Short answer: fit an M8 bonding stud within 6 in [150 mm] of the shaft-grounding brush gland, land the brush pigtail and every motor ground wire on it, and run one wide braid from the stud to the drive ground terminal taped inside the motor cable bundle. The numbers explain the hardware. A 100 hp [75 kW] motor fed through 60 m [200 ft] of screened cable charges about 45 nF of cable capacitance on every switching edge, and that is a 135 A pulse with a 200 ns rise. A pigtail left loose in air lifts about 340 V on those pulses; the same current on a bundled braid lifts about 34 V, low enough to stay off the bearing film. The brush wears, so put the stud and gland in a hinged-door stainless box you can open for inspection, rated NEMA 4X / IP66 by the manufacturer; not UL listed.
Size the pulse before you buy hardware
Common-mode current is the part of the drive output that leaves on all three phases at once. It has no equal-and-opposite partner inside the cable, so it returns through the screen, the frames and any metal path it can find. Fast IGBT edges drive it through the stray capacitance between winding and rotor. The rotor climbs away from frame potential, and the lubricant film in a bearing becomes the only gap left. Each breakdown pits the races and leaves the washboard pattern called fluting. A shaft grounding brush bridges the rotor to the frame in metal; your job in the enclosure is to keep the rest of that bridge short and wide.
Worked example, with the assumed inputs labeled so you can replace them: a 100 hp [75 kW] motor, 60 m [200 ft] of screened VFD cable. Take the capacitance from your cable datasheet and the edge rate from your drive manual.
- Capacitance: 0.25 µF/km per core, a typical screened VFD cable datasheet value.
- All three cores: 3 × 0.25 µF/km × 0.06 km = 45 nF.
- Edge rate: 3 kV/µs, typical for a low-voltage IGBT output stage; the manual lists the real one.
- Pulse current: 45 nF × 3 kV/µs = 135 A, at full value in about 200 ns (a 565 V bus crossed at 3 kV/µs).
- Loose return: 0.5 m of pigtail in free air is roughly 0.5 µH (EMC handbooks put an unconfined loop near 1 µH/m). V = L × di/dt = 0.5 µH × (135 A ÷ 200 ns) ≈ 340 V.
- Bundled return: braid taped to the cable shrinks the loop about tenfold, near 0.05 µH, and the lift falls to about 34 V.
In this example, 340 V across a lubricant film a fraction of a micrometer thick strikes on every edge, and 34 V stays below it. That is the whole case for the 6 in [150 mm] stud and the bundled braid. It is also why a perfect brush fails when its pigtail wanders across the panel before it lands. If you want the cable screening side worked out the same way, the guide on shielding VFD motor and remote wiring in a steel enclosure covers it.
What you need
- Shaft grounding brush kit matched to the shaft diameter and speed, with a braided pigtail; the kit datasheet lists shaft sizes and wear limits.
- Tinned copper braid with a copper cross-section at least equal to the motor's equipment grounding conductor: 8 AWG is 8.4 mm², and a 12 mm wide braid typically runs 8-10 mm² (confirm on the braid datasheet).
- M8 A2-70 stainless stud with IP66-rated sealing washers for both wall faces; about 15 N·m on lubricated threads is the usual stainless-fastener table value.
- One metallic IP66 gland per cable at the datasheet hole diameter, with a 360° screen clamp for screened motor cable.
- Crimp lugs, internal-tooth star washers, torque wrench, thread lubricant.
- A scope with a rated high-voltage probe for the before-and-after check.
Fit the brush, then cut the box in
-
Set the drive side first. Note the current carrier frequency, find the lowest value the drive manual allows for your motor and cable length, and confirm the motor is inverter duty to NEMA MG1. Above about 100 hp [75 kW], order the insulated bearing option at one end so the brush is not the only discharge path.
-
Mount the brush on the shaft where it runs true and clean, dress a bright ring on the shaft, and bond the brush bracket to the motor frame with its own short braid. Take the paint off under the bracket until you measure bare metal; NEC 250.12 calls for paint removed from grounding contact surfaces, and the bracket counts.
-
Lay out the penetrations on one wall face, within 6 in [150 mm] of each other and clear of the door seam. The cutout designer checks spacing, exports the layout and sends it with your quote request, and the cutouts and glands guide covers hole sizing and sealing hardware.
-
Drill at the datasheet hole diameters, deburr both faces, and fit the gland at its stated torque so it keeps its IP66 rating. Fit the stud with sealing washers on both faces and a star washer inside for the lugs, and pull it to about 15 N·m. The guide on running a ground wire out of an outdoor enclosure and sealing it shows the seal arrangement for a braided exit.
-
Land the conductors in order: brush pigtail lug innermost on the stud, then the motor's equipment grounding conductor, then the screen clamp. Size that grounding conductor from NEC Table 250.122 by the breaker ahead of the drive; 8 AWG copper covers a 100 A device. The guide to grounding screw threads and lug fit shows the lug order and washer stack.
-
Run one braid from the stud to the drive PE terminal taped to the motor cable bundle, tie it every 8 in [200 mm], and keep it against the cable, not across open panel. The current travels pigtail → stud → braid → drive PE terminal and never crosses the gasket or a painted seam. The earth outside is ruled out too: NEC 250.4(A)(5) keeps the ground out of the effective fault-current path, so the bond lands on the drive terminal.
-
Turn the carrier frequency down to the value you noted in step 1, and add the dv/dt filter the manual lists once the leads pass its unfiltered length.
-
Close up with the gasket seated evenly, lid screws to pattern, gland clamps at torque, and the pigtail hanging slack-free inside.
Prove the path before you sign it off
Kill the panel and prove absence of voltage before the first hole, and again before any lug moves. With the work done:
- DC check: four-wire milliohms from stud to drive PE terminal. Half a metre of 8 mm² braid is about 1 mΩ of copper, so read a few milliohms with two lugs and write the number on the panel card.
- Dynamic check: scope the shaft to frame at the speed and load you recorded before the work. The 135 A, 200 ns spikes collapse when the brush and braid carry them; spikes that shrink but persist point at the brush contact, not the braid.
- Wear baseline: watch the millivolt drop across the pigtail while the motor runs; as the carbon wears, the drop rises, and that trend sets your brush-change interval.
- Diagnosis check: fluted or frosted races on the removed bearing confirm the electrical cause; a smooth polish sends you back to alignment and lubrication.
- Seal check: run the normal hose-down and look for weeping at the gland and stud seals before you call the job closed.
The grounding and bonding guide covers the lug and bonding details behind these checks.
Mistakes that cost the rating or the bearings
- Landing the pigtail on a painted or corroded stud; measure bare metal before you trust the joint.
- Routing the motor ground wire home in a separate conduit; the loop puts the 340 V straight back across the bearings, so bundle it.
- Letting the return cross the door gasket or a painted seam; bridge any joint the path must cross with braid and star washers.
- Fitting an unrated plastic gland or an oversize hole; the assembly then holds the rating of its weakest penetrator, so keep IP66 on every datasheet in the wall.
- Raising the carrier to 16-20 kHz to hide motor noise in a quiet room; that fires 8-10 times more edges than a 2 kHz default.
- Bonding the brush bracket through paint; the guide on bonding an enclosure to a motor casing shows the washer-and-braid stack that survives washdown.
The order and the decision
| Job on the floor | What to specify |
|---|---|
| Up to about 30 hp [22 kW], leads under 30 m [100 ft] | Brush kit, stud within 6 in [150 mm] of its gland, bundled braid, carrier at the manual minimum |
| 100 hp [75 kW] class on 60 m [200 ft] | The same, plus a 360° screen-clamping metallic gland and the dv/dt filter the manual lists for the length |
| 300 hp [220 kW] class or longer leads | Add the insulated bearing at one end and treat the filter as standard fit |
| Chloride or sanitizer washdown | 316L box, tinned braid, metallic IP66 glands, brush check added to the PM route |
Send the cutout layout with gland sizes, hole diameters and the stud position; the custom stainless cutouts page shows what the drawing needs, and the stainless size finder narrows wall-mount and HMI boxes by grade and size. We build 304 as the washdown default and 316L where chlorides ride the water; on either grade, chloride stress-corrosion cracking starts above about 60 °C [140 °F], so let hot washdown cool before it soaks the box. We cut the factory penetrations to the gland datasheet and deliver in 10 business days, counted from your order or, for custom work, from your approval of the drawing.
Decide it this way: fit the brush, land its pigtail on a stud within 6 in [150 mm], ride the braid along the cable bundle, and park the carrier at the manual's floor. The 135 A pulses then have a metal path home, and the bearings keep the job they were bought for.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 60 × 36 × 16 in | 304 stainless | 60 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 48 × 36 × 16 in | 304 stainless | 48 x 36 x 16 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 60 × 36 × 12 in | 304 stainless | 60 x 36 x 12 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 12 × 10 × 6 in | 304 stainless | 12 x 10 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Does the brush pigtail replace the motor's ground wire?
You need both, on the same stud. The equipment grounding conductor, sized from NEC Table 250.122 at 8 AWG copper for a 100 A device, carries fault current. The pigtail shunts the 135 A, 200 ns charging pulses, which even a correct ground wire blocks when it runs loose. Land the pigtail innermost and the ground lug behind it.
How far can the brush pigtail run before it lands?
Keep it under 6 in [150 mm] to the stud. In the worked example, every 0.3 m of unconfined wire adds about 0.3 µH and roughly 200 V of lift, so a pigtail that wanders a metre across the panel rebuilds the voltage you are draining. Bundle everything from the stud onward.
Can I drill the gland and stud holes myself and keep the rating?
Yes, when every penetrator holds IP66 on its own datasheet and goes in at its stated hole diameter, panel thickness and torque, with sealing washers both sides of the stud and deburred edges. The assembly keeps the rating of its weakest part. Order the cutouts with the box instead and we cut them to the gland datasheet, delivered in 10 business days from drawing approval.
What carrier frequency calms the bearing current?
The lowest value the drive manual allows for your motor and cable length. A 16-20 kHz setting fires 8-10 times more edges than a 2 kHz default, and field fixes usually land between 0.5 and 1 kHz. Change it in the drive's carrier or PWM setting, then re-check motor heating and the drive's derating.