Short answer: feed-thru lugs turn the run to a second panel into an ordinary feeder, so conductors the same size as the breaker are legal the moment their ampacity covers the load. The deciding number is 180 A: that is 4/0 aluminum at 75 °C in the NEC's ampacity table, so a 200 A main over it stands only through the NEC next-size-up allowance, and only while the load stays at or below that figure. Run your load calculation against it, give the detached building its own disconnect, and the meter-main with feed-thru lugs does exactly the job its bus was built for.
What feed-thru lugs actually do
Feed-thru lugs are a second set of lugs at the far end of a panel's bus. They let one panel feed the next with no splice in a gutter: the second panel's load flows through the first panel's bus, out the lugs and down the conduit. The upstream main breaker protects that whole path, exactly as it protects the bus itself.
In a meter-main, the main breaker is the service disconnect, so everything after it is load side. The run to the house or shop is a feeder, and the feeder rules apply: conductors sized to the load, protected by a breaker that fits the NEC's overcurrent rules. Land the feeder on the line side of the downstream panel's main breaker, so that handle doubles as the second building's disconnect. Torque every lug to the value printed on the panel label. The configuration rules for daisy-chained sub-feed lugs walk the chain layout in detail.
Where the same-size objection comes from
Breakers come in standard sizes: 150 A, 175 A, 200 A, 225 A. An ampacity of 180 A matches none of them, and that mismatch is the entire story. The NEC has rules against wire too small for its breaker and none against wire matched to the load it serves. The claim that a sub-feed may not use the same-size wire is a habit, not a clause you can open; the checkable question is whether the breaker protects the conductor within the NEC's overcurrent rules.
The NEC's next-size-up rule is the answer. Where a conductor's ampacity matches no standard breaker size, the next standard size above it may protect the conductor, provided that next size is 800 A or less. Keep one distinction straight while you sort the inspection: the NEC's separate allowance for smaller conductors covers dwelling service-entrance conductors at the meter, not a feeder running between buildings. Your feeder plays by the feeder rules, and the worked example below applies them line by line.
The numbers: 4/0 aluminum on a full-size meter-main at 150 A of load
The inputs:
- Panel: a meter-main with feed-thru lugs, a 200 A main, outdoors in a Type 3R shell.
- Feeder: 4/0 AWG aluminum XHHW-2 phase and neutral conductors in conduit, with lugs and breaker terminations rated 75 °C.
- Calculated load at the second panel: 150 A, all noncontinuous. This is a worked-example figure; put your own load calculation in its place.
- Run length: 40 ft underground. At this length the voltage drop at 150 A stays under about half a percent on 240 V.
The rule in words: the feeder passes when its ampacity covers the load, and its breaker protects it within the NEC's overcurrent rules — one standard size above the ampacity is allowed when the ampacity matches no standard size and the next size is 800 A or less.
The arithmetic:
- Ampacity, 75 °C column of the NEC's ampacity table: 4/0 AWG aluminum = 180 A.
- Load check: 150 A against that leaves a 30 A margin.
- Device check: the ampacity matches no standard breaker size; the next standard size is the 200 A main, far under the 800 A cap, so it protects the 4/0 feeder legally.
Result: keep the meter-main, run 4/0 aluminum, and land it on a main-breaker panel at the second building. The decision, by load:
| Calculated load | Aluminum feeder | Downstream main | Why it works |
|---|---|---|---|
| up to 180 A | 4/0 AWG — 180 A at 75 °C | 200 A | one standard size up under the NEC's rule, under the 800 A cap |
| above that, up to 200 A | 250 kcmil — 205 A at 75 °C | 200 A | ampacity covers the breaker outright, no allowance |
| up to 175 A | 4/0 AWG — 180 A at 75 °C | 175 A | breaker sits below ampacity, no allowance |
Kill and lock the main before you land any of this: with it off, the feed-thru lugs go dead, and the line lugs above it stay hot.
The disconnect the second building still needs
A building fed by a feeder needs a disconnecting means at that building, at or nearest the point the supply enters it; the NEC states that for every structure served by a feeder. The upstream main does not count for the second building. A main-breaker panel there does the job in one move: the feeder lands on its line side and one handle kills everything in the structure.
Mount the panel to the dimensions the code prints. NEC 240.24(A) keeps the center of the highest breaker handle, in its highest position, within 2.0 m (6 ft 7 in) of the floor. NEC 110.26(A) asks for clear working space in front: at least 3 ft (900 mm) deep for a 120/240 V panel in ordinary conditions, 30 in wide, with the door free to open 90 degrees.
Grounding closes the run. Size the equipment grounding conductor from the breaker ahead of it — NEC Table 250.122 calls for 6 AWG copper or 4 AWG aluminum behind the 200 A device — and land it on the bond bar in the new panel. Neutrals stay on their isolated bar. The EGC from the service disconnect to a subpanel and the sub-panel bonding jumper rules walk that split, and the grounding and bonding guide carries the fundamentals.
The enclosure rating at each end
The meter-main sits outside by the meter, so the weather ladder sets its rating. NEMA Type 3R covers rain, sleet and snow on a plain outdoor wall; Type 4 adds hose-directed water and washdown; Type 4X keeps Type 4's water rating and adds corrosion resistance. The NEMA enclosure types guide and the 4X versus IP66 comparison carry the full ladder. Where the panel faces salt spray, brine or daily hose-down, the metal matters as much as the type: hot chloride service above about 60 °C (140 °F) is stress-corrosion territory for both grades, and salt spray is where 316L pulls ahead of 304. The salt-water siting article puts numbers on that choice.
The same thinking covers the box where the underground feeder changes over. Four 4/0 tails need bending room at their terminals — NEC 312.6 sets those minimums for cabinets and cutout boxes — so depth is your friend. A 24 x 20 x 8 in enclosure leaves 23.88 x 19.88 x 7.88 in inside, from the CAD: room to land two conduit hubs and dress the tails. You place the hub cutouts exactly where the conduit arrives, in 304 for a general outdoor site or 316L beside the shore. See the 24 x 20 x 8 in 304 box and the 24 x 20 x 8 in 316L box for that shell.
The wall-mount line runs from 6 x 4 x 4 in up to 60 x 36 x 16 in, in 304 or 316L stainless, manufacturer-rated NEMA 4X / IP66; not UL listed. The how-to-size guide helps you pick the shell.
What goes on the order
- The load calculation number first — it picks the row of the table above: 4/0 AWG to the 180 A load ceiling, 250 kcmil above that, to 205 A.
- A main-breaker panel for the second building: handle under 2.0 m (6 ft 7 in), 3 ft (900 mm) of working space in front, neutral bar isolated from the enclosure.
- The equipment grounding conductor: 6 AWG copper or 4 AWG aluminum behind the breaker.
- Enclosure grade by site: 304 for most outdoor walls, 316L for salt spray and brine, Type 4X / IP66 wherever hose-directed water or washdown is in the plan.
- The cutout drawing: hub positions, panel-mount holes and the shell size. Send the drawing with the quote request on the custom enclosures page; custom work is delivered in 10 business days, counted from your approval of the drawing.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 24 × 20 × 8 in | 304 stainless | 24 x 20 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 24 × 20 × 8 in | 316L stainless | 24 x 20 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Can a 200 A breaker protect 4/0 aluminum feeder conductors?
Yes, while the calculated load stays at or below 180 A. The NEC ampacity table rates 4/0 aluminum at 180 A in the 75 °C column; that figure matches no standard breaker size, so the NEC next-size-up rule lets the next standard size protect it. Above 180 A of load, step to 250 kcmil aluminum, 205 A at 75 °C, and the same breaker covers it outright.
Is there a rule against sub-feeding with conductors the same size as the breaker?
None exists. A feeder through feed-thru lugs is an ordinary feeder: conductors sized to the load, protected within the NEC's overcurrent rules. A same-size rejection usually traces to ampacity — the 20 A shortfall between the conductor and the breaker leans on the next-size-up allowance. The NEC's smaller-conductor allowance covers dwelling service-entrance conductors at the meter, not a feeder between buildings.
What size equipment grounding conductor goes with a 200 A feed-thru feeder?
NEC Table 250.122 calls for 6 AWG copper or 4 AWG aluminum behind a 200 A overcurrent device; behind a 175 A device it drops to 4 AWG copper or 2 AWG aluminum. One edge case: if you upsize the phase conductors for voltage drop, Table 250.122's proportional note asks you to grow the equipment grounding conductor to match. Land it on the bond bar, and keep the neutral on its isolated bar with no bond to the enclosure.
Does a detached garage or workshop panel need its own main breaker?
Yes, a building fed by a feeder needs its own disconnecting means, installed at or nearest the point the supply enters it. A main-breaker panel does it in one move. Mount it so the center of the highest breaker handle, in its highest position, sits no more than 2.0 m (6 ft 7 in) above the floor under NEC 240.24(A), and keep 3 ft (900 mm) of clear working space in front.
What enclosure rating suits the outdoor meter-main and the transition box?
NEMA Type 3R covers rain, sleet and snow; Type 4 adds hose-directed water and washdown; Type 4X adds corrosion resistance. Our wall-mount boxes come manufacturer-rated NEMA 4X / IP66 — not UL listed — in 304 or 316L stainless, from 6 x 4 x 4 in to 60 x 36 x 16 in, delivered in 10 business days anywhere in the world.