Side-by-side enclosures of different depths: clearance rules

Nothing in the NEC requires side-by-side enclosures to line up flush. Working space is measured from each enclosure's own face: 3 ft [900 mm] of clear depth for equipment at 600 V or less to ground in Condition 1, a 30 in wide or equipment-width band, 6.5 ft of headroom and a 90 degree door swing. A 12 in deep panel beside a 4 in deep disconnect passes as built.

NEMA4 Enclosure engineering team · Published November 24, 2026 · 7 min read

Short answer: nothing in the NEC makes side-by-side enclosures match depths. NEC 110.26(A) measures a clear working space from each enclosure's own face. The numbers: 3 ft [900 mm] of clear depth for equipment at 600 V or less to ground in Condition 1, 30 in [762 mm] of width or the equipment width, 6.5 ft [2.0 m] of height, and a 90 degree door swing. A 12 in [300 mm] deep control panel beside a 4 in [100 mm] deep disconnect meets every one of those numbers as built, and no clause asks the faces to line up.

If your client or the job spec wants aligned faces anyway, build them. Flush is also compliant, and standoffs or a deeper box close the gap without moving a single clearance. The sections below give the table values, the arithmetic for a real two-box wall, and the extra checks a ceiling mount adds.

What the NEC asks for, and what it leaves out

The working-space rules exist so a qualified person can stand in front of a live panel and reach the parts. NEC 110.26(A) requires a clear space in front of equipment likely to be examined, adjusted, serviced or maintained while energized. The article fixes four numbers: the depth of that space, its width, its height and the door swing. Depth depends on voltage and conditions, and the table in the next section carries the values. Width is the greater of 30 in and the equipment's own width. Height is at least 6.5 ft [2.0 m] or the height of the equipment. Doors and hinged panels must open at least 90 degrees.

What the NEC leaves out is any sentence tying adjacent enclosures together. There is no flush-face requirement, no equal-depth requirement, and no projection limit for boxes hung side by side on one wall. Each enclosure owns its own working space, measured from its own face, and the box next door counts only if something stands in front of it. The space also has to stay clear of stored material and pipe runs. The pipe-below-the-panel case gets its own treatment in the working-space obstruction article.

One safety note: the 3 ft of clear depth is what lets a qualified person work a panel live. For the work itself, lock out and test for absence of voltage before the door comes open.

Depth comes from the table, and the datum is the face in front of you

Voltage to ground Condition 1 Condition 2 Condition 3
0-150 V 3 ft [900 mm] 3 ft 3 ft
151-600 V 3 ft 3 ft 6 in [1.0 m] 4 ft [1.2 m]

Those are the Table 110.26(A)(1) depths, and the conditions decide which column you read. Condition 1 is live parts on one side of the space only, or live parts on both sides guarded by insulating material. Condition 2 is live parts on one side and grounded construction such as concrete, brick or tile on the other. Condition 3 is exposed live parts on both sides. A control panel with a dead front, insulated barriers and a closed gasketed door is Condition 1 at any voltage up to 600 V. For nearly every panel on a plant wall, 3 ft is the working number. Above 600 V the depths grow again.

The datum matters as much as the number. Depth is measured from the face of the enclosure you are working on. A 12 in deep panel therefore asks for 44 in from the wall, because 12 in of box sits behind the face. A 4 in deep disconnect asks for 40 in. The deeper neighbor changes neither figure, because the measurement never starts at the deepest box on the wall. For the design-side version of these numbers, the enclosure sizing guide carries the same 110.26(A) values next to box selection.

The arithmetic for a 24 x 20 x 8 in panel beside a 10 x 8 x 4 in disconnect

This is the wall the flush-face argument usually lands on: a deeper control panel, a shallower disconnect, both fixed to the same wall plane. The inputs:

  • Control panel: 24 x 20 x 8 in (H x W x D), 304 stainless, manufacturer-rated NEMA 4X / IP66; not UL listed. Its face sits 8 in off the wall.
  • Disconnect: 10 x 8 x 4 in (H x W x D), 304 stainless, face 4 in off the wall, so 4 in behind the panel's face.
  • Supply: 480Y/277 V, so 277 V to ground. The dead front and closed door give Condition 1, and Table 110.26(A)(1) gives 3 ft [900 mm] of clear depth, which is 36 in.
  • Width rule: the greater of 30 in and the box's own width.
  • Handle rule: NEC 240.24(A) holds the center of the highest operating handle at most 2.0 m [6 ft 7 in] above the floor.

The rule in words: each box needs its own clear working space in front of its own face, to the table depth, at the full 30 in width, with a 90 degree door swing. The arithmetic:

  • Panel depth: 8 in of box + 36 in of clear space = 44 in from the wall. Pass.
  • Disconnect depth: 4 in of box + 36 in of clear space = 40 in from the wall. Pass, because the 4 in setback lives inside its own body; the datum is still its own face.
  • Width: the panel is 20 in wide, so 30 in governs. The disconnect is 8 in wide, so 30 in governs again. Two 30 in bands, one in front of each face.
  • Door swing: hinge the disconnect's door on the side away from the panel, and it completes its 90 degree swing inside its own band.
  • Handle height: a disconnect hung with its handle at 5 ft 6 in clears the 6 ft 7 in limit by 13 in.

Result: both enclosures pass as built, faces 4 in apart. The number to carry onto any mixed-depth wall is box depth + 36 in of clear space, for Condition 1 at 600 V or less to ground; meet it from each face and the wall stands. Build the faces flush only when the client or the spec asks. Standoffs sized to the depth difference, or the same footprint ordered deeper, line the surfaces up and move no clearance.

Where the flush-face idea comes from

UL 508A is the standard for listing an industrial control panel, and NEC 409.2 defines that product: an assembly of two or more power circuit components, control circuit components, or both. NEC 409.110 adds the marking duty, so the panel carries an enclosure type number on its label. What UL 508A evaluates is the panel as built: wiring, spacings, short-circuit current rating, the suitability of the box. In practice the fixing details come from the instructions that ship with the enclosure: foot spacing, screw torque, sealing.

Read that way, the standards split cleanly. UL 508A builds and marks the panel. The NEC sets the space around it: working space under 110.26(A), handle heights under 240.24(A). The mounting instructions hold the box on the wall. Nothing in that chain hands anyone a flush-face rule, which is why the demand never turns up in a search of the NEC.

The ordinary-space wording that confuses people belongs to the listing, not to the mounting. Panels listed to UL 508A are evaluated for ordinary locations: unclassified, non-hazardous air. A classified hazardous location needs equipment approved for that hazard, and hazardous-location enclosures are not boxes we build. Keep the listing terms straight on the paperwork as well. A UL listed enclosure has been evaluated by UL to UL 50E, while ours are rated NEMA 4X / IP66 by the manufacturer; not UL listed.

Ceiling and stacked mounts: the checks that do change

A panel hung overhead with its door facing down turns the working space vertical. The 3 ft of clear depth runs from the face toward the floor, and you keep that drop clear so the door can swing its 90 degrees with a person under it. Two numbers still bite. NEC 240.24(A) holds every operating handle at or below 2.0 m [6 ft 7 in] above the floor or platform, so a ceiling disconnect in a container with an 8 ft, 96 in, ceiling leaves 17 in between the handle limit and the roof steel. And where equipment sits above a lay-in ceiling, the NEC asks for an access opening of at least 559 x 559 mm [22 x 22 in] to reach it. The mounting guide carries the height rules in full: enclosure mounting heights and clearances.

Stacking one box above another keeps every number per face and adds one habit: component orientation. Motor starters, many breakers and a lot of relays are built to hang one way, and their instructions say so. Check those sheets before you turn a box on its side or stand a panel on end. That instruction sheet, not a flush-face rule, is the usual reason a ceiling build gets reworked.

For a cabinet sunk into a wall or liner, the geometry gets its own article. Recessed cabinet clearances between frame rails walks the same 110.26(A) numbers with the wall moved forward.

What to put on the order

Spec each box with its own clearance datum, and the argument ends on paper. Put the depth off the wall, the voltage to ground, and the 36 in figure from Table 110.26(A)(1) on the elevation drawing. If the job asks for aligned faces, say so there too, and close the difference in metal: standoffs behind the shallow box, or the same footprint ordered deeper. Our stainless wall-mount enclosures run from 6 x 4 x 4 in up to 60 x 36 x 16 in in 304 and 316L, cut from one piece, and a custom size is delivered in 10 business days from your approval of the drawing.

Pick the grade by the wash: 304 for most indoor and outdoor walls, 316L for salt air, brine and chlorides. The stainless box selection article sorts that choice by environment. And if the open question is whether the disconnect belongs beside the panel at all, why the line side stays live in a separate disconnect enclosure covers that decision.

Catalog dimensions to compare

Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.

EnclosureMaterialOutside H x W x D / displayRating
24 × 20 × 8 in304 stainless24 x 20 x 8 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
10 × 8 × 4 in304 stainless10 x 8 x 4 inRated NEMA 4X / IP66 by the manufacturer; not UL listed

Questions

Do side-by-side enclosures have to be the same depth?

No NEC sentence ties adjacent faces together. NEC 110.26(A) sets clear working space in front of each enclosure from its own face: 3 ft [900 mm] deep at 600 V or less to ground in Condition 1, 30 in wide or the equipment width, 6.5 ft high, with doors opening 90 degrees. A 12 in deep panel beside a 4 in deep disconnect passes as built, and a flush wall passes too, so alignment is a client choice, not a code number.

What working-space depth does a 480 V panel need?

A 480Y/277 V supply puts 277 V to ground, in the 151-600 V band of NEC Table 110.26(A)(1). With a dead front and a closed door the parts are guarded, Condition 1 applies, and the depth is 3 ft [900 mm] measured from the face. Exposed live parts on both sides is Condition 3 and raises it to 4 ft [1.2 m]. Voltages above 600 V need more.

Does a deeper neighbor steal the 30 in of working-space width?

The 30 in [762 mm] band runs in front of each enclosure from its own face, so a deeper box beside it neither raises the shallower box's depth nor eats its width. Hinge the shallower door on the side away from the deep panel so it completes its 90 degree swing, and keep both bands clear of storage. For a wall nobody argues about, align the faces; flush is compliant too.

How do I make different-depth boxes flush if the spec asks for it?

Bring the shallow box forward. Standoffs sized to the depth difference, or the same footprint ordered deeper, align the faces without moving a clearance, because flush is itself compliant. Our stainless wall-mount boxes are cut from one piece in depths of 4 to 16 in, in 304 or 316L, and a custom size is delivered in 10 business days, counted from your approval of the drawing.

What changes when the panel hangs from the ceiling?

The 3 ft working space points at the floor: keep the drop below the face clear to the same depth, and keep every operating handle at or below 2.0 m [6 ft 7 in] above the floor under NEC 240.24(A). In a container with an 8 ft ceiling that leaves 17 in of headroom below the handle limit. Watch component orientation too, because starters and breakers are built to hang one way.

Checklist before you order

Specify it once, built to your drawing

  • Environment and NEMA type: Type 1, Type 3R, Type 4, Type 4X, Type 6P, Type 12, Type 13 (manufacturer ratings, not UL listed)
  • Material: 304 stainless steel, 316L stainless steel, Powder-coated carbon steel, Aluminum, Polycarbonate, Fiberglass (FRP)
  • Size: inside or outside height, width and depth, with the depth your deepest component needs
  • Cutouts, glands and windows, dimensioned from one datum on each face
  • Mounting and access: wall, pole or stand, hinge side, mounting panel
  • Quantity: from one piece

Delivered in 10 business days, anywhere in the world. Counted from your order; for custom work, from your approval of the drawing.

Build it from 24 × 20 × 8 inRequest a custom quote

NEMA 4X enclosures: sizes for this job

Keep reading

More on layout and installation

All articles

Buying guides

The guides behind this answer

All guides