A molded plug almost never fits a stock knockout, so measure the largest diameter of the cord end first, cut the wall to that size plus clearance, and seal it with a cord grip sized to the cable. Ordering the cutout from the factory keeps the seal clean and the rating intact.

NEMA4 Enclosure engineering team · Published October 29, 2026 · 4 min read

You broke out the knockout, held up the power cord, and the molded plug will not pass. It never does: knockouts are sized for conduit fittings, not for cord ends. The fix is to measure the plug, cut the wall to the plug and not to the knockout, and seal the hole with a cord grip or blanking plug. If the box is stainless, the cleanest path is to order the cutout made at the factory and delivered in 10 business days.

This article walks the whole job: measuring, choosing the seal, cutting, and closing up the hole if the knockout you broke out turns out to be the wrong one. For the fundamentals of holes, glands and window openings, see the guide to enclosure cutouts, glands and HMI windows. All ratings below are manufacturer ratings: our enclosures are rated NEMA 4X / IP66 by the manufacturer; not UL listed.

Measure before you cut anything

The plug end is always the widest part of the cord, and it is rarely round. Measure it with calipers at the widest cross-section, usually where the molding flashes or where the strain relief meets the housing. Record two numbers: the largest diameter and the length of the rigid part that must pass through the wall.

Add clearance. For a hole saw you want about 0.06 to 0.13 in [1.5 to 3 mm] of clearance over the measured diameter so the plug passes without shaving. Write the final hole size down before you pick a tool. The same measure-twice discipline applies to connectors, as covered in getting a connector through a cable gland without leaks.

Choose the seal after measuring

The hole size follows the seal you choose, so pick the seal first:

  • Cord grip with a split seal. The seal is two-piece or slit, so you lay the cable in rather than threading the plug. Best for a fixed cord you want to keep intact.
  • Standard cord grip. Requires threading the plug through the gland body, so the gland's inside diameter must exceed the plug. Works when the plug is only slightly larger than the cable.
  • Blanking plug. For the knockout you broke out and do not need. Tape is not a seal; a matched blanking plug with its gasket is.

Match the grip's clamping range to the cable jacket, not the plug, as explained in cable gland clamping range: match the seal to the cable. If you are running data cables too, plan those entries separately; see cable gland for RJ45 connector: sizing and sealing.

Cut the hole

  1. Disconnect power and take the cord out of the box.
  2. Mark the hole center on the outside face, at least one hole diameter from any edge, seam or existing cutout so the wall stays stiff.
  3. Punch a pilot divot with a center punch so the hole saw does not walk.
  4. Cut with a hole saw or step bit sized to your written number. On stainless, keep the cut slow and cooled; the full method is in how to cut a hole in a stainless steel enclosure.
  5. Deburr both faces with a file or a large drill bit twisted by hand. A rolled edge or a burr under a gasket is a leak path.
  6. Trial-fit the plug and the gland body. The plug should pass freely; the gland flange should sit flat on the wall.
  7. Open the split seal, lay the cord in, and assemble the gland to its torque, not beyond.
  8. Pull the cord firmly from outside. The seal should grip the jacket with no visible movement.

Enter from the bottom of the box with a drip loop in the cord, the standard practice in sealing an outdoor junction box. If you must enter from the side, keep the gland axis below horizontal.

Checks when the job is done

  • Hose the area around the entry (a gentle spray, not a pressure washer aimed at the seal) and look for water tracks inside.
  • Confirm the cord carries its strain: a tug should load the gland, not the terminal block.
  • Re-check after the first hot-cold cycle outdoors; seals relax once.
  • Verify the unused knockouts are still sealed. A broken-out hole covered with tape will pass air, water vapor and insects, which is how moisture in an outdoor enclosure and corroded RJ45 connectors starts.

For a full inspection routine, see how to check an enclosure for water ingress after testing.

Mistakes that cost the rating

Cutting the hole oversize so the gland flange falls into it. If the flange does not bear on flat metal the full way around, the seal cannot hold. Order the correct size or use a washer-style flange rated for oversized holes.

Leaving burs or paint under the gasket. The seal seats on the wall condition you give it, not the one the catalog promises. Deburr and clean the mating ring before assembly.

Overtightening the gland. Crushing the seal past its design compression splits it, and the split shows up as a drip months later. Tighten to the manufacturer's torque.

Skipping strain relief. A cord that hangs on its conductors will work the seal open. Add a clamp or a service loop, and remember that what a panel keeps after you modify it is its weakest link, as covered in what NEMA rating a panel keeps after you cut it and mount devices.

When to order the cutout instead

If the enclosure is stainless and you have more than one or two entries, have the cutouts made at the factory. Lay the holes out in the cutout designer, which checks spacing on any face and sends the layout with the quote. A factory hole is clean, deburred and located where the wall can carry it, and the finished box is delivered in 10 business days from your approval of the drawing. For a fixed cord with a big molded end, a factory cutout matched to your measured plug diameter plus clearance is the most reliable seal you will get. See custom stainless enclosures with factory cutouts for the drawing checklist.

Enclosures for this job

Catalog sizes that suit the job this article answers, picked from its subject; open one for its full specifications.

EnclosureMaterialOutside H x W x D / displayRating
12 × 10 × 6 in304 stainless12 x 10 x 6 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
16 × 14 × 8 in304 stainless16 x 14 x 8 inRated NEMA 4X / IP66 by the manufacturer; not UL listed
20 × 16 × 8 in304 stainless20 x 16 x 8 inRated NEMA 4X / IP66 by the manufacturer; not UL listed

Questions

Can I just enlarge a plastic knockout with a file?

On a thermoplastic box you can file the opening, but the result is rarely round and the gland may not seat. A hole saw or step bit gives a clean edge the seal can clamp against. On stainless, use a hole saw or have the cutout made at the factory, as covered in the guide to cutting holes in a stainless enclosure.

What if the plug is only slightly bigger than the hole?

Never force it and never cut the plug off. A plug that is 0.1 in too big still needs the full hole size, and a gouged edge will leak. Enlarge the hole properly or move up to a split gland. Splitting the seal lets the cord pass while the gland still grips the jacket.

How do I seal a knockout I broke out but do not need?

Use a blanking plug matched to the hole size, not tape. A properly seated plug with its gasket maintains the ingress protection the box was built for. Our enclosures are rated NEMA 4X / IP66 by the manufacturer; not UL listed, and an unsealed hole voids even that rating.

Should the power cord enter from the top or the bottom?

Enter from the bottom whenever possible, with a drip loop before the gland. Bottom entry keeps water running down the cord away from the seal. If the cord must enter the side, angle the gland so the cord drops away, and never mount a gland facing up on an outdoor box.

Checklist before you order

Specify it once, built to your drawing

  • Environment and NEMA type: Type 1, Type 3R, Type 4, Type 4X, Type 6P, Type 12, Type 13 (manufacturer ratings, not UL listed)
  • Material: 304 stainless steel, 316L stainless steel, Powder-coated carbon steel, Aluminum, Polycarbonate, Fiberglass (FRP)
  • Size: inside or outside height, width and depth, with the depth your deepest component needs
  • Cutouts, glands and windows, dimensioned from one datum on each face
  • Mounting and access: wall, pole or stand, hinge side, mounting panel
  • Quantity: from one piece

Delivered in 10 business days, anywhere in the world. Counted from your order; for custom work, from your approval of the drawing.

Build it from 12 × 10 × 6 inRequest a custom quote

NEMA 4X enclosures: sizes for this job

Keep reading

More on layout and installation

All articles

Buying guides

The guides behind this answer

All guides