Specify a small display enclosure around the complete display assembly, its power arrangement and its cable routes—not just the visible screen. Ask for an empty enclosure with only the openings and mounting features your equipment needs. A purpose-built box avoids unused connectors, but you still need to define electrical protection, heat removal and sealing. The checks below turn those requirements into a buildable drawing and quote request.
Define the exposed environment
Start with where the enclosure will operate. A desktop display in a clean room needs a different enclosure from one beside a washdown machine.
- Water: Identify whether exposure means occasional splashes, outdoor rain or hose-directed cleaning. Record whether the front, rear and cable entries receive water.
- Dust: Describe airborne dust and whether it can accumulate around the display bezel or cable connections.
- Chemicals: Identify cleaning agents, concentrations and operating temperatures. Stainless steel selection alone does not establish gasket or display compatibility.
- Temperature: State the lowest and highest surrounding air temperatures. Include nearby machinery, direct sunlight and enclosed mounting spaces.
- Rating: Specify the enclosure type required by the installation, rather than using “waterproof” as the entire requirement.
NEMA Type 1 can suit general-purpose indoor protection; it does not establish water protection. Type 12 addresses indoor dust, dirt and dripping liquids. Type 4 addresses hose-directed water, while Type 4X adds corrosion resistance. Our enclosure ratings are manufacturer ratings for the specified design; the enclosures are not UL listed.
For the custom enclosure body, 304 stainless steel suits many indoor washdown applications. Consider 316L where salt air, brine or chlorides are present. Confirm compatibility with the actual exposure rather than treating either grade as universally resistant.
The exposed display face, gasket, entries and enclosure must work together. A sealed box cannot compensate for an unsealed display module.
Measure the complete display assembly
The number of display lines does not determine the opening or enclosure size. Obtain a dimensioned drawing for the exact module.
- Visible area: Record the viewing area separately from the required panel opening. They are rarely interchangeable dimensions.
- Front outline: Include the bezel, buttons and any protective overlay extending beyond the opening.
- Rear envelope: Include the circuit board, mounting brackets, fasteners and projecting components behind the panel.
- Connector envelope: Measure connectors while mated, including backshells and the cable bend required immediately behind them.
- Panel attachment: Identify mounting-hole positions, permitted panel thickness, corner radii and gasket requirements.
- Service movement: Allow room to disconnect plugs and remove the display without dismantling unrelated equipment.
For example, a hypothetical module projecting 1.5 in [38 mm] behind the front panel needs more than that much internal depth. The connector, cable bend and any rear mounting hardware still need space. External enclosure depth is not the same as usable internal depth.
Use the display module enclosure fit checks to verify the complete assembly before fixing the outer dimensions. Do not release a cutout based only on a photograph or screen diagonal.
Choose the power arrangement
Decide whether the power supply belongs inside the enclosure. An external approved supply can keep mains wiring and supply losses outside a small display box. It still requires a correctly sized low-voltage entry and suitable installation conditions.
- Display demand: Record operating voltage, maximum current and any separate backlight supply requirement. Include startup demand when the documentation specifies it.
- Supply selection: Match the output voltage, capacity, ambient-temperature limits and installation instructions to the display.
- Internal supply space: Include its mounting envelope, terminal access, required clearances and ventilation restrictions.
- Mains protection: Define the supply entry, disconnecting arrangement, overcurrent protection, terminal guarding and separation from low-voltage circuits.
- Metalwork bonding: Provide a protective bonding arrangement where required. Do not assume hinges or incidental mounting contact provide the necessary fault-current path.
A supply intended for installation inside equipment is not automatically safe when left exposed inside a loosely arranged box. Loose conductors, accessible terminals and unsupported connections remain hazards even when the display uses low voltage.
The power supply enclosure safety guidance covers the mains-wiring decisions. Settle those before ordering a compact enclosure around the supply's outline alone.
Plan only the connections you need
Specify each connection by function. Do not add a bank of unused connectors simply because an existing computer case includes them.
- Cable schedule: List power, display data and any control wiring separately. State cable outside diameter and connector dimensions.
- Entry method: Choose between a continuous cable through a gland and an accessible panel-mounted connector. Base the choice on service needs and environmental exposure.
- Preterminated cables: Check whether the connector can pass through the entry during assembly. A gland sized for the cable jacket may not admit its plug.
- Strain relief: Prevent external cable loads from reaching the display board or power terminals. A plain opening does not provide strain relief.
- Entry position: Keep glands, locknuts and connector backs clear of the display brackets, supply and mounting hardware.
- Unused openings: Omit them where possible. Any retained opening needs a closure suitable for the specified environment.
For a controller mounted elsewhere, define cable length and interface requirements before deciding entry positions. The separate display and controller enclosure specification addresses that arrangement without forcing both assemblies into one box.
Use the cutout and gland guide for penetration fundamentals. Confirm the completed assembly's rating rather than assuming every added connector preserves it.
Check heat before choosing depth
A small display can run continuously, and its backlight may dominate the heat load. A sealed enclosure must reject that heat through its surfaces or a suitable cooling system.
- Display load: Obtain maximum electrical consumption for the actual brightness and operating mode.
- Supply losses: Add conversion losses only when the supply is inside. Do not count the supply's entire output again after counting the display load.
- Ambient limit: Use the highest local ambient temperature, not a comfortable room-temperature assumption.
- Component limits: Check the display, supply and other components individually. Apply documented derating where required.
- Air paths: Preserve the supply's required clearances and orientation. Do not remove a required fan to make the enclosure quieter or easier to seal.
- Verification: Plan a temperature check at representative maximum load and ambient conditions, with the enclosure closed.
For a 12 W display powered by an internal supply operating at 85% efficiency, supply loss is approximately 2.1 W. Treating the display input conservatively as heat gives about 14.1 W inside the enclosure, excluding other loads.
That calculation establishes heat generation, not the resulting temperature. Surface area, mounting, material, sunlight and surrounding airflow determine heat rejection. Follow the power supply enclosure cooling checks before assuming a compact sealed box will remain cool enough.
Make mounting and servicing possible
Mounting details can consume the same space needed by the display and its cables. Include them in the layout from the beginning.
- Mounting position: State whether the enclosure attaches to a wall, machine surface or another support. Show the mounting orientation.
- Support capacity: Account for the enclosure, display, supply and cable loads. Define attachment requirements for the actual supporting surface.
- Access: Show which cover or door opens for service and how far it must move. Keep that movement clear of cables and nearby equipment.
- Sealing surfaces: Keep the display gasket land flat, continuous and free from interfering fasteners. Use the display manufacturer's cutout and tightening instructions.
- Internal fastening: Specify attachment points for the display and supply. Avoid improvised fasteners that create unplanned exterior penetrations.
- Assembly inspection: Check deburred openings, secure mounting, cable retention, bonding and gasket seating before energizing.
De-energize and verify absence of voltage before opening for electrical work. A removable cover should not require pulling on live wiring or leaving a heavy display hanging from its cable.
Send a buildable quote request
Send one coordinated package rather than separate sketches with conflicting dimensions. The enclosure drawing should identify what is supplied, what you install and which dimensions control fit.
- Enclosure specification: State material, width, height, depth, orientation and required enclosure type. Identify critical usable internal dimensions separately.
- Component documents: Include the exact display drawing, supply drawing, installation instructions and cable or connector dimensions.
- Cutout drawing: Dimension every opening from identified reference edges. Include tolerances, corner radii, mounting holes and the face receiving each feature.
- Internal layout: Show the display rear envelope, supply, cable bends, terminal access and attachment points.
- Environmental information: Include ambient limits, cleaning exposure, calculated heat load and any required temperature verification.
- Scope: Identify whether the request covers an empty fabricated enclosure, mounting provisions or other explicitly agreed work. Do not assume electrical assembly is included.
- Approval basis: Mark the drawing revision and resolve fit, sealing and mounting questions before approving fabrication.
We build custom enclosures from a quantity of one, with your specified material, dimensions and cutouts. Use the cutout designer to position holes and display openings, check spacing and send the layout with the quote request.
For custom work, delivery is counted from your approval of the drawing: delivered in 10 business days, anywhere in the world. Approve only after the display, power supply and cable envelopes fit together without relying on unplanned field modifications.
Enclosures for this job
Catalog sizes that suit the job this article answers, picked from its subject; open one for its full specifications.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 10.1" HMI enclosure | 304 stainless | 8.72 x 12.66 x 3.48 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
| 15.6" HMI enclosure | 304 stainless | 11.69 x 17.64 x 4.13 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
| 21.5" HMI enclosure | 304 stainless | 14.69 x 23.03 x 3.86 in | IP65-type front seal with the display installed, manufacturer rated; not UL listed |
| 16 × 12 × 8 in | 304 stainless | 16 x 12 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Can I order a small display enclosure without extra connectors?
Yes. Specify the enclosure as an empty fabricated box with only the openings and mounting provisions your display requires. Include the display drawing and cable schedule so the quote does not assume extra connectors, interface hardware or electrical assembly.
Should the display power supply be inside the enclosure?
An external supply can reduce internal heat and keep mains wiring outside the display enclosure. An internal supply may simplify the external installation, but it needs mounting space, electrical protection, access and a thermal check. Choose using the installation conditions and the supply manufacturer's instructions.
Does a sealed enclosure make an ordinary display suitable for washdown?
No. A panel opening exposes the assembly through the display, its gasket and its mounting interface. The display must be suitable for the exposure, and the cutout must follow its installation requirements. Confirm the rating of the completed arrangement rather than relying on the empty enclosure alone.
How do I determine the enclosure depth?
Measure the complete display behind the front panel, including mated connectors, cable bends and mounting hardware. Add the space needed for the supply, its required clearances and service access. Compare that layout with usable internal depth, not only the enclosure's external dimension.





