Short answer: mount the drive and the PLC in one cabinet with 8 in [200 mm] between the drive's control terminals and the nearest PLC module, run shielded control wiring at least 4 in [100 mm] from the drive's power conductors, hold unshielded analog 12 in [300 mm] away, cross the families at 90 degrees, and clamp every shield 360 degrees at the cabinet entry. A 5 hp drive switching at 4 kHz puts fast edges on its output cable, and anything running parallel to it picks those edges up as noise. The braid on the motor cable exists to carry that noise back to the drive; the layout below keeps the rest of the wiring out of its reach, and the checks at the end prove it before the panel ships.
What you need
- The drive's installation sheet: terminal torque, internal clearances and allowed ambient.
- A to-scale plate sketch, split into a power zone and a control zone.
- Shielded twisted-pair cable, braid plus foil, for every PLC-to-drive run; the page on selecting shielded twisted-pair cable for VFD control wiring compares the constructions.
- Metal glands matched to each cable's outside diameter, plus shield clamps that grip the braid all round.
- One wiring-duct run per zone, sized so fill stays at or below 50% of the interior cross-section, the ceiling NFPA 79's fill tables use.
- DIN rail, end brackets and a bonding strap for the mounting plate.
Lay the plate out, step by step
- Draw the plate to scale and split it: power zone on the gland side of the motor cable, control zone on the far side. In most cabinets that means the drive low and left, the PLC high and right.
- Mount the drive so its control terminals sit at least 8 in [200 mm] from the nearest PLC module or I/O terminal. That device gap makes the wiring distances reachable; no routing trick replaces it.
- Put the PLC, its I/O and the 24 V DC supply on DIN rail over their own duct run in the control zone. Line reactors, filters and braking resistors stay with the drive in the power zone; the backplate and DIN rail layout guide carries rail spacing and duct stacking.
- Set the entries on opposite walls: motor-cable gland in the bottom wall under the drive, control-cable glands in the top wall over the PLC. Opposite walls buy more distance than any single-wall arrangement can.
- Run one duct through each zone, at least 4 in [100 mm] apart where they run parallel, and hold fill at or below 50% of the interior cross-section. NFPA 79 caps its fill tables at 50% because round cables leave air gaps nobody can close.
- Bond the mounting plate and the drive's PE terminal to the enclosure ground. NEC 250.12 requires paint and coatings removed from threads and contact surfaces at grounding connections, so scrape the plate under every bond.
- Read the drive's installation sheet before fixing the plate: where the maker asks for more clearance, the maker's number wins.
Route the wiring
Power side first. Line conductors and drive output stay in the power duct, with the three motor conductors together in one shielded cable; splitting U, V and W into separate paths lets each couple into the cabinet on its own geometry. Clamp the motor cable's braid 360 degrees at the entry and again at the drive; the shielded VFD motor cable grounding at the enclosure entry and VFD shield clamp at the drive or the cabinet entry articles show both clamps.
Control side second. Every PLC-to-drive run goes in shielded twisted pair, held at least 4 in [100 mm] from the drive's power conductors in parallel. A drive maker's wiring application note asks for 1 in [25 mm] between cables that must run parallel, so 4 in carries margin on shielded 24 V runs. Unshielded analog needs more: hold a bare 4-20 mA or 0-10 V run 12 in [300 mm] from the drive output, the documented figure for drive output against analog signals in parallel runs.
Cross at 90 degrees where the families meet, and keep each crossing short: one square crossing replaces 14 in of side-by-side run, and coupling falls with parallel length. If the PLC commands the drive through relay outputs, fit the coil suppressor at the relay so switching surges stay off the drive's input terminals; with transistor outputs, follow the diode arrangement in the drive's manual on the PLC supply side.
Ground the shields where they enter
Clamp the PLC-to-drive control cable's braid 360 degrees to the entry plate and land it at that one end; the VFD control cable shield grounding article explains the single-end rule. Analog shields differ: bond each once, on a shield bus beside the PLC, as the shielded analog cable to a PLC input article lays out. Plate, drive PE and gland plates all land on the enclosure ground; the grounding and bonding guide shows the fault path that bond provides. Metal walls help too — the twisted pair inside a metal enclosure article covers when the cabinet's steel adds shielding.
A worked layout, with the arithmetic
Take a 24 x 20 x 10 in [600 x 500 x 250 mm] wall-mount cabinet with a full-width plate; the size is an example, ordered to your drawing. Across the 24 in width: a 10 in power zone, the device gap, a 6 in control zone — 10 + 8 + 6 = 24, so the drive's control terminals face the PLC rail across open plate. The 20 in height stacks both duct runs, the PLC rail and the terminals with room for ferrules.
Duct fill check on the control run: a 1 x 2 in interior duct offers 2.0 sq in, so the NFPA 79 ceiling of 50% is 1.0 sq in. Shielded twisted pair at 0.25 in [6 mm] outside diameter occupies 3.14 x (0.125 in) x (0.125 in) = 0.05 sq in. Eighteen cables take 18 x 0.05 = 0.9 sq in, which is 90% of the ceiling; cable nineteen means a second duct.
Getting it wrong has a price: the same 4-20 mA input that sits quiet at standstill wanders tenths of a milliamp with the drive at speed once its cable shares duct with the drive output, and a level loop starts to hunt.
Checks before you close the door
Lock out the panel and verify absence of voltage before pulling clamps or metering bonds. Then:
- Measure the finished plate against the sketch: the device gap, the parallel separations and the crossings where you drew them.
- Meter every shield clamp from braid to mounting plate; a clamp that reads open was never made.
- Run the drive from zero to full speed with the PLC watching its analog input. A healthy 4-20 mA input moves less than 0.1 mA, about 0.6% of span, with the drive at speed; more movement means a parallel run you missed.
- Toggle every PLC output to the drive while it runs. A command that flips only with the drive on is coupling; reroute that run instead of reaching for ferrites.
- Check the air beside the drive's heatsink under load at or below 40 C (104 F) unless its datasheet allows more; the enclosure size for a drive, power supply and wiring article carries the heat-load arithmetic when the number comes back high.
Mistakes that bring the noise back
- A drain wire landed on a long pigtail instead of the clamp: grip the braid itself, full circle.
- An analog shield bonded at both ends of its run: bond it once, at the PLC bus.
- One duct serving both zones across the boundary: add a metal divider or the second duct at the split.
- A relay coil driving a drive input with its suppressor missing: fit the suppressor at the relay.
- Motor cable leaving through the control-side gland because it was nearer: bring it back to the bottom wall under the drive.
What to put on the order
Order the cabinet around the layout, depth first: drive body plus 2 in [50 mm] for duct and cable bends. The worked 24 x 20 x 10 in example sits inside the stainless wall-mount line, which runs from 6 x 4 x 4 in up to 60 x 36 x 16 in (H x W x D). Put cutouts on the drawing — motor glands in the bottom wall, control glands in the top wall, positions from your sketch; the cutouts, glands and HMI windows guide lists what to dimension. Choose 304 stainless for indoor washdown and most outdoor sites, 316L for salt air, brine and chlorides: the stainless wall-mount enclosures page shows both grades, and the custom enclosure builder takes your width, height, depth and every cutout as a one-piece build, delivered in 10 business days from drawing approval. The boxes are rated NEMA 4X / IP66 by the manufacturer; not UL listed — and steel walls add shielding plastic cannot.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 24 × 20 × 10 in | 304 stainless | 24 x 20 x 10 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 60 × 36 × 16 in | 304 stainless | 60 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 48 × 36 × 16 in | 304 stainless | 48 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 60 × 36 × 12 in | 304 stainless | 60 x 36 x 12 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Can drive power wiring and control wiring share a duct?
Run them separately. Drive output conductors couple switching edges into anything beside them, so give the power side its own duct and hold each duct's fill at or below 50% of its interior cross-section, the ceiling NFPA 79's fill tables use. Where the families must cross, one 90-degree crossing beats inches of parallel run.
Where does the shield of the PLC-to-VFD control cable land?
Clamp the braid full-circle to the cabinet entry plate and bond it at that one end. A drain wire left on a several-inch pigtail defeats the braid at switching frequency, and analog signal shields belong once, on a single-point bus at the PLC, rather than bonded at both ends of the run.
What enclosure size fits a PLC and a 5 hp VFD together?
The worked layout fits a 24 x 20 x 10 in wall-mount cabinet: a 10 in power zone, the device gap and a 6 in control zone across a full-width 24 in plate. Allow drive body depth plus 2 in for duct and bends, and put the gland cutouts on the drawing.