Count your panel shop as technical full-time equivalents, not payroll heads: the people who directly design, program, assemble, wire or test panels, with anyone who splits the week allocated by documented hours. Sales, purchasing and office roles go into a separate support total. Counted this way, a 12-person shop reports 9.0 technical FTE plus 3.0 support FTE, with a one-sentence scope statement beside the number. The payroll total says nothing about how many enclosure drawings your engineers can approve in a week or how many panels your bench can wire in a quarter; the FTE split answers both. The count takes about an hour with a current staff list and a spreadsheet, and it is the method to run before you compare shops, plan an expansion, or place a built-to-order enclosure program.
What counts as technical personnel
Count a person as technical when their work produces the panel itself: the drawing, the program, the wiring, the test report. Everything else is support, however necessary. The office manager who chases the courier keeps the shop alive; they add zero hours of wiring capacity.
| Role | Counted as | Why |
|---|---|---|
| Controls or electrical engineer | Technical | Design, drawings, device selection, drawing review |
| PLC or HMI programmer | Technical | Count them as technical even when the badge says engineer |
| Panel assembler and wireman | Technical | The bench hours you are measuring |
| Test technician | Technical | Bench test, QC checks, test paperwork |
| Drafter who also buys parts | Split | Allocate by hours, as in the worked example below |
| Sales, purchasing, reception, office admin | Support | Its own labelled total |
In-house sheet-metal fabrication sits inside the boundary or outside it by declaration. A four-person fab cell adds 4.0 FTE to a report without adding one hour of wiring capacity, so a report that includes fabrication at one shop and omits it at another compares nothing. When you buy enclosures made to your drawing instead, the fabrication hours stay with the enclosure builder and your count runs design through test.
What you need and where the boundary sits
You need three things: the current staff list from payroll, a 40-hour full-time week as the FTE basis, and a boundary sentence written down before anyone starts counting. Then write one sentence that says what the number represents, and print it beside every report:
Add the operating model beside it: a dedicated panel shop, a panel department inside a machinery builder, or an internal shop serving a plant. The same 9.0 technical FTE carries different workloads in the three models. The machinery department shares engineers with the machine line, and the internal shop spends its quarters on plant modifications rather than production orders. Apply one boundary to every shop in a comparison, because when the boundary moves between sites the numbers stop being comparable.
The counting steps
- Fix the reporting date. Current active staff only; peaks, plans and history belong to different reports.
- List every person assigned to the shop. Work from the staff list, not from memory or the company-wide total.
- Assign one primary category per person: engineering, programming, assembly, wiring, testing, fabrication or support.
- Resolve mixed roles in hours. Technical hours / 40 full-time hours = the technical share; document the split once per person.
- Sum two totals, technical FTE and support FTE, each to one decimal.
- Label the result with the scope sentence, the operating model and the date.
A person who splits the week appears in both totals as fractions. The drafter below carries 0.5 and 0.5, and neither total may sum past the hours actually worked.
Worked example: a 12-person shop
The roster below is one reporting date at a dedicated shop with a 40-hour full-time week.
| # | Role | Split of the week | Technical FTE | Support FTE |
|---|---|---|---|---|
| 1 | Controls engineer | Full time | 1.0 | — |
| 2 | Controls engineer | Full time | 1.0 | — |
| 3 | PLC programmer | Full time | 1.0 | — |
| 4 | Drafter and buyer | 20 h drawings, 20 h purchasing | 0.5 | 0.5 |
| 5 | Assembler-wirer | Full time | 1.0 | — |
| 6 | Assembler-wirer | Full time | 1.0 | — |
| 7 | Assembler-wirer | Full time | 1.0 | — |
| 8 | Assembler-wirer | Full time | 1.0 | — |
| 9 | Test technician | Full time | 1.0 | — |
| 10 | Shop lead | 20 h wiring and test, 20 h scheduling | 0.5 | 0.5 |
| 11 | Office manager | Full time | — | 1.0 |
| 12 | Sales | Full time | — | 1.0 |
The two splits resolve in one line each: 20 h / 40 h = 0.50 technical for the drafter, and the same for the lead. The technical total is 2.0 + 1.0 + 0.5 + 4.0 + 1.0 + 0.5 = 9.0 FTE, and support sums to 0.5 + 0.5 + 1.0 + 1.0 = 3.0 FTE. The report line reads: 9.0 technical FTE, design through test, fabrication excluded, plus 3.0 support FTE, 12 people on payroll, dedicated panel shop. Every use that follows — throughput, hiring, ordering — hangs off the 9.0 and its label.
Checks that prove the count
- The technical total equals the sum of its categories: 2.0 engineering + 1.0 programming + 4.0 assembly and wiring + 1.0 test + 0.5 drafter + 0.5 lead = 9.0.
- Each person appears once; the drafter carries 0.5 plus 0.5, and 9.0 plus 3.0 gives 12.0 FTE from 12 people.
- Engineering and assembly are both present, and programming and testing sit in their own lines rather than inside a general engineering title.
- Sales, purchasing, reception and office admin appear in support only.
- Contractors carry their own label: 9.0 technical FTE, of which 1.5 contract.
- Every comparison carries the scope sentence and the operating model.
Turn the count into capacity with your own history. A shop that wired 36 panels in a 13-week quarter at an average of 8.0 technical FTE ran at 36 / 8.0 = 4.5 panels per technical FTE per quarter, about 0.35 a week. At 9.0 FTE on the same panel mix, the same history predicts 9.0 x 4.5 = 40.5, call it 40 panels a quarter. Builds listed to UL 508A, the listing standard for industrial control panels (see what a UL 508A listing involves), run well below that rate; simple repeat panels run above it. The rate is your baseline, recomputed after any change in panel mix.
Mistakes that corrupt the number
| Symptom | Likely cause |
|---|---|
| Reported headcount far above visible bench staffing | Admin, sales or purchasing roles inside the technical total |
| Two shops, equal headcount, unequal output | Different scopes, complexity or outsourcing levels |
| Engineering overloaded while totals look healthy | Disciplines lumped into one number |
| A machinery builder looks larger than a dedicated shop | Non-panel machine staff in the count |
| A vertically integrated shop looks inefficient | Fabrication counted at one site only |
| Today's count beside a historical peak | Two periods and two scopes in one comparison |
The costliest slip is the double count: a drafter reported as 1.0 technical and 1.0 support turns the 12-person shop into 13.0 FTE. Padding the technical total with office roles produces a bigger number and a useless one; the fix is the boundary sentence, not inflation.
Using the count when you order enclosures
When the shop orders built-to-order enclosures, the FTE split shows which side constrains the program. Our side is rarely the constraint: a custom 304 or 316L stainless enclosure, rated NEMA 4X / IP66 by the manufacturer; not UL listed, is delivered in 10 business days counted from your approval of the drawing. Approval is your step, and it consumes engineering FTE.
Budget it with arithmetic. At 2 engineering hours to check and return an enclosure drawing, 2.0 engineering FTE carries 2.0 x 40 / 2 = 40 drawing reviews a week. A 40-panel program spread over a 13-week quarter runs at 40 / 13 = 3.1 panels a week, which needs 3.1 x 2 = 6.2 engineering hours for approvals. Review capacity is comfortable; the bench is the constraint, and the bench is exactly what the 9.0 measures.
Send drawings that review fast: the custom enclosure drawing package lists what to include, drawing verification before fabrication catches errors before they cost a cycle, and the enclosure builder puts size, material, cutouts and mounting on the order. For repeat production, the enclosure kitting workflow and the panel builder evaluation checklist keep hours per panel where the count says they are.
The report line for each shop type
- Dedicated panel shop: the count as worked above, with fabrication declared in or out.
- Panel department in a machinery builder: add the panel share of shared engineering and commissioning hours, and state it: 9.0 technical FTE, including 0.4 FTE of shared machine commissioning.
- Internal plant shop: count the hours that went to panel builds, and label the remainder as plant support rather than panel capacity.
Whichever model applies, one scope sentence beside the number turns 12 heads into a figure you can plan with, compare with and order against. Buying the enclosure side in keeps the count honest: custom stainless enclosures built to your drawing leave fabrication hours off your report entirely.
Catalog dimensions to compare
Compare these catalog dimensions with your component layout. Open each enclosure for its rating, material and usable space, then check those specifications against your application.
| Enclosure | Material | Outside H x W x D / display | Rating |
|---|---|---|---|
| 12 × 10 × 6 in | 304 stainless | 12 x 10 x 6 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 20 × 16 × 8 in | 304 stainless | 20 x 16 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
| 24 × 20 × 8 in | 304 stainless | 24 x 20 x 8 in | Rated NEMA 4X / IP66 by the manufacturer; not UL listed |
Questions
Is an owner who still wires panels one technical FTE?
Allocate by hours, the same as any mixed role. An owner who spends 30 of 40 hours at the bench wiring and testing is 30 / 40 = 0.75 technical FTE, and the remaining 10 hours of quoting or purchasing go to support. Record the split once and reuse it, so the next report and every shop comparison use the same documented percentage.
How do you count contractors in the technical total?
Classify contractors by the same categories as employees, then report them on their own labelled line: 9.0 technical FTE, of which 1.5 contract. Mixing contract hours into the payroll count hides the employment boundary and makes trends unreadable. Three half-week contractors are 3 x 0.5 = 1.5 FTE, not 3 heads; keep employee and contract totals beside each other in every report.
What is the difference between headcount and technical FTE?
Headcount counts people; FTE counts hours. A 12-person shop where two people split the week between technical and support work reports 9.0 technical FTE plus 3.0 support FTE. Report both numbers with the scope sentence: headcount matters for payroll and safety training, while the FTE total is what throughput, drawing review and ordering plans hang on.
Does sheet-metal fabrication staff count as technical personnel?
Only by declaration. If your shop bends and welds its own backplates and enclosures, include the fab cell and label the report fabrication included; four fab hands add 4.0 FTE with no wiring hours behind them. If you buy enclosures made to your drawing, those hours sit with the enclosure builder and stay off your count. Declare the choice on every report.