Short answer: put a branch breaker on each input. Looping the soft starter off the VFD's L1, L2 and L3 leaves one protective device ahead of both. An internal fault in the starter then trips that device and takes the VFD down with it. The loop also forces two 75 mm² conductors under each VFD terminal, while the example drive's power terminals are designed for one conductor up to 120 mm². Break the loop at a distribution block, feed each device through its own breaker, land one conductor per terminal, and torque each lug to the manual value for that exact configuration.
Why the loop drops both drives
With no breaker between the feed and either device, the starter's internal fault has one exit: the upstream breaker. That device trips, and both drives lose power at once. A VFD fault does the same to the starter in reverse. In any series chain the smallest protective device clears first, and here there is only one device, so it clears everything.
The loop has a second cost. The starter's running current — about 160 A for the example 90 kW, 400 V motor — flows through the VFD's input terminals every time the starter runs, even with the VFD idle. Those terminals were sized for one drive's own conductor. Using them as a junction adds heating and loosening cycles at the component you can least afford to cook.
Two ways to feed the pair
This is the one-breaker-per-drive pattern used when two servo drives share an enclosure, and the choice comes down to how the panel is fed.
| Arrangement | Wiring | What a starter fault does |
|---|---|---|
| Two feeder breakers | One breaker and one cable set per device, from the source | Trips the starter's breaker only; the VFD keeps running |
| One feeder, two branch breakers | 400 A incoming breaker with a short-time band; 200 A current-limiting branches | Branch clears in under half a cycle (under 8 ms at 60 Hz); the upstream holds |
| Looped feed, no branch device | Starter fed off the VFD input terminals | Upstream breaker trips; both drives drop |
Two feeder breakers is the build to choose when you can reach the source: nothing to coordinate. One feeder with branch breakers fits an existing panel. Give the incoming breaker a short-time trip band and no instantaneous pickup; the current-limiting branch breaker then clears a branch fault before the band expires. Judge a trip by current × time, never by clearing time alone — arc damage scales with fault current times duration. When upstream and downstream trips fight each other, selectivity failure between upstream and downstream breakers walks the curve check step by step. Splitting one incoming feed among devices is its own topic too: one power input for multiple devices inside an enclosure covers the distribution side.
Worked example: the pair on 400 V
Assume a 90 kW drive and a 90 kW soft starter on 400 V three-phase; replace these inputs with your nameplates before you order anything. Drive input current at full load, with assumed efficiency 0.97 and input power factor 0.95:
I = 90,000 W ÷ (1.732 × 400 V × 0.97 × 0.95) = 90,000 ÷ 638.4 = 141 A
Drive nameplates for this frame commonly read 160-180 A, because harmonics raise the true RMS input current, so select on 170 A. The starter's branch carries the motor: the same 90 kW motor at power factor 0.86 and efficiency 0.95 draws 90,000 ÷ (1.732 × 400 × 0.86 × 0.95) = 159 A. With both running, the feeder sees about 330 A.
That sets the devices: 200 A branch frames, above the 170 A nameplate and below each manual's stated maximum, and a 400 A incoming breaker with 70 A of headroom over 330 A. The conductor is the catch. Ampacity tables that list 75 mm² copper put it near 200-300 A depending on installation method, short of 330 A by 10-40 %. Interlock the pair and size for one branch, or re-feed with about 120-150 mm² of copper per phase.
Two 75 mm² conductors under one terminal
In the example panel each VFD power terminal is built for one conductor of up to 120 mm², at a torque the installation manual prints next to that size. Two 75 mm² conductors may fit under the screw, and a terminal that swallows them is still a one-conductor, one-torque terminal. The clamp pressure lands unevenly, the thermal cycling of a 170 A input works one conductor loose, and the loose joint runs hot. Halving the printed torque for two cables invents a value nobody tested.
So: one conductor per terminal, torqued to the printed value with a calibrated tool. A few drive manuals do permit two conductors per phase and print a torque for that exact pair; then the pair value applies. When a feed genuinely needs parallel conductors, each one lands on its own lug of a distribution block rated for the size.
What you need
- The drive and soft starter manuals: conductors per terminal, maximum size, torque, maximum breaker.
- The panel schematic, for marking up as you trace.
- Two 200 A branch breakers or MCCBs and a 400 A incoming breaker with a short-time band; the manuals' tables set the exact frames.
- A distribution block or busbar lug kit rated for the feeder conductor, one lug per conductor.
- A calibrated torque tool and the lugs the manuals call for.
- Plate space: a branch frame that size is a hand-width device, and each 75 mm² tail needs 2.5 in [64 mm] of bending space at its terminals — the 1/0-4/0 AWG row of NEC Table 312.6(A), which applies where the conductor leaves the same wall as its terminal. The DIN rail and backplate layout guide carries the spacing and duct fill rules.
- Labels for both branches and the block.
Steps to split the feed
- Lock out the feeder and verify absence of voltage before the first lug comes off; at 400 V, meter first, then gloves, then tools.
- Trace the loop and mark what actually protects the feed today; correct the schematic to match the wiring you find.
- Set the operating rule. If both devices can run together, size the feeder for the 330 A sum; if never, wire the interlock through the starters' control terminals and size for one branch.
- Move the incoming conductors off the VFD terminals and onto the distribution block, one conductor per lug.
- Mount the two branch breakers beside the block and run block, breaker, device in line, keeping 2.5 in [64 mm] of bending space at every terminal. The branch breaker also has to ride through the drive's capacitor-charging inrush — servo drive breaker sizing in a cabinet shows that arithmetic.
- Land one 75 mm² conductor per device terminal and torque each to its manual value; mark every lug after torquing.
- Lay the branch and upstream time-current curves over each other: the branch curve must sit below and left of the 400 A short-time curve across the fault range.
- Label both branches and the block, and update the schematic.
Checks before you close the door
- Open the starter's branch breaker: the starter drops and the VFD stays up. Open the VFD's breaker: the reverse. Two switch operations prove the separation works.
- If the starter already failed shorted, it is a replacement, not a repair: shorted SCRs do not come back after an insulation test.
- Count conductors at every power terminal in the panel; the count is one.
- Check the torque marks and the record of values used.
- Run both devices and scan the block and lugs after the first hour; a bad joint at 170 A shows up as a hot spot.
Mistakes that undo the protection
- Sizing the feeder for one branch while the interlock stays a promise: an independent second start puts 330 A on a conductor sized for 170 A.
- Raising the upstream instantaneous pickup to stop nuisance trips, which kills the coordination you just built; keep the short-time band and the current-limiting branch pair.
- Reusing the loop because the cables fit; the fit was never the rating.
- Torquing from memory or scaling another terminal's value; each configuration carries its own printed number.
When the box needs to change
If the plate cannot take two branch frames plus their bending space, change the box rather than the wiring rules; a deeper custom stainless enclosure keeps the layout in one piece, built to your dimensions and cutouts. Watch the heat budget too: two drives of this size in one box is mostly the VFD's load, about 2 kW at rated output (roughly 2 % of rating by typical drive efficiency figures), and cooling a VFD enclosure carries the sizing math for that heat.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 60 × 36 × 16 in | 304 stainless | 60 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 48 × 36 × 16 in | 304 stainless | 48 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 60 × 36 × 12 in | 304 stainless | 60 x 36 x 12 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 6 × 6 × 4 in | 304 stainless | 6 x 6 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Does a soft starter short circuit trip the VFD too?
Yes, when both hang off the loop: the only breaker in the chain sits upstream of the pair, so the starter's fault clears there and the VFD loses its supply with it. One branch breaker per device ends this — the fault clears in its own branch and the VFD keeps running. A starter that already failed shorted gets replaced; shorted SCRs do not return to service after an insulation test.
Does the tightening torque change when two cables share one terminal?
The manual's torque covers the permitted configuration only: one conductor up to 120 mm² in the example drive's power terminals. Two 75 mm² conductors sit outside that configuration, so no documented torque applies to them; halving the single-conductor value invents a number nobody tested. Land each conductor on its own lug of a distribution block rated for the size. A few manuals do permit two conductors per phase and print a pair torque — then that exact value applies.
Can the VFD and soft starter run together on one 75 mm² feeder?
Only with the feeder sized for the sum: about 330 A of nameplate current in the example (170 A drive input, 160 A motor). Ampacity tables that list 75 mm² copper put it near 200-300 A depending on installation method, so both at once needs roughly 120-150 mm² of copper per phase or two separate feeders. If the process never runs them together, wire the interlock and size the feeder for one branch.
Where do the two branch breakers sit inside the enclosure?
On the mounting plate beside the incoming terminals, each fed by its own 75 mm² tail. NEC Table 312.6(A) gives the 1/0-4/0 AWG row — where 75 mm² falls — 2.5 in [64 mm] of bending space per terminal. A branch frame that size is a hand-width device, so leave a duct run beside each. The breakers add a few watts; the drive's roughly 2 kW dominates the cooling budget.