Short answer: at 30 m the cable is electrically free — 24 AWG copper drops about 0.10 V at 20 mA against a 24 V loop supply, a sliver of the roughly 10 V of headroom a two-wire transmitter wants. Size the cross section on mechanics instead: pull strength along the route, grip in the screw terminals, and construction that shrugs off a wet plant. This article runs the voltage budget for a 30 m pressure transmitter feeding a 100 Ω panel input, compares the gauges on an instrument catalog page, and settles the order: 18 AWG shielded twisted pair to BS EN 50288-7, the drain grounded at the panel end, glanded into a stainless wall-mount box.
How much voltage does the loop lose in the cable?
Over that route, a pair of 24 AWG copper adds about 5.05 Ω round trip, so at 20 mA the cable eats under half a percent of a 24 V supply; the transmitter's minimum voltage, the receiver burden and the supply set the budget, and the cable barely moves it.
A two-wire transmitter regulates the loop current itself and powers its electronics from whatever voltage remains across its terminals. Both cable legs, the receiver burden and any series device subtract from the supply before that remainder. The loop holds full scale as long as the leftover stays above the transmitter's minimum.
As one budget line:
V_supply ≥ V_transmitter_min + 0.020 A × (R_cable_loop + R_receiver) + other series drops
Loop supplies commonly run 24 V DC, with 9 and 12 V on lighter loops. A 100 Ω analog input is a typical receiver burden. Practice puts a two-wire transmitter's minimum between 10 and 14 V, so 12 V is the planning figure.
Worked example, with the route at 30 m, a 24 V supply and a 100 Ω input, on 24 AWG at 84.2 Ω/km (solid copper, 20 °C):
- Loop resistance: 84.2 Ω/km × 0.060 km = 5.05 Ω
- Cable drop at full scale: 5.05 Ω × 0.020 A = 0.10 V
- Receiver drop: 100 Ω × 0.020 A = 2.00 V
- Left at the transmitter terminals: 24 V − 2.00 V − 0.10 V = 21.9 V
- Voltage margin: 9.9 V
Faults barely move the verdict. Transmitters signalling above range — about 21 mA under the common NAMUR fault convention — lift every drop by 5 %, to 0.106 V on the cable.
Which wire gauge passes the voltage budget?
Every gauge on an instrument catalog page passes over that route: the drop runs from 0.10 V on 24 AWG down to about 0.022 V on 1.0 mm², each leaving the transmitter around 22 V against the planning minimum.
| Conductor | Resistance basis | Round trip over the route | Drop at 20 mA | Left for the transmitter |
|---|---|---|---|---|
| 24 AWG | 84.2 Ω/km, solid copper, 20 °C | 5.05 Ω | 0.10 V | 21.9 V |
| 22 AWG | about 54 Ω/km, solid copper | 3.24 Ω | 0.065 V | 21.9 V |
| 18 AWG | 20.9 Ω/km, solid copper, 20 °C | 1.25 Ω | 0.025 V | 22.0 V |
| 1.0 mm² | 18.1 Ω/km, IEC 60228 maximum | 1.09 Ω | 0.022 V | 22.0 V |
The receiver takes 2.00 V in every row and the supply is 24 V. Stranded conductors measure a few percent above the solid values; at these drops that is invisible. Order against the cable datasheet's maximum DC resistance rather than a bare-copper table, because screen and insulation families differ between catalog pages.
Why do panel builders still pick the heavier gauge?
Because the electrical pass says nothing about the next thirty years: the heavier copper survives a full draw-in, holds its strands under screw-terminal torque, and takes the handling that frays smaller gauges — so the robustness costs nothing here.
Pulling a small pair through conduit or over tray loads the conductors, and fine strands stretch or snap at the lug. Heavier copper carries that pull, then holds up through maintenance re-torques and the vibration a water plant hands out. A 20 mA signal sits orders of magnitude below power ampacity, so the grouping factors and temperature corrections in power-cable sizing — the NEC ampacity tables and their IEC counterparts — never enter this choice.
Standardizing beats optimizing. One instrument cable size across the plant means one spare drum, one ferrule, and identical terminations on every loop. The budget re-enters only on long routes: over 1 km one-way, 24 AWG drops about 3.37 V (168.4 Ω × 0.020 A), still comfortable, and it takes multi-kilometre runs with heavy burdens before resistance decides the gauge.
What cable construction suits a wet treatment plant?
Order shielded twisted pair specified for instrumentation — BS EN 50288-7, the sectional specification for multi-element metallic cables in analogue and digital communication and control, is the citation most water-plant cable schedules use — and treat moisture, not resistance, as the enemy.
The twist does the magnetic work: alternating lay flips the polarity of pickup from neighbouring conductors and cancels most of it. The overall screen intercepts electric-field coupling and carries it away through the drain wire, which is why the drain's grounding matters as much as its existence.
Humidity, hosing and below-grade ducts decide the rest of the construction. Pick insulation and sheath rated for wet locations, and for routes through sumps or buried duct, for a wet installation class. Keep the pair separated from power cables the whole way — the instrument signal cable layout and separation article gives the spacings — and put any mid-route terminal point in its own sealed box, as the instrument junction box selection article covers.
The landing box follows the washdown chemistry: 304 stainless for routine washdown, 316L where chlorine sanitizers or brine are in play.
Where does the shield drain land?
Land the drain at one end only — the panel end, on the signal or instrument ground — and insulate the screen at the transmitter end; grounding both ends invites ground-potential differences to drive current through the screen.
Single-end grounding keeps the screen from becoming a conductor between two earths. Bond the drain at the enclosure's ground stud or the instrument ground bus on the loop-supply side, tape the field end back so it cannot touch the gland or the wall, and keep the screen clear of gland bodies as the pair passes through. Where a drive shares the panel, run the control signal ground loop checks for a cabinet before closing the door, because induced currents can mimic a noisy transmitter. The shielded twisted-pair cable practice for analog signal wiring, including drain handling, is laid out on this knowledgebase page.
How should the pair enter the enclosure?
Bring the pair through a cable gland matched to its outside diameter, in a cutout made at the factory, so the box keeps the rating it leaves with: ours are rated NEMA 4X / IP66 by the manufacturer; not UL listed.
A two-core screened pair at that gauge typically runs 6-8 mm across, which is M16 gland territory. Take the outside diameter from the cable datasheet and pick a gland whose clamping range covers it, so the seal grips the sheath and the strain relief carries the pull. Factory-made cutouts keep that seal honest; the cutouts, glands and HMI windows guide covers sizing, placement and the field-drilled exceptions. What the Type 4X and IP66 marks actually test sits in the NEMA 4 vs 4X vs IP66 guide, including why a US inspection wants the Type number and not only the IP code.
One boundary matters in a treatment plant: NEMA 4X / IP66 is a jet-and-splash rating. A box that can stand in water — a pit, a valve chamber, a sump wall — goes to a custom design review with the depth, duration and fluid named, because temporary immersion sits at Type 6 (nearest IP67: 1 m for 30 min) and prolonged submersion at Type 6P.
What goes on the order?
Put three lines on the order: 18 AWG (about 0.82 mm²) shielded twisted pair built to BS EN 50288-7, glands sized to the cable's outside diameter, and a 10 x 8 x 6 in stainless wall-mount box for the landing panel — 316L where chlorine or brine washes down, 304 for routine washdown.
For the terminal blocks and segregation on the landing plate, the backplate and DIN rail layout guide sets the spacing; mid-route pull points use the same family, where the stainless junction-box sizes start at 6 x 4 x 4 in.
| Order line | Pick | Basis |
|---|---|---|
| Cable | 2-core STP, 0.82 mm², overall screen + drain, BS EN 50288-7 | 0.025 V drop over the route; pull and terminal strength; wet-route construction |
| Glands | M16 class, clamping range covering the cable OD (6-8 mm typical) | holds the NEMA 4X / IP66 seal at each entry |
| Landing box | 10 x 8 x 6 in wall-mount stainless | 9.91 x 7.91 x 5.91 in inside fits terminal blocks and two gland entries |
That box is the 10 x 8 x 6 in 316L wall-mount enclosure for chlorinated washdown, or the 304 twin otherwise. Orders run through the Industrial Monitor Direct checkout, which builds, ships and supports every box; delivery is 10 business days, counted from your order (custom work: from drawing approval).
Decisions by site:
- Dry panel room, runs under 100 m: 22 or 24 AWG STP passes with 21.7 V or more at the transmitter; standardize plant-wide on one size.
- Wet plant route at 30 m with screw terminals: the heavier STP to BS EN 50288-7, drain at the panel end.
- Chlorine or brine washdown: same cable, 316L landing box.
- Standing water anywhere on the route: custom design review; jet-rated boxes stay out of pits.
Enclosures in this article
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 10 × 8 × 6 in | 316L stainless | 10 x 8 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 10 × 8 × 6 in | 304 stainless | 10 x 8 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Can 24 AWG carry a 4-20 mA signal over 100 m?
Yes. A 100 m route is 200 m of conductor; at 84.2 Ω/km that is 16.8 Ω, dropping 0.34 V at 20 mA. With a 24 V supply and a 100 Ω receiver, the transmitter still sees about 21.7 V against a 12 V planning minimum.
Which end of the shield drain gets grounded?
The panel end, on the signal or instrument ground; leave the transmitter-end screen cut back and insulated. One-end grounding keeps ground-potential differences out of the screen. A screen bonded at both earths becomes a conductor between them, and near large drives the currents it picks up swamp a 20 mA signal.
What is the heavier instrument gauge in square millimetres?
18 AWG is about 0.82 mm², which metric schedules list as 0.75 or 1.0 mm². IEC 60228 gives 1.0 mm² copper a maximum resistance of 18.1 Ω/km, so a 30 m route drops about 0.022 V at 20 mA — the same verdict as the heavier gauge.
Is a NEMA 4X box suitable where water stands?
No. Temporary immersion is Type 6 territory (nearest IP67: 1 m for 30 min) and prolonged submersion is Type 6P (nearest IP68). Boxes rated NEMA 4X / IP66 handle jets and splashes, not standing water, so a flood-prone pit needs a custom design review with depth, duration and fluid named.