Short answer: cap the bends first, then place the boxes. Keep every stretch of conduit between two pull points under 360 degrees of bend, break straight runs of 300 kcmil aluminum at about 100 ft, and set a pull box after every second 90-degree elbow. One lubricated 90 multiplies pulling tension by about 2.2x, and three in a row pushes sidewall pressure past the 500 lbf/ft aluminum limit. For 3 in conduit, a straight-pull box needs 24 in of inside length and an angle pull needs 18 in. The numbers below use the common wet-site case: 4 x 300 kcmil aluminum through 3 in Schedule 80 PVC.
Count the bends before you price a single box
Draw the run on paper and count every 90. The NEC caps total bends in one conduit run between pull points at 360 degrees, and a pull box resets the count. Six 90s add up to 540 degrees, so that run cannot pull as one piece. One mid-run pull box splits it into two pulls of 270 degrees each; two boxes give three pulls of 180 degrees. That is the code floor.
With 300 kcmil aluminum you go past the floor. Set a box after every second 90 even when the legal count passes, because each elbow multiplies tension and the third in a row breaks the sidewall limit worked out below. Conduit bodies count as pull points too, but an LB holds no splices and gives you a few inches of room. Treat them as corners, and put the real boxes where the pulls start and end.
What a 90 does to the pull
Pulling tension follows the capstan equation: each bend multiplies the arriving tension by e^(μθ), with μ the friction coefficient and θ the bend angle in radians. Pull planners use μ = 0.5 for lubricated pulls on PVC, and a 90-degree bend is 1.57 radians. One elbow therefore multiplies tension by e^0.785 = 2.2, and a dry pull at μ = 0.8 multiplies by 3.5. Sweep radius changes none of this; it sets sidewall pressure instead, SWP = T/r: the tension leaving the bend divided by the radius in feet. Published cable-pulling data keeps SWP at or under 500 lbf/ft for aluminum conductors. A 24 in sweep has a 2 ft radius, so it holds 1,000 lbf of exit tension and no more.
Straight legs add friction the cheap way: T = μ x w x L. Four conductors weighing 2.2 lb/ft together cost you just 110 lbf over a 100 ft pull with lubricant. The bends decide. Long pulls also punish the rope. Rope dragged hard over PVC can burn through the conduit wall mid-pull; preventing rope burn-through in PVC conduit walks through the staging that avoids it.
Worked example: 4 x 300 kcmil aluminum in 3 in Schedule 80
The inputs are pulling-sheet assumptions you replace with your conductor's data: about 0.55 lb/ft per conductor from the aluminum weight tables, 2.2 lb/ft for four; μ = 0.5 with lubricant; 24 in radius sweeps; a 100 ft horizontal straight into three 90s; 3 in Schedule 80 PVC with a 2.938 in inside bore.
- Straight leg: T = 0.5 x 2.2 x 100 = 110 lbf.
- First 90: 110 x 2.2 = 242 lbf, sidewall 242 / 2 = 121 lbf/ft.
- Second 90: 242 x 2.2 = 532 lbf, sidewall 532 / 2 = 266 lbf/ft. Both pass.
- Third 90: 532 x 2.2 = 1,170 lbf, sidewall 1,170 / 2 = 585 lbf/ft, over the 500 lbf/ft limit. The pull fails at the third bend, not from the length.
So the box lands after the second 90. From there the next segment starts near zero, and the whole run peaks at 532 lbf, about 7% of the 7,200 lbf four-conductor allowance. That allowance comes from pulling data at 0.006 lbf per circular mil: 0.006 x 300,000 CM = 1,800 lbf per conductor, 7,200 lbf for four in a shared grip. Fill passes too. Four conductors at about 0.70 in OD take 4 x 0.38 = 1.54 in² of a 6.78 in² bore, 23% against the NEC's 40% ceiling for three or more conductors.
Size the box to the pull, not the pipe
The NEC sizing rule is measured inside the box. A straight pull needs entry wall to opposite wall at least 8 times the trade size. An angle pull needs 6 times the trade size, plus the diameters of any other raceways entering that same wall. For 3 in conduit that is 24 in straight and 18 in angle.
| Pull through the box | NEC minimum for 3 in | Wall-mount box that fits |
|---|---|---|
| Straight pull | 8 x 3 in = 24 in inside length | 30 x 30 x 8 in 304 stainless enclosure, 29.88 in inside |
| Angle pull, one raceway | 6 x 3 in = 18 in inside length | 20 x 20 x 8 in 304 stainless enclosure, 19.88 in inside |
| Angle pull plus a second raceway on that wall | 18 in plus the other raceway's diameter | 30 x 30 x 8 in again |
Both boxes are gasketed stainless with a removable mounting panel, so the EGC lands on a lug and the conductors get a slack loop. Order them with the hub cutouts drawn in. The cutout and hub guide shows what the drawing needs, and custom sizes are delivered in 10 business days from your drawing approval. Gluing PVC to a metal wall is its own question: the Schedule 40 PVC-to-enclosure guide compares the attachment choices, and the Myers hub write-up shows what actually seals on a round field hole. When a hole must be cut on site, the field-drilled entries article keeps the rating through the cut.
Place the pull points step by step
You need the run drawing, 3 in Schedule 80 PVC with 24 in sweeps, the pull boxes from the table, an expansion fitting, supports at 7 ft centers or less, and pulling lubricant. Lock out and verify absence of voltage before opening the existing service equipment.
- Draw the run and count degrees of bend; write each straight leg's length in feet.
- Insert a pull point wherever bends between two points would pass 360 degrees.
- On 300 kcmil sections, add a box after every second 90, legal count or not.
- Break straight legs at about 100 ft; shorten the spacing when a bend cluster waits at the far end.
- Size each box from the table and keep every box accessible with its door clear.
- Support 3 in PVC at 7 ft or less, and set one mid-span cradle on a 12 ft air run between posts.
- Compute PVC movement at about 3.4 × 10⁻⁵ in/in/°F. A 48 ft slab run swinging 60 °F moves 3.4 × 10⁻⁵ × 576 × 60 = 1.2 in. Fit an expansion fitting whose travel is at least 1.5 times that.
- Pull one segment at a time with lubricant, feeding from the box side, and leave a few feet of slack per conductor in each box for re-termination.
Keep the rating under overspray
Type 3R sheds rain and sleet; hose-directed overspray is Type 4 territory, and corrosive water moves you to 4X. The 3R versus 4 guide lines the ratings up, and the outdoor enclosure guide covers the site-side basics. Our wall-mount boxes are rated NEMA 4X / IP66 by the manufacturer; not UL listed.
Material rides on the water. Fresh-water washdown suits 304. Salt, brine or chlorinated process water asks for 316L, whose molybdenum buys pitting and crevice margin. Hot overspray is the trap: 304 and 316L both sit near the 60 °C (140 °F) chloride stress-cracking threshold, so 316L moves pitting resistance, not that line. Keep hot washdown residue from pooling on the box walls; that residue is what starts the cracks.
PVC contributes nothing to grounding, so the equipment grounding conductor rides with the feeder and lands in every pull box; bond each stainless box to it. The grounding and bonding guide covers the box side, and the ground wire exit article shows how a conductor leaves a rated box with the seal intact. Pull XHHW-2 conductors: the -2 mark is the 90 °C wet-location rating that condensation inside a conduit run asks for.
Checks when the boxes are set
- No stretch between pull points carries more than 360 degrees of bend.
- Every straight box shows 24 in of inside pull length; every angle box shows 18 in plus other-raceway widths.
- Sweeps run 24 in radius or larger, with the tension plan at 500 lbf/ft sidewall or less.
- Fill reads 23% on this run, under the 40% ceiling.
- Supports sit at 7 ft centers or less, and the 12 ft air span carries its mid cradle.
- The expansion fitting covers 1.2 in of slab-run movement with margin.
- Every hub is gasketed and tight, and each door gasket seats evenly along its full length.
- The EGC lands and bonds in every box, and a pre-energize insulation test reads clean.
Mistakes that cost the pull or the rating
- Pulling three 90s in one shot. The third bend lifts sidewall to 585 lbf/ft against the 500 lbf/ft aluminum limit. Put the box after the second 90 and the run peaks at 266 lbf/ft.
- Pulling dry to save lubricant. At μ = 0.8 one elbow multiplies 3.5x, so the same 110 lbf straight leg reaches 110 x 3.5 x 3.5 = 1,348 lbf by the second bend and 674 lbf/ft of sidewall. Lube every segment.
- Squeezing pulls through conduit bodies. An LB offers inches of room, holds no splices, and its internal corner adds a full bend's multiplier.
- Undersized boxes. Less than 24 in straight or 18 in angle for 3 in conduit fails the sizing rule and jams the pull.
- Unsealed field holes. Every cut gets a gasketed hub, or overspray walks straight in and the rating ends at that hole.
- No expansion fitting on a sun-exposed slab run. The 48 ft leg moves about 1.2 in across the seasons and snaps glued joints without it.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 30 × 30 × 8 in | 304 stainless | 30 x 30 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 20 × 20 × 8 in | 304 stainless | 20 x 20 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 6 × 6 × 4 in | 304 stainless | 6 x 6 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 8 × 6 × 4 in | 304 stainless | 8 x 6 x 4 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
How far apart can pull boxes be on a straight outdoor PVC run?
The code rule is bends only: 360 degrees between pull points. Straight length is pull planning: break 300 kcmil aluminum at about 100 ft, run 150-200 ft with smaller conductors, and halve the spacing when the next box sees a bend cluster. Box size travels with the run: 24 in inside length for a 3 in straight pull.
Can a conduit body work as the pull point instead of a box?
Yes for a short, straight relief pull. A conduit body holds no splices, offers a few inches of working room against the 18 in a 3 in angle pull asks of a box, and every 90 you park inside it still multiplies tension about 2.2x. Keep conduit bodies at single corners and put the pull box after the second 90.
What rating does the pull box need under regular water overspray?
Type 3R sheds rain and sleet only, so overspray territory is Type 4X. On hot washdown with chlorides, choose 316L for pitting margin, and plan around the 60 C (140 F) chloride stress-cracking threshold both 304 and 316L share. Keep hot residue from pooling on the walls, and seal every hub entry so the box rating survives the conduit wall.
Does a pull box on a PVC run need its own ground connection?
Yes. PVC conducts no fault current, so the equipment grounding conductor runs with the feeder and lands in every box. NEC Table 250.122 sizes it from the overcurrent device ahead of the run: a 200 A feeder takes a 6 AWG copper EGC. Bond each stainless box to that conductor with a solderless lug on the panel or a short ground bar.