Lay the panel out around heat, not around habit. Draw two bands on your backplate: a power band and a control band. The power band takes the control transformer, the 24 VDC supply and the band-heater solid-state relays (SSRs); the control band takes the PLC and its I/O. The relay row carries the spacing its installation sheet states: 3/4 in [19 mm] on the 25 A class in the worked example below. Every relay sits on its specified heat sink, because an 8 A load on a 25 A relay still dissipates about 10 W. The PLC follows its terminal arrangement, not a top-or-bottom tradition: terminal rows on both edges mean wire duct above and below. Then check the box itself. The example puts 67 W into a 30 × 24 × 10 in [762 × 610 × 254 mm] 304 stainless box and raises it about 11 K over a 35 °C [95 °F] plant floor.
What you need
- The installation sheet for every SSR: heat sink model, unit spacing, mounting torque and derating curve. On the 25 A panel-mount class those come out as a named sink, 3/4 in [19 mm] spacing and about 18-20 lb-in [2.0-2.2 Nm] of screw torque.
- Watts and an ambient limit for each device, from its datasheet. Plan the panel around 40 °C [104 °F] ambient unless a named datasheet allows more.
- The transformer rating and the supply output and efficiency: the example uses 500 VA and a 240 W output at 90% efficiency.
- Slotted wiring duct sized on the 50% fill rule that NFPA 79-based duct tables use.
- Your box dimensions and your plant ambient for the heat check.
- The schematic, sorted so you can separate power devices from control devices at a glance.
Two bands, one rule for heat
A sealed box has one heat path: watts in, warm air inside, heat out through the walls. Warm air rises, so a device mounted above another heat producer runs in that producer's exhaust. The fix is geometry rather than height. Put every heat producer in one horizontal row in the power band, and run your output modules in horizontal rows in the control band.
Mounting an SSR at the bottom of the plate keeps its 10 W inside the box. It parks the plume under whatever sits above. Position for wiring convenience, and let spacing and ducts handle the airflow. A full run of 3 in [75 mm] duct between the bands breaks those convection paths and carries the wiring. Do not read the relay's 25 A marking as cooling margin; that rating holds only on the maker's own heat sink.
The transformer belongs in the same row despite its weight. The control transformer heat and layout article works that placement in detail; the backplate and DIN rail layout guide carries the rail and duct geometry behind it.
Lay the panel out in eight steps
- Draw the dividing duct first: one continuous 3 in [75 mm] deep slotted run separating the power band from the control band.
- Fill the power band left to right: line filter at the gland entry, then the 500 VA control transformer, the 24 VDC supply and the SSR heat sink row. The heat figures are about 15 W for the transformer and 27 W for the supply at this load.
- Mount each SSR on its specified heat sink with thermal compound and fins vertical. Set the screws to 18-20 lb-in [2.0-2.2 Nm], keep 3/4 in [19 mm] between units, and leave the free air space described below.
- Place the PLC by its terminals. Terminal rows on both edges: duct above and below. All terminals on one edge: duct below, with the top exits routed sideways.
- Run the I/O and relay modules in horizontal rows beside the controller, and add each module's datasheet watts to your heat total.
- Set the terminal strip along the bottom, within reach of the gland plate. Give large lugs the bending space NEC 312.6 sets at terminals: 2.5 in [63 mm] for 2 AWG with one wire per terminal.
- Check duct fill at 50% and give the crossing run the deepest duct on the plate.
- Sum the watts and run the box check in a later section before the first hole is drilled.
The relay row: watts decide, not amps
Worked example: the molding panel switches a 1.9 kW band heater — 8 A at 240 V AC — through a 25 A panel-mount SSR. While conducting, the relay drops about 1.2 V, the middle of the range this class shows on its datasheets. The conduction loss is volts times amps:
That 10 W flows for as long as the heater holds temperature, which on a molding machine means hours at a stretch. At the full 25 A rating the same relay makes 1.2 V × 25 A = 30 W. The voltage drop stays near constant, so the loss tracks the current almost linearly: part load gives you 10 W instead of 30 W. That is a threefold cut, and 8 A is 32% of rated current. Still, 10 W is a third of the rated heat, not a rounding error.
The 25 A marking is a current limit that holds on the maker's heat sink at a stated ambient. The sink, the thermal compound, the 18-20 lb-in [2.0-2.2 Nm] torque and the 3/4 in [19 mm] gaps therefore stay on your relay-row drawing. Airflow closes the row. Relay makers' selector guides call for free space above and below the heat sink at least equal to the sink's own height, so the rising air has a source and an exit. For the extreme case, what an SSR does in a sealed box without a heat sink shows where unmanaged watts end up.
Where the PLC actually goes
Read your controller installation drawing before anything else: permitted mounting orientation, where the terminal rows sit, how connectors release, and the ambient limit. Then mount to the terminals. A brick-style controller with a terminal row along the top edge and another along the bottom needs wire duct above and below. Leave separation to release a module and withdraw a connector without moving a neighbor. A controller whose field connections all leave the bottom edge needs duct below and sideways routing for the top exits. Reserve room for the service tools, not just the controller's outline.
The top-versus-bottom habit is the wrong question. In the worked example the whole 67 W lifts the box 11 K, and height within the box moves only a share of that. What hurts a controller is sitting directly above a 10 W heat sink row whose base runs tens of kelvin above the surrounding air. Offset the control band from the power band and let the dividing duct carry the warm air on the far side. Whether cabinet power wiring enters at the top or the bottom is the same kind of call: entry direction sets terminal positions, not cooling. For a finished plate laid out this way, a CNC control box layout that puts power supply heat and routing first works a full example.
Duct sized for the cables you have
One wiring-duct maker caps its fill tables at 50% of the duct's interior cross-section, citing NFPA 79 section 13.5.2. The reason is practical: air gaps between round cables mean 50% is all a duct holds anyway. Size your runs at that number. A 3 in × 2 in [75 × 50 mm] slotted duct has a 6 in² [3871 mm²] cross-section, so half of it — 3 in² [1936 mm²] — goes to cable. A 0.5 in [12.7 mm] OD multicore occupies 0.196 in² [127 mm²], so the run carries about 15 of them.
Crossings are where layouts die: the crossing zone carries two runs' cable in one footprint, and multicore bundles turn a corner badly. Put the deepest duct on the crossing run, so a 3 in depth swallows the bundle turning up into the I/O rows. NFPA 79 section 13.3.1 permits nonmetallic duct inside an enclosure when the material passes the IEC 60332-1 flame test, so specify duct rated to that test. Terminal block row spacing next to finger duct gives the clearance numbers where the duct meets the terminal rows.
The box check that decides cooling
Sum the watts before you order the box:
| Device | Heat into the box | Basis |
|---|---|---|
| Band-heater SSR | 10 W | 1.2 V × 8 A = 9.6 W (worked example) |
| Control transformer | 15 W | 3% of 500 VA; dry-type losses run about 1-3% of rating |
| 24 VDC supply | 27 W | 240 W out at 90% efficiency: 240 ÷ 0.9 = 267 W in |
| PLC and I/O | 15 W | datasheet figure assumed for the example |
| Total | 67 W | 10 + 15 + 27 + 15 |
Take a 30 × 24 × 10 in [762 × 610 × 254 mm] 304 stainless wall-mount box. Wall transfer for stainless is 3.7 W/m²K. The surface area works out at 2 × (0.762 × 0.610 + 0.762 × 0.254 + 0.610 × 0.254) = 1.63 m². Temperature rise: 67 ÷ (3.7 × 1.63) = 11 K. A 35 °C [95 °F] plant floor puts the interior near 46 °C [115 °F], which is 6 K over the 40 °C [104 °F] planning value. The next size up, 36 × 30 × 12 in [914 × 762 × 305 mm], gives 2.4 m² of wall and only 7.5 K of rise, or 42.5 °C [109 °F] inside. Size alone does not close this gap.
Then decide by plant:
- Cool floor: the sealed box as drawn carries an 11 K rise, so it stays under 40 °C up to about 29 °C [84 °F] ambient. Build it as drawn.
- Dry indoor air: a filter fan at 100 m³/h [59 cfm] moves air that carries about 33.5 W/K at 1.2 kg/m³ and 1005 J/kgK. The interior then sits near 37 °C at a 35 °C floor. The fan openings change the enclosure rating, so a hose-down spec does not survive them.
- Washdown, salt air or a floor above 35 °C: a sealed cooling unit sized above the 67 W load keeps the rating and the margin.
The example box is rated NEMA 4X / IP66 by the manufacturer; not UL listed, like every enclosure we build. Run your own numbers in the enclosure heat calculator, which gives a sizing estimate rather than a test result. How to size an electrical enclosure carries the NEC working-space and bending-space tables the finished layout must leave room for. How transformer heat loss moves at partial load covers the case where the machine idles and the watts drop.
When the layout is final, send it as the drawing. We cut every cutout on it, and the box is delivered in 10 business days from your approval of the drawing.
Checks before the first hole
- Every heat producer sits in the power-band row, none above another.
- Relay row: specified heat sinks, thermal compound, 18-20 lb-in [2.0-2.2 Nm] torque, 3/4 in [19 mm] gaps, and free air space around each sink at least equal to the sink's height.
- Controller: duct above and below (or below only), connectors withdrawn without moving a neighbor, control band offset from the power band.
- Duct: 50% fill with the crossing run deepest, and duct rated to the IEC 60332-1 flame test.
- Watts against wall area: 67 W and 1.63 m² give 11 K here, under the lowest ambient limit on your drawing.
- Terminal strip in reach of the entries, with NEC 312.6 bending space at the largest lugs.
- Before any drilling or wiring in a panel that has been powered: isolate the feeder and prove absence of voltage at the terminals.
Mistakes that cost the layout
- Reading amps where watts rule: 8 A through a 25 A SSR still makes 10 W, so the heat sink stays.
- Treating bottom mounting as cooling: height moves the plume, the watts stay in the box.
- Stacking output modules in a vertical column: the top module runs in the exhaust of the one below.
- Hanging the PLC over the relay row out of habit: offset the bands and let the dividing duct carry the flow.
- Nominal duct at the crossings: the crossing zone carries two runs' cable, so it gets the deepest duct.
- Ordering the box before the watt sum: 67 W into 1.63 m² decided the cooling question before any hole.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 30 × 24 × 10 in | 304 stainless | 30 x 24 x 10 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 36 × 30 × 12 in | 304 stainless | 36 x 30 x 12 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 16 × 12 × 8 in | 304 stainless | 16 x 12 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 24 × 20 × 8 in | 304 stainless | 24 x 20 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Does a 40 A SSR run cooler than a 25 A unit at the same 8 A load?
No. Conduction loss is voltage times current, and the load sets both sides: 1.2 V across 8 A is about 9.6 W whether the relay frame is 25 A or 40 A. The larger frame buys short-circuit margin, not cooling. Cool the load you have: specified heat sink, thermal compound, 3/4 in [19 mm] between units and the maker's free-air space around the sink.
How much heat do relay output modules add to the layout?
Read each module's datasheet for an energized coil driving a loaded contact — commonly 1-2 W per module, against about 10 W for the heater SSR in the worked example. Sixteen output modules therefore add 16-32 W, more than the SSR row itself. Add the module watts into the box total, and run the modules in horizontal rows so none sits in another's exhaust.
Does the PLC run cooler at the bottom of the backplate?
Height alone buys little. In the worked example the whole 67 W load lifts the 30 × 24 × 10 in box about 11 K wherever the controller sits. What hurts a controller is sitting directly in the warm-air path of the SSR heat sink row or the transformer. Place the PLC by its terminal arrangement, offset the control band from the power band, and let the dividing duct carry the plume.
Which cooling keeps the box sealed when the heat check fails?
A 100 m³/h [59 cfm] filter fan holds the internal air within about 2 K of ambient at a 67 W load, but its openings end the sealed rating of the Type 4X wall. A sealed cooling unit keeps the manufacturer's NEMA 4X / IP66 rating and is sized above the 67 W load. Dry indoor air can take the fan; hose water or salt air takes the sealed unit.