Remote I/O in a second enclosure 3 m from the CPU

A 3 m gap rules out the CPU's local expansion bus, whose documented cables run about 305 mm, so put a remote-I/O adapter in the second box and use the network the controller documents. Budget roughly 2-3 A of 24 V logic for 126 inputs and 90 relay outputs, and feed the box from its own supply or a 1.5 mm2 feeder that drops under 0.5 V. Start the box at 800 x 600 x 300 mm so it stays near 40 C inside.

NEMA4 Enclosure engineering team · Published November 24, 2026 · 6 min read

Short answer: a 3 m gap rules out the CPU's local expansion bus — those documented cables run about 305 mm end-to-end — so put a remote-I/O adapter in the second box and ride the network your controller documents. Feed the box with its own logic supply sized for roughly 3 A, or run a 1.5 mm² (16 AWG) feeder that stays under 0.5 V of drop. Start the enclosure at 800 x 600 x 300 mm, and 14 modules plus the supply hold it near 39 °C in a 25 °C room. The arithmetic for each number follows.

Can the controller's expansion bus reach 3 m?

Almost never on the local bus: expansion cables for compact local I/O families are documented at about 305 mm end-to-end, so this route takes the controller's remote-I/O network with a bus adapter in the second box.

Count routed cable, not wall-to-wall distance. A 3 m separation becomes about 6 m of routed cable once you add 0.5 m of drop at each gland and a 1 m service loop at each end. Two documented reaches clear that with room to spare: one AS-i segment totals 100 m counting every branch, and CAN-based links are documented around 40 m with 0.3 m stubs. The reach that matters is the one printed for the adapter your CPU supports, and its point count travels with it: 216 new points must fit the adapter's documented limit, not just its cable length.

How much power does the second enclosure need?

Budget about 2-3 A for the logic rail at 24 V DC: an adapter near 300 mA plus roughly 150 mA per 16-point module gives 2.4 A for 14 modules, and a 4 A DIN-rail supply carries it with margin.

Count modules from points first. At 16 points per module, 126 inputs take 8 modules and 90 relay outputs take 6, with 6 points spare — 14 modules and the adapter in total. The 150 mA-per-module figure is a sizing placeholder; relay output modules sit at the top of the range, so read the datasheet of the hardware you pick.

Relay contacts switch field loads, and the contact rating describes the field side, not the logic draw: the 90 switched circuits take power from field terminals, fused per group, not from the logic supply. Fit suppression at every inductive coil, a varistor for AC and a flyback diode for DC. Fuse the supply output and each group as the article on fusing a power supply and motor drivers lays out, and keep the logic-versus-load split straight — the article on putting a 120 VAC power supply and relay inside a small enclosure works the same split in one box.

What conductor keeps a 24 V feeder inside its drop budget?

Use 1.5 mm² (16 AWG) copper for a 3 A feeder over 3 m: the 6 m round trip drops about 0.22 V, leaving the far terminals near 23.8 V and inside a 0.5 V budget.

The arithmetic is short. Copper of 1.5 mm² measures 12.1 mΩ/m at 20 °C, so the out-and-back run is 0.073 Ω, and 3 A across it drops 3 A × 0.073 Ω = 0.22 V. Copper resistance rises about 0.39 % per kelvin, so wiring at 40 °C adds roughly 8 % and the drop becomes 0.24 V. Both sit well under that budget — about 2 % of the rail voltage — and IEC 61131-2 puts the normal operating band for 24 V DC industrial equipment at 20.4 to 28.8 V, so 23.8 V at the farthest module is comfortable.

For 216 new points, mount the supply in the second box and run the AC feed to it: a local supply ends the drop arithmetic and keeps load faults off the logic run. When a feeder does suit the job, the 16 vs 18 AWG article walks the conductor choice.

How big should the second box be, and how hot does it run?

Start at 800 x 600 x 300 mm: 14 modules, the adapter and the supply release about 90 W, and that box's 1.8 m² of stainless surface holds the rise near 14 K, so a 25 °C room ends about 39 °C inside.

The heat math follows the wall-loss method in the enclosure heat calculation guide, with 3.7 W/m²K for a stainless wall. Assume 5 W per module until a datasheet says otherwise: 14 modules give 70 W, the adapter adds 5 W, and a supply delivering 72 W at 85 % efficiency wastes about 13 W — roughly 90 W total. Surface area is 2 × (0.8 × 0.6) + 2 × (0.8 × 0.3) + 2 × (0.6 × 0.3) = 1.8 m², so the rise is 90 W ÷ (3.7 W/m²K × 1.8 m²) = 13.5 K.

A 600 x 400 x 200 mm box has 0.88 m² and lands near 53 °C in the same room, past the 40 °C ambient most industrial electronics carry. Two spare modules push the big box to 100 W and a 15 K rise, so a 35 °C room puts the inside near 50 °C. At that point the fix is one of the manufacturer's rated coolers or vents fitted to their instructions, because a field-cut louvre costs the box its Type 4X rating. Sizing fundamentals sit in the enclosure sizing guide.

How do you route the bus cable past the relay wiring?

Give the network cable its own duct or 100 mm of separation from switched load wiring, cross at right angles where paths must meet, and land the shield the way the network manual draws it, usually at one earth point by the adapter.

Every switching edge across 90 relay outputs throws noise into everything nearby, and the network carries low-level signals with no margin for it. Run the bus in its own duct for the whole routed run, and take any crossing at 90 degrees rather than parallel. Enter through separate glands: network through one, field power through another, so shield work and load wiring never share an entry. A field-cut gland hole without the matched gland costs the whole box its Type 4X rating, so order the cutouts with the enclosure and fit each entry as drawn. The same power-versus-signal split shapes the layout in the CNC control-box layout article.

What goes on the order?

Order the adapter, the modules, the 4 A logic supply, about 6 m of the network's documented cable, and the second enclosure at 800 x 600 x 300 mm with cutouts for two separate gland entries.

  1. Write the I/O schedule first: 126 inputs and 90 relay outputs move to the second box, the original 21 and 15 stay behind the CPU, grouped by field voltage so module types and terminal counts follow.
  2. Pick the network route: the adapter documented for your CPU, with its point count covering all 216 new points and its reach covering the routed run.
  3. Count the hardware: 8 input modules and 6 output modules at 16 points each, one spare of each type, the adapter, and the 4 A supply.
  4. Size the box in stainless and put every cutout on the drawing before it is built; the finished box is rated NEMA 4X / IP66 by the manufacturer and not UL listed.
  5. Split the entries: one gland for the network cable, one for field power, both low on the box where washdown water runs off.
  6. Add the panel hardware: two runs of duct, DIN rail, terminal blocks per field group, suppression parts, and a fuse for each outgoing group.
  7. Buy the cable in the network's documented type, long enough for the 1 m service loops at both ends.

The custom enclosure page builds that width, height, depth and cutout set from one piece, delivered in 10 business days from your approval of the drawing.

Measure the rail at the farthest module with every relay coil pulled in and confirm it stays above 23.5 V there, then run the network's diagnostics to see the adapter and all 14 modules reporting without faults.

  • Isolate the feed to both boxes and verify absence of voltage before the first conductor lands.
  • Powered up, read 24 V at the supply, then at the farthest module under full coil load, above 23.5 V.
  • Check shield continuity from the adapter's earth point along the whole run, as the manual's drawing shows it.
  • Confirm in diagnostics that the adapter is online and every module reports, with no per-module faults.
  • Walk the field side: each group fused, suppression fitted at every inductive coil, polarity confirmed at the field terminals.

Built this way, the gap costs one adapter, one cable run and its own supply — and the second box behaves like another local rack.

Catalog dimensions to compare

Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.

EnclosureMaterialOutside H x W x D / displayRating
10 × 8 × 6 in304 stainless10 x 8 x 6 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
12 × 10 × 6 in304 stainless12 x 10 x 6 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
16 × 12 × 8 in304 stainless16 x 12 x 8 inRated NEMA 4X / IP66 by the manufacturer; not UL listed

Questions

Can one 24 V supply in the main cabinet feed the second enclosure instead?

Yes, while the drop arithmetic passes. Three amperes over 6 m of round-trip 1.5 mm2 (16 AWG) conductor drops about 0.22 V; double the separation to 6 m and the trip doubles, taking the drop to roughly 0.44 V, still inside the 0.5 V budget. Past that, mount the supply in the far box.

What protects the relay contacts switching inductive loads?

Fit suppression at each coil: a varistor across AC coils, a flyback diode across DC coils. A plain diode can stretch a DC relay's release from about 5 ms to 20-30 ms, so add a small series resistor where release timing matters to the machine cycle.

What rating and material suit the second enclosure outdoors?

Type 4X: hose-directed water plus corrosion protection, rated by the manufacturer, not UL listed. Take 316L where salt spray, brine or chemical washdown reaches the box, and 304 for most other outdoor sites. Order the cutouts with the box and fit matched glands, because a field-cut entry without one drops the rating.

Can more enclosures join the same network later?

Chain them while the routed total stays inside the documented reach: one AS-i segment totals 100 m counting every branch, and CAN-based links document about 40 m, so boxes at 3 m steps fit with margin. Give each added box its own supply sized to its own logic load, and the drop arithmetic ends at that box.

Checklist before you order

Specify it once, built to your drawing

  • Environment and NEMA type: Type 1, Type 3R, Type 4, Type 4X, Type 6P, Type 12, Type 13 (manufacturer ratings, not UL listed)
  • Material: 304 stainless steel, 316L stainless steel, Powder-coated carbon steel, Aluminum, Polycarbonate, Fiberglass (FRP)
  • Size: inside or outside height, width and depth, with the depth your deepest component needs
  • Cutouts, glands and windows, dimensioned from one datum on each face
  • Mounting and access: wall, pole or stand, hinge side, mounting panel
  • Quantity: from one piece

Delivered in 10 business days, anywhere in the world. Counted from your order; for custom work, from your approval of the drawing.

Build it from 10 × 8 × 6 inRequest a custom quote

Outdoor enclosures: sizes for this job

Keep reading

More on layout and installation

All articles

Buying guides

The guides behind this answer

All guides