use a terminal labelled as a potentiometer supply or voltage feed as the command input; it feeds out, it does not read in.
- Rescale where the drive allows it. Where the drive exposes an input range or gain setting, set full scale to the voltage the source actually delivers: a source topping at 5 V belongs on a 5 V-capable input, or on a gain setting that maps 5 V to top speed. Match the range first; trimming software percentages over a mismatched range hides the fault instead of curing it.
- Bond the commons at one point. Run one short conductor from the controller's 0 V to the drive's signal common at the drive terminals, and land shields there too.
- Prove it in stages. Command 10% and check direction and ramp smoothness; then command 100% and check both numbers: terminal voltage within 0.1 V of full scale, display at target and about 24000 rpm at the spindle.
Keeping the reference honest inside the enclosure
- One common, one bond. A second bond between computer ground and drive common forms a loop, and drive switching current in that loop shows up as voltage on the reference. Bond once, at the drive terminals; the computer-ground offset case is worked through in the PLC 0 V floating article.
- Filter PWM before the drive. A resistor-capacitor low-pass or a DIN-rail conditioner turns PWM into its average voltage; pick a conditioner whose supply lets its output reach the drive's documented full scale, not a 5 V rail's worth. The noisy-input case and its fix are in the DIN rail signal conditioner article.
- Separate the runs. Keep the reference pair 100 mm or more from the drive's output cable, or give it its own duct (rule of thumb), crossing any unavoidable meeting at right angles. Land the cable shield at one end on the panel ground plate.
- Give the analog section a layout. Group the conditioner and its terminals away from the drive's line and output power; the analog signal conditioning layout guide carries the spacing.
- Plan the entry. Put the low-voltage control gland on a different face from the line and motor glands; the cutout designer lays out and spaces every hole before the box is cut.
When the speed still stops short, and when to re-specify the box
If the meter reads full scale within 0.1 V at maximum command and the display still stops short, the mapping inside the drive is at fault. Re-read the maximum-frequency setting and the input range or gain parameters against the drive's documentation, one change at a time, recording each starting value first. A speed that ignores a proven full-scale reference often means the drive is reading a current-loop input — the 20 mA terminal on these strips — instead of the voltage terminal.
Re-specify the enclosure when the fix adds hardware. A conditioner, a filter and their terminals want about 20% spare DIN rail and wire duct space (rule of thumb for growth), and the extra parts raise the heat the box must shed; the VFD enclosure sizing and cooling guide carries the clearances and the heat budget. Where washdown water or conductive dust reaches the panel, move the drive into a stainless box rated NEMA 4X / IP66 by the manufacturer; not UL listed. NEMA does not test or certify enclosures — the manufacturer's rating, the gaskets and the cutouts you specify decide what the finished panel survives.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 60 × 36 × 16 in | 304 stainless | 60 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 48 × 36 × 16 in | 304 stainless | 48 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 60 × 36 × 12 in | 304 stainless | 60 x 36 x 12 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 6 × 6 × 4 in | 304 stainless | 6 x 6 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
My drive runs 400 Hz from the keypad but stops at 327 Hz on the external command. Is the drive faulty?
Usually not. The keypad run to target proves the drive, motor and frequency ceiling; the shortfall lives in the command path. 327 ÷ 400 is 81.75%, so a 0-10 V input is receiving about 8.2 V at maximum command. Measure at the input terminal against the drive common: if the meter reads about 8 V, fix the signal source or rescale the input; if it reads full scale and the speed still stops short, the drive's input scaling is next.
Can a 5 V command run a drive input scaled for a full scale of 10 V?
Yes, but only to half speed: 5 V is 50% of it, which is 200 Hz on this drive and 12000 rpm on a 2-pole spindle. A filtered PWM's average equals duty cycle times high level, so a 5 V chain tops out at 5 V by physics, whatever the software commands. Put the source on a 5 V-capable input or a gain setting that maps the delivered maximum to top speed.
How much speed does a dirty or offset signal common cost?
Measure it, then convert it. A 0.2 V offset on full scale is 2%, which is 8 Hz at this ceiling (400 × 0.02) and about 480 rpm on a 2-pole spindle (60 rpm per Hz). Offsets that size come from two bonded commons, a shared return conductor or a computer ground offset. Bond the controller 0 V and the drive signal common at one point inside the enclosure.
Does cable length between controller and drive weaken the 0-10v signal?
Very little, when the pair is twisted or shielded. 22 AWG copper is about 16.5 Ω per 1000 ft, so a 20 ft round trip is 0.33 Ω; a full-scale input of 10 kΩ draws 1 mA, and that loop drops about 0.33 mV. Length hurts through noise instead: keep the reference pair out of the motor-cable duct, cross the motor cable at right angles, and land the shield at one end.